Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Minus 48 Mesh Refuse Disposal At Gary Central Coal Preparation PlantBy E. D. Hummer
During the planning phase of the fine coal cleaning addition at the Gary Coal Preparation Plant, careful consideration was directed toward the problem of minus 48 mesh refuse disposal. The plant flow
Jan 1, 1965
-
Rock Tunnels at High Water Pressure: Non-Continuous Pressurized TBMs Versus Slurry - RETC2021By Brad Grothen, Lok Home
The choice of TBM type is never easy, but it becomes especially challenging when faced with a hard rock tunnel with expected high water flows and pressure. Slurry Shield tunneling has a long history o
Jun 13, 2021
-
Selection and Application of Cutoff Grades in Underground Mine Planning—Practical Application - SME Annual Meeting 2024By Paul Schmidt, John Barber
This paper discusses the determination of cutoff grade (COG), including all revenue and cost factors and how to apply the COG in the world of engineering studies and mine planning for underground mine
Feb 1, 2024
-
Optimizing Froth Zone in Larger Flotation Cells Through Innovative Spider Crowder Upgrade - SME Annual Meeting 2024By C. Cardoso, G. Bermudez, A. Jalili
Bigger flotation cells can result in larger froth surface areas and longer froth transport distances, this has been credited to impact froth recovery. Thanks to recent advancements, the newer flotatio
Feb 1, 2024
-
Design And Simulation Analysis Of Dewatering HydrocyclonesBy AJIT SWAIN, SUNATI MOHANTY
The ability to predict the dewatering performance of an industrial hydrocyclone from a laboratory-model hydrocyclone is of great importance. In this study, laboratory-scale hydrocyclone experiments we
Mar 1, 2023
-
HPGR rolls surface wear: In-line scanning of a laboratory-scale HPGRBy Raj K. Rajamani, Samira Rashidi
Wear is an extremely important topic when considering high-pressure grinding rolls (HPGR) for any new application. Given the inevitable variations in ore properties throughout a mine’s life, it is dif
-
The Advanced Cu Rougher Scavenger at Doe Run’s Buick Pb/Zn/Cu Mill—Its Design, Construction, Operation, Expert Control, and Its Wide Implications to All Doe Run Mills - SME Annual Meeting 2025By Brian Mangogna, Clay McNail, Weishi Mang, Adam Steimel
Together with innovatively applying modern flotation reagents and developing the breakthrough mill enterprise expert control and operating system, Doe Run Buick Mill constructed an advanced large copp
Feb 1, 2025
-
Leaching behavior of lithium from bauxite residue using acetic acidBy Ning Wang, Tengfei Guo, Wanyan Li, Hanjie Wen, Hannian Gu, Zehai Li
Red mud has been reported as a potential resource for lithium. To investigate the leaching behavior of lithium, a lithium-rich red mud was neutralized with hydrochloric or oxalic acid and then leached
-
Detailed Fire Safety Design of Subways for Arson-Initiated Design Fires Innovation, Coordination, ImplementationBy Sandeep Upadhya, Marc Morgan, Baljinder Bassi, James Fletcher, Mike Deevy, Nishant Nayan
"In order to protect public safety in the event of a deliberate fire attack, underground rail authorities are increasingly considering the need to design for arson-initiated fire scenarios. Where typi
Jan 1, 2016
-
Vibration Spectral And Operating Parameters In Ball GrindingBy Y. Zeng
Experiments were performed under batchwise wet grinding conditions with dolomite mineral. The vibration signal was received by an accelerometer and transmitted to a mini-processor. The signal was firs
Jan 1, 1992
-
A Hydrodynamic Approach for Sizing and Selection of Hydrocyclone—Parametric Scaling and Process Optimization - SME Annual Meeting 2024By Debra Switzer, Swapnil Urankar, Douglas Watson, Steven Hunter, Chandranth Banerjee, Shashank Pathak
A hydrocyclone is a piece of equipment commonly used as a classifier in mill circuit operations. Traditionally, hydrocyclone performance is characterized by the classification efficiency parameter, su
Feb 1, 2024
-
Risk Mitigation for the Big Walnut Sewer Tunnel Construction in Columbus, Ohio - NAT2024By Rob Herr, Irwan Halim, Heather Marsh
This project will expand sanitary sewer within the City of Columbus. It consists of 2.5 mile long, 72-inch finished diameter pipe grouted inside 10.8-foot diameter tunnel excavation in shale. This pap
Jun 23, 2024
-
A New Proposal for a Mining Induced Seismicity Indicator using Earthquake's Frictional Energy RaSiM10 (Rockburst): 2022 ProceedingsBy Rodrigo Estay Huidobro, Andrés Martinoli, Claudia Pavez-Orrego
The effects of induced seismicity caused by mining activities are one of the main problems that the mining industry faces. Although it has been documented by countries with a great mining tradition (U
Apr 26, 2022
-
Probabilistic Quantification Of Uncertainty In Predicting Mine Pit-Lake Water Quality (8bb3ab18-1516-4bf4-9057-f861e8ded8f0)By J. H. Kempton
The scrutiny given to model predictions of pit-lake water quality has focused attention on the uncertainty associated with long-term predictions. Although comparison of probabilistic predictive modeli
Jan 1, 1998
-
An Approach To Decrease Error And Increase Data Reliability In Drill Sampling For GoldBy F. P. Schwarz
Even in an otherwise care-fully done sampling procedure, reducing subsample weight, or splitting, when the grain size of material is too large commonly generates significant error. Such error can be e
Jan 1, 1992
-
Integrated Systems Of Automated Operational Dispatcher Control Over Coal Minig Enterprise Using Expert SystemsBy N. I. Fedunets
The development of variousworks on automatising of operational processes at coal¬extractive and coal-mining enterprises introduces an ever growing necessity to carry out investigations in the wide ran
Jan 1, 1992
-
A Surface Geotechnical In-Pit Underground Portal Relocation: An Operations-Based Case Study - SME Annual Meeting 2024By Russell J. Sheets
Reactivation of highwall slope failures during adverse weather had intermittently impacted haul road access into a previously mined open pit. These impacts ranged from limited access to full closures;
Feb 1, 2024
-
Statistical, Medical And Biological Aspects Of The Sputum Cytology Program For Uranium Workers In Ontario.By J. D. Cooper, D. W. Thompson, J. Basiuk, W. Cass, R. Ilves
The Department of Thoracic Surgery and Pathology at the Toronto General Hospital have had a long standing interest in the early detection and treatment of carcinoma of the lung. Our initial experience
Jan 1, 1981
-
Grinding experience at AftonBy J. Lovering, H. Wilhelm, P. Siewert
Introduction The Afton property is located 290 km (180 miles) by air east-northeast from Vancouver and 14 km (8.7 miles) west of Kamloops, a city of 60,000 people, in south central British Columbia
Jan 1, 1987
-
Slurry Rheology Influence on the Performanceof Mineral/Coal Grinding Circuts Part 2By Richard R. Klimpel
Part 2 of this article continues the discussion of a 10-year, multimillion dollar research and plant testing program on slurry rheology and grinding circuits. The first part of the article (ME, Dec. 1
Jan 1, 1983