Search Documents

  • SME
    Barrick?s Zaldivar Mine Gets A Dome Cover Over Its Stockpile

    The Barrick Zaldivar mine is an openpit, heap-leach copper mine in Region II of northern Chile at an elevation of 3,300 m (10,826 ft), approximately 1,400 km (870 miles) north of Santiago and 175 km (

    Jan 1, 2009

  • NIOSH
    RI 4052 Buck Creek Corundum, Clay County, NC

    By T. J. Ballard

    "INTRODUCTION The Buck. Creek corundum area of Clay County, North Carolina, includes one of the largest single masses of peridotite outcrops in the whole Appalachian Range and has been described by Pr

    Apr 1, 1947

  • SME
    Regrind Mills: Scaleup Or Screwup

    As ore deposits become finer grained the requirements for regrinding before cleaning or leaching have increased substantially. Despite this increasing need, there is no standard test to predict grind

    Jan 1, 2011

  • CIM
    Ore pass database: Quebec underground metal mines

    By J. -F. Lessard

    Most underground mines rely on ore pass systems to ensure the transport of ore and waste. The design and operation of ore pass systems often rely on past experience, which is often anecdotal and at ti

    Jan 1, 2006

  • SAIMM
    The Determination Of The Residual Strength Of Hard Rock Crush Pillars With A Width-To-Height Ratio Of 2:1

    By D. P. Roberts

    This paper reviews the use of crush pillars on mines in the Bushveld Complex and the Witwatersrand Supergroup. Stress measurements were undertaken in order to determine the residual strength of these

    Jan 1, 2005

  • SAIMM
    Bateman Mega DMS Modules- Successes And Challenges - Introduction

    By N September, R Abate

    Bateman Modular (previously Van Eck and Lurie) has been building and supplying the mining industry with modular DMS plants for the last 30 years. These DMS modules range in capacity from 1 tph to 200

    Jan 1, 2006

  • SME
    HW Process Technologies, Inc. Engineered Membrane Separation (EMS™) Operations In Mining Applications

    Membrane technology has been available for over 36 years, but has been used sparingly in the general mining industry. However, recent developments in polymer chemistry, spiral wound element construct

    Jan 1, 2007

  • AUSIMM
    Overburden stripping using large slushers

    By Lumley G, Rowlands D

    The overburden slusher (OS) is proposed as a stripping tool that is expected to find application in overburden stripping operations including open cut coal and oil shale mines. OS is expected to comba

    Jan 1, 1986

  • SME
    Magmont Mine Closure Under Missouri Metallic Minerals Act

    By M. F. Bradley, G. M. Schoen

    The Magmont Mine, a 50/50 venture between Cominco American Incorporated (the Operator) and Dresser Industries, Inc., (Halliburton), is a metallic mining and milling facility in the new lead belt of Mi

    Jan 1, 2001

  • SME
    Tunnel Excavation Grand Coulee Third Power Plan

    By D. J. Duck

    INTRODUCTION Construction of the 3,600,000 kilowatt Third Powerplant at Grand Coulee Dam started in late summer 1967 approximately one year after authorization by Congress. The project was made pos

    Jan 1, 1997

  • AUSIMM
    Recent Developments in Stress Analysis and Live Reclaim Prediction within Iron Ore Stockpiles

    By K C. Williams, A W. Roberts, J D. Prigge

    For stockpile design, the flowability and structural interfaces are critically dependant on the stress conditions throughout the pile. Historically, the predictive methodologies for stress determinati

    Aug 12, 2013

  • CIM
    Water Management Design for Cigar Lake Uranium Mine

    By Ken Dyck Sr.

    "Construction of the Cigar Lake uranium mine in northern Saskatchewan is well under way. Production is anticipated to begin in the first half of 2007. When in full production, the mine is projected to

    Jan 1, 2006

  • DFI
    Statnamic Load Testing; Overview And Case Histories Of Augered Cast-In-Place Piles

    By Mike Muchard

    Augered cast-in-place piles are one of the most cost effective deep foundation options available to designers but have been largely underutilized due to skepticism associated with quality assurance an

    Jan 1, 2000

  • AUSIMM
    Study on the Effects and Mechanics of Na2SO3 to Chalcopyrite and Galena

    Study on the Effects and Mechanics of Na2SO3 to Chalcopyrite and Galena

    Sep 13, 2010

  • SME
    Numerical Analysis of Time-Dependent Creep Behaviour of Tunnel Support Systems

    By R. Chen

    Most tunnels built in Sydney encounter similar ground situations; they penetrate either the Hawkesbury Sandstone or the shales that lie beneath the city. Tunnels in these materials are generally sup-p

    Jan 1, 2008

  • SME
    Concreting the Queens Tunnel, New York City Water Tunnel No.3

    By Edward M. Dowey

    The concrete lining for a long 8.05 km (5 mi) section of New York City Water Tunnel No. 3 was cast in place. The contractor, Grow-Perini-Skanska, placed over76,841 m3 (100,505 cy) of concrete, pouring

    Jan 1, 2001

  • AUSIMM
    Sypnosis Heavy Mineral Deposits

    By Stitt P. H

    In Australia, the term "heavy mineral deposits" is used to denote sands which contain variable but economic quantities of the minerals rutile, ilmenite and zircon, often with minor amounts of monaz

    Jan 1, 1988

  • AIME
    Producing – Equipment, Methods and Materials - Effect of Anisotropy and Stratification on Pressure Transient Analysis of Wells with Restricted Flow Entry

    By H. Kazemi, M. S. Seth

    The effects of anisotropy and stratification on flow behavior and production performance of oil and gas wells have been studied by numerous authors.1-3 Lefkovits et al.l studied the performance of tot

    Jan 1, 1970

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • DFI
    Resolution Of Prestressed Concrete Pile Splice Problems - Summary

    By David Siu

    Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea

    Jan 1, 1991