Sizing Of Final Stumps For Safer Pillar ExtractionBy Christopher Mark
Pillar recovery continues to be one of the more hazardous activities in underground coal mining. Safety requires that the roof above the intersection remain stable until after the pillar has been extr
Jan 1, 2001
-
Probabilistic Analysis of Blasting Impact on Open Pit Stability (95ce6127-68ed-453f-9268-476a1af1dd45)By Dae S. Young
A new probabilistic approach is introduced for slope stability analysis including adverse impact of blasting vibrations. The material strength within a slope area is randomized in this bi-variate join
Jan 1, 1984
-
Optimizing Secondary Tailgate Support SelectionA model was developed to facilitate secondary tailgate support selection based on analysis of over 100 case studies, compiled from two different surveys of operating longwall coal mines in the United
Jan 1, 1996
-
Geomechanic Monitoring And Distributed Information SystemsBy G. I. Gritsko
In this paper we consider the elements of a distributed information geomechanic monitoring system which is used in computerized mine planning and mining operations control. The automated system is a t
Jan 1, 1996
-
Time-Dependent Behavior Of Rocks: Laboratory Tests On Hollow CylinderBy Gilles Rousset
This paper presents laboratory experiments conducted on hollow cylinders samples. The advantage of such a geometry is to approach in situ conditions around cylindrical openings (lined galleries, boreh
Jan 1, 1989
-
Improved Intersection Design And Monitoring In The Sydney CoalfieldBy G. R. Corbett
The introduction of roof bolts to Phalen Colliery in the Sydney Coalfield, Nova Scotia (annual output of 2Mt) has been successfully implemented in maingate and tailgate entries over the last four year
Jan 1, 1995
-
Analysis Of Entry Roof Failure And Falls At Springvale CollieryBy Wm. Mark Hart
High horizontal stresses and shear failure have been considered the major reasons that cause entry roof failure and falls for underground mining. Therefore, reorientation of the current mining systems
Jan 1, 1996
-
Coal Pillar Strength Based On The Ground Reaction Curve - A New ApproachBy Kazem Oraee
In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i
Jan 1, 2009
-
Subsidence Misconceptions And MythsBy Richard E. Gray
Subsidence due to coal mining is poorly understood by non-specialists. This has led to numerous misconceptions and myths based on limited observations and lack of knowledge. The three most common are:
Jan 1, 1996
-
Trail Mountain Mine: A Case Study For Improving Locations Of Mining-Induced Seismicity With Double-Difference Relocation (2de3a4ff-91be-4a02-947a-fc4fd7ffaac8)By Eleanor Sonley
In October 2000, temporary seismographic stations were installed above the Trail Mountain Mine, Emery County, Utah, USA to supplement a regional network. Over seven months, 1826 mining-induced seismi
Jan 1, 2009
-
Two Case Studies Of The Performance Of Rib SupportsBy M. K. Larson
The U.S. Bureau of Mines conducted a study to evaluate support interaction between conventional bolts and the rib at two Western coal mines. The principal goal was to develop guidelines for designing
Jan 1, 1996
-
An Evaluation Of Strata Behavior And Tailgate Support Performance At Eagle Nest MineBy T. P. Mucho
Strata behavior and support performance were evaluated in a longwall tailgate test area at the Eagle Nest Mine near Van, WV. The mine operates in the Eagle coalbed which ranges in height from 4 to 6 f
Jan 1, 1996
-
An Application Of Energy Release RateBy Morgan M. Sears
In recent years, one large mine collapse and numerous smaller bump events have resulted in a renewed interest in coal bump research. With numerical modeling, the Energy Release Rate (ERR) calculation
Jan 1, 2009
-
Mine Stability MappingBy Collin L. Stewart
The high cost and limited flexibility of modern longwall systems has resulted in the need for mine engineers and geologists to predict possible adverse mining areas ahead of mining and to then design
Jan 1, 2006
-
Computer Modeling Of Rock Mass Geomechanic State In Longwall DesignBy V. D. Jalevsky
A new methodology of an experimental-analytical approach has been developed. It is used in building an information geomechanic monitoring system for the modeling of geomechanic processes during coal s
Jan 1, 1996
-
Innovation In Control Of Geomechanical State Of Undermined Rock Mass And Deformations Of Earth SurfaceBy F. N. Voskoboyev
The suggested new method for control of geomechanical state of undermined rock mass ensures, as a safety measure for the earth surface protection, the decrease of deformations by 2,5 - 10 times in min
Jan 1, 1996
-
Prediction of surface movement with emphasis on horizontal deformation due to miningBy Mao Bai
In predicting the integrity of under-mined structures, surface horizontal displacements and curvatures are frequently of greater importance than the more homogeneous vertical displacements. Accurate e
Jan 1, 1989
-
Airbag Support for Ground Control in Thin Seam Coal MiningBy Fan Shaogang
In this paper, the airbags' structure and technical characteristics and its applications in China are described. Based on the practice of the airbags in mining thin seams, the effects on ground c
Jan 1, 1997
-
New Developments In Headed Rebar Ground Support (e1369dc5-cd64-41ac-8b6d-861d8d628824)By Roland C. Walker
Traditional headed rebar has existed in the mining industry as a ground support product for many years. The head of a rebar bolt is most commonly produced by hot upset die forging. Upset die forging
Jan 1, 2009
-
Geotechnical Mapping By Seismic Imaging In Underground MinesBy W. J. Mcgaughey
A crosshole seismic imaging (tomography) experiment has been carried out in an underground mine in order to delineate waste rock within a massive sulphide ore body. Data comprising 1526 travel time me
Jan 1, 1989