    Long Term Stability Of Mine Workings In Soft Floor Environment: Geomechanical Investigations At Cooranbong Colliery

    By Vasundhara

    Underground coal mining in soft floor environments has often led to strata control problems ranging from small scale issues such as floor heave which disrupts traffic and ventilation, rib spalling and

    Jan 1, 2001

  • SME-ICGCM
    A Study On The High-Water Solidifying Materials For Gob-Along Roadside Instead Of Coal Pillars

    By Yunxin Qiu

    A new technology has been introduced - the use of the High-Water Solidifying Material for providing pumped roadside supports to maintain a roadway for re-use in longwall retreating. As a gob edge supp

    Jan 1, 1992

  • SME-ICGCM
    RYBAD Empirical Field Model For Prediction Of Maximum Land Subsidence Associated With Longwall Coal Mining

    By Thomas Rymer

    Mathematical modelling of mine subsidence measured at 21 locations in Pennsylvania and northern West Virginia allows for the refinement of current methods of predicting maximum land subsidence associa

    Jan 1, 1988

  • SME-ICGCM
    A Design Approach For A Swelling Rock In An Underground Mine In Türkîye

    By A. G. Pasamehmetoglu

    The swelling process is an important problem causing damages to the structures in or on swelling rocks, both during construction and operating life. To understand swelling problem, a number of testing

    Jan 1, 1992

  • SME-ICGCM
    Case Studies Using Mine-Wide Monitoring Systems For Geotechnical Evaluations

    By John P. Dunford

    U.S. Bureau of Mines researchers are investigating the ability of mine-wide monitoring systems already in place at many coal operations to provide a direct link between geotechnical instruments and th

    Jan 1, 1993

  • SME-ICGCM
    Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining

    By Qiang Fu

    ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element

    Jan 1, 2002

  • SME-ICGCM
    A Method For Establishing Site Specific Coal Pillar Design Guidelines

    By Winton J. Gale

    Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factors,

    Jan 1, 1992

  • SME-ICGCM
    Improvement in Pre-Tensioning of Strand Bolts in Australian Coal Mines

    By Mietek Rataj

    Installation of pre-tensioned Strand Bolts i.e. resin grouted cable bolts is very common now in Australian coal mines. A short historical development of this type of rock reinforcement is outlined Var

    Jan 1, 2002

  • SME-ICGCM
    Effects of Longwall Mining on Streamflow in the Pittsburgh Seam Basin

    By Kenneth L. Johnson

    The effects of underground longwall coal mining on flow in perennial streams within the Pittsburgh seam basin were evaluated. Four streams above four different longwall mines were studied. Overburden

    Jan 1, 1997

  • SME-ICGCM
    Ground Control Problem Associated with Longwall Mining of Developed Pillars

    By T. N. Singh

    Board and pillar system of mining has beer, practised in India in view of abundant availability of cheap labour force, low investment and quick return. Subsequently, selective mining from thick seems

    Jan 1, 1984

  • SME-ICGCM
    Mapping and Application of Roof Joint Patterns for Ground Control inAn Illinois Mine

    By Kenny D. Basnett

    An analysis of the Roof Falls Data Base (RFDB) for underground coal mines in Illinois for the period 2004?2008 indicated that about 80% of the roof falls occur at intersections and are associated with

    Jan 1, 2011

  • SME-ICGCM
    Rock Bursts In Human Collieries

    By Guang Ping Cui

    In this paper the imminent relationship between rock burst and its phenomenon with normal rock pressure and its appearance, as well as the factors of one changing into another have been analyzed. Base

    Jan 1, 1984

  • SME-ICGCM
    An Underground Trial Of Cable Slings For Remedial Support Of Longwall Gateroads

    By William D. Gallant

    This paper describes a joint cooperative project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to conduct a trial of split set cable slings for re

    Jan 1, 1990

  • SME-ICGCM
    Elasto-Plastic Finite Element Structural Stability Analysis Of Room And Pillar Mine Workings (1726bb0c-5e63-4f04-a636-538432c37ec9)

    By S. Bensehamdi

    An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine structur

    Jan 1, 1992

  • SME-ICGCM
    A probabilistic approach to ground support design in underground mines,

    By Kevin Beauchamp

    In many cases traditional support designs cover the many variations in ground conditions and bolt performance by a conservative factor of safety. The result is that most bolts are ineffectual most of

    Jan 1, 2003

  • SME-ICGCM
    Introduction of a Measurement Based Ground Control Management System to a Deep Level Potash Mine

    By Alexandra Garcia

    A measurement-based ground control management system, commonly employed in coal mines, has been successfully implemented in a UK potash mine operating at a depth of over 800 m. This system includes th

    Jan 1, 2014

  • SME-ICGCM
    Basic Procedures for Monitoring and Modeling Abandoned Underground Coal Mines for Safety Due to Uncontrolled Closures: Case Study of Verdinho Mine, Santa Catarina State, Brazil

    By Selmar A. Oliveira

    "Safe mine closure is an important step in the mining lifecycle. Plans for safe and efficient closure should begin at the inception of mining. Ideally, closure occurs when the reserve has been deplete

    Jan 1, 2017

  • SME-ICGCM
    BHP Billiton Underground Ground Control Fatal Risk Control Protocol ? Development and Application

    By Dan Payne

    Roof falls and other ground control incidents make up a significant portion of fatal accidents in underground mines. BHP Billiton has undergone a review of all fatalities in their operations and divid

    Jan 1, 2006

  • SME-ICGCM
    A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine Roof

    By Syd Peng

    In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l

    Jan 1, 2005

  • SME-ICGCM
    Recent Advances in Numerical Simulation of Cutter Roof Failure in Underground Coal Mines

    By Murali Gadde

    Numerical simulation of cutter roof failure is a daunting coal mine excavation design issue. The complex progressive failure mechanisms associated with cutter failures are extremely difficult to repli

    Jan 1, 2005