Initial Results From Implementing a Laminated Overburden Model Into ARMPSBy Peng Zhang
In a recent research effort, a laminated overburden loading model (as implemented in LaModel3.0 was compared with the results of ARMPS 2010, and the laminated overburden model was found to more accura
Jan 1, 2013
-
Investigation of Pillar Loading Considerations in Determination of Pillar Stability Factors for Longwall Gateroad DesignBy Heather E. Lawson
Recent field data providing measured pillar loading from a deep western mine revealed that an increased load transfer distance existed compared to expected values (Larson et al., 2012). Additionally,
Jan 1, 2013
-
Analysis of Coal Pillar Stability (ACPS): A New Generation of Pillar Design SoftwareBy Zach Agioutantis, Christopher Mark
"Thirty years ago, the Analysis of Longwall Pillar Stability (ALPS) inaugurated a new era in coal pillar design. ALPS was the first empirical pillar design technique to consider the abutment loads tha
Jan 1, 2018
-
Evaluation Of Subsidence Parameters For Inclined Seams In UK CoalfieldsBy X. L. Yao
This paper analyses the effects of mining extraction geometry (width/depth ratio) and dip of seam on subsidence parameters based on a large Database, containing 120 longwall mining cases all within th
Jan 1, 1990
-
Mine-Wide Physical Property Trend Identification Using Portable Onsite Test DevicesBy Thomas L. Vandergrift
The type and severity of coal mine entry failures are affected by the strength and stiffness properties of the roof, floor, end coal. Knowledge of the mine-wide trends of these properties Is valuable
Jan 1, 1990
-
Ground Control Experiences in a High Horizontal Stress Field at Inland Steel Coal Mine NO. 2,By C. Thomas Blevins
This paper is intended to be a hands on experience account about ground control in a Southern Illinois coal mine. Its aim is to show how a combination of real world mining practices and constraints al
Jan 1, 1984
-
Development of a Risk Rating System for Use in Underground Coal MiningBy Johann van Wjk
Mandatory Codes of Practice to Combat Rock Fall Accidents came into force on South African Collieries in 1997. These were drawn up in accordance with guidelines issued by the Chief Inspector of Mines,
Jan 1, 2002
-
Resupporting High Roof FallsBy Nicholas Chlumecky
One of the most dangerous jobs in mining is that of resupporting the roof after a fall has occurred. The resulting cavity may be more than 30 feet high, with relatively unstable sides and roof. It is
Jan 1, 1981
-
Design Optimization of Longwall Chain PillarsBy Behdeen Oraee, Amirhossein Bangian, Kazem Oraee
"Determination of the optimum design of chain pillars has a significant effect on the economics and safety of longwall operations. Most pillar design formulae are based on empirical methods and supple
Jan 1, 2010
-
3D Modelling of Mine BackfillBy Muhammad Zaka Emad, Rangzeb Goraya, Muhammad Usman Khan
"Numerical modeling has been used extensively to assess the stability of surface and underground mines. Tabular, steeply dipping ore bodies are generally mined out by open stoping methods with delayed
Jan 1, 2017
-
Geotechnical Considerations for Longwall Top Coal Caving at Austar Coal MineBy Adrian L. Moodie
Austar Coal Mine (formerly Southlands and Ellalong Collieries) has had a long association with difficult strata control conditions associated with mining depth and a highly jointed/cleated coal seam.
Jan 1, 2011
-
Fiber Reinforced Polymer Rockbolts for Ground Control in a Strong Jointed Rock MassBy Samrat Mohanty
The construction of underground hydrocarbon storage caverns in Jurong Island, Singapore, is nearing completion. The facility, located beneath the seabed of Banyan Basin, is comprised of five storage
Jan 1, 2014
-
Roofbolting In The Cape Breton Development Corporation's Phalen CollieryBy B. Macdonald
In 1991, roofbolts were introduced as a primary support for inseam retreat longwall entries at CBDC's Phalen Colliery. Increasing mine depth (+550 m) necessitated replacing conventional inseam st
Jan 1, 1994
-
Longwall Shield Recovery, Using Phenolic Foam Injection for Gob Control As An Alternative to Recovery MeshBy James D. Pile
Following a methane ignition in the active panel of a longwall coal mine, the affected panel was successfully isolated from the rest of the mine. This allowed for the remainder of the mine to return t
Jan 1, 2013
-
High Performance Longwall Production Based on Rag Experience in German Coal MinesBy Bolger Witthaus
"High performance production under challenging geological conditions is a product of several parameters. Main factors are the technical equipment and the knowledge in processing. The design and the su
Jan 1, 2010
-
A Roof Model and Its Application in Solid Backfilling MiningBy Meng Xiao, Peng Huang, Lizin Lan, Feng Ju, Shuai Guo
"Through changing the axial load on backfilling material compaction test to reflect different overlying strata pressure on backfilling material, the stress-strain relations in the compaction process o
Jan 1, 2016
-
Nondestructive Testing and Safety Evaluation of Bolt SupportBy Houquan Zhang, Ming Li, Guimin Zhang, Bei Zhang
"The support quality of bolts in deep roadways is one of the important factors for efficient and safe coal production. A new kind of non-destructive testing technique and equipment was used to monitor
Jan 1, 2016
-
Discriminating Mining Induced Seismicity from Natural Tectonic Earthquakes in the Wasatch Plateau Region of Central UtahBy Kristine L. Pankow, Keith D. Koper, Michael K. McCarter, Jared R. Stein
"The Wasatch Plateau region of central Utah contains a number of active underground coal mines in an area of well-documented natural seismicity. As a result, there are several hundred seismic events r
Jan 1, 2015
-
What Factors Over and Above Those Included in the Existing Coal Mine Roof Rating (CMRR) Could Also Be Predictive of Roof Instability in Underground Coal Mines?By Elizabeth Holley, Meriel Young, Gabriel Walton
"The coal mine roof rating (CMRR) was developed by Chris Mark and Greg Molinda to bridge the gap between geological variation in underground coal mines and engineering design. The CMRR accounts for th
Jan 1, 2018
-
A Case Study of a Low Overburden Longwall Recovery with Pre?Developed Recovery EntriesBy John C. Stankus
The 3 Right pre-developed longwall recovery entry at Signal Peak Energy?s Bull Mountain No. 1 mine was designed to prevent the abnormal roof conditions encountered in its firsttwo recovery entries. Un
Jan 1, 2014