Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Conceptual Design for a Deep Underground Science and Engineering Laboratory Cascades

    By Roberto J. Guardia, Robert A. Robinson, John Wilkerson, Wick Haxton

    Several candidate sites have been proposed for the Deep Underground Science and Engineering Laboratory (DUSEL), a facility that would provide over 2000 meters of overburden to screen out cosmic rays t

    Jan 1, 2005

  • SME
    The Regulation Of Coal Mine Subsidence In Colorado

    By James A. Pendleton

    In response to Public Law 95-87 (SMCRA), Colorado promulgated regulations governing the mining of Coal. These regulations require the prediction, monitoring and mitigation of "material damage" caused

    Jan 1, 1986

  • SME
    Underground Mine Management Systems

    By James Wm. White

    Today a large number of open pit mines use computer-based mine management systems to automatically assign haul trucks, track equipment, and manage information. Now advances in digital communications a

    Jan 1, 1996

  • SME
    Importance of Longwall Mining to the Coal Industry

    By James F. Kvitkovich, George V. Weisdack

    Longwall mining techniques were introduced into U.S. bituminous coal mining operations in the early 1960s. These techniques were gradually adopted by many mines during the 1970s. By 1983, considered

    Jan 1, 2005

  • SME
    Reaction Kinetics Of Ferrous Regeneration For Alternate Anode Reaction Technology

    By E. A. Sarver

    The Fe(II) regeneration process is an important aspect of Alternate Anode Reaction Technology (AART) for copper electrowinning (EW). In AART, Fe(II) is oxidized to Fe(III) at the anode during EW, and

    Jan 1, 2007

  • SME
    Design And Construction Of The Lenihan DAM Outlet Tunnel And Shaft

    By Hemang Desai

    A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig

  • SME
    Carbonate Separation From Sedimentary Phosphates Through Bioflotation

    By N. A. Abdel-Khalek

    The amenability of carbonate separation from a sedimentary phosphate ore using a bioflotation process was studied. Two types of bacteria were chosen for this study. The experiments were performed usin

    Jan 1, 2009

  • SME
    Uranium Mining In Arizona Breccia Pipes –High Grade And Safe

    By K. Wenrich

    The uranium industry has made a dramatic turnaround in the past three years that even the most optimistic economist was not willing to predict during the uranium downswing of the 1990s. Uranium reach

    Jan 1, 2007

  • SME
    Subsurface Repository Ventilation Design

    By Edward Thomas

    Yucca Mountain Overview The U.S. Department of Energy?s Yucca Mountain Project is a geologic repository project designed to receive, handle, package, transport, and emplace spent nuclear fuel and hig

  • SME
    Raleigh-Durham International Airport, Westside Storm Water Management Facility Project

    By L. M. Lenahan, J. D. Sheets

    INTRODUCTION The Raleigh-Durham International Airport (RDU) in North Carolina is the fourth largest airport in the southeast region of the United States. The Raleigh-Durham Airport Authority is cur

    Jan 1, 2005

  • SME
    Using Geometallurgical Models To Aid In Metallurgical Testwork For Pre-Feasibility Projects, La Colosa, Colombia

    The La Colosa, Colombia porphyry gold deposit is currently in the pre-feasibility stage. This large deposit has many types of gold mineralization: native gold, electrum, and tellurides. These variatio

    Feb 27, 2013

  • SME
    Development Of A Percussion Assisted Rotary Drilling System For Blasthole Drilling

    By J. W. Langford

    A more effective method of fracturing and chipping the formation is necessary to significantly increase the productivity of blasthole drilling with a roller cone bit. The conventional rotary blasthole

    Jan 1, 2011

  • SME
    Problem of Tunnel Construction in Himalayan Region: An Actual Encounter

    By M. D. Khattar

    Problems discussed concern encountering of high temperatures [up to 66°C] and heavy flow of water [150 L.P.S] during the construction of the 10.15 MØH.R.T. for the 2500 MW Nathpa Jhakri Hydro Power Pr

    Jan 1, 1999

  • SME
    Synthesis Of Monolithic Si2n2o Ceramic From Reclaimed Silicon And Desert Sand

    By M. Radwan, S. Shimada, S. Z. El-Tawil, K. A. El-Barawy, Y. Miyamoto

    This study presents the results of synthesizing monolithic siliconoxynitride, Si2N2O, ceramic from a mixture composed of reclaimed silicon and natural desert sand by using the nitriding combustion syn

    Jan 1, 2004

  • SME
    Use Of Mimo Models In Spreadsheets For Control Of A Column Flotation Circuit

    By K. Terhaar, K. Prisbrey

    The objective was to determine operating protocols for a lead and silver column flotation cleaner, being considered for installation at Sunshine Mining & Refining Co.’s Kellogg mill in Northern Idaho.

    Jan 1, 1999

  • SME
    The Importance Of Geologic And Geotechnical Monitoring For Improving Stability In Deep Two-Seam Longwall Layouts

    By K. Fleck

    Energy West Mining Company (EWMC) has implemented a geologic program for improving stability and support requirements along deep two-entry longwall gateroads at its Deer Creek Mine operations located

    Jan 1, 2012

  • SME
    Flocculation Dewatering Of Phosphatic Clay

    By D. Tao, R. Honakey, B. K. Parekh

    The dewatering of stable phosphatic clay suspensions generated from phosphate beneficiation in the central Florida is an issue of practical and theoretical importance. Because of its tiny particle si

    Jan 1, 2006

  • SME
    A Discussion On TBM Cutter Change Time And Cutter Life

    By E. Farrokh

    Estimation of the cutter life and cost is a part of evaluating performance for a hard rock TBM in any project. Various approaches has been proposed for calculation of disc cutter life in various rock

    Feb 27, 2013

  • SME
    East Side Access project taking shape beneath the streets of Manhattan

    Beneath some of New York?s most iconic buildings ? The Met Life Building, the Helmsley Building, the Waldorf Astoria ? crews are busily at work on the Metropolitan Transportation Authority?s long-awai

    Jan 3, 2010

  • SME
    Hydrologic evaluation of post-closure flooding and dewatering of the Homestake Mine

    By Guosheng Zhan

    The Homestake Mine included the open cut and underground workings up to 2,484 m (8,150 ft) deep. The mine ceased mining activities in December 2001 after 125 years of operation. Pumping from the under

    Jan 4, 2010