Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Up-to-date Excavation, Support, and Lining Solutions Meet Timing Requirements for the First Two Tunnels of the 2006 Winter Olympic Games

    By Georgios Kalamaras, Chiaia Dinu, Platania Paolo, Alessio Carlo, Giampiero Cirvegna, Claudio Santucci

    The Project alignment initiates north of Pinerolo, along the State Road 23[S.S. 23] that is one of the principal arteries to the northwestern Alps where a number of Olympic events for the 2006 Winter

    Jan 1, 2005

  • SME
    A study of total dynamic analysis method for deepseabed integrated mining system

    By Hyung-woo Kim, Sup Hong, Sung-Soo Kim, Chang-Ho Lee

    A deep-seabed integrated mining system, which consists of four subsystems such as riser pipe, buffer, flexible riser, and tracked vehicles, is presented in Figure 1. In order to collect more manganese

    Sep 1, 2014

  • SME
    Two-phase optimization methodology for the design of mineral flotation plants, including multispecies and bank or cell models - Mining, Metallurgy & Exploration (2018)

    By E. D. Gálvez, L. A. Cisternas, R. Acosta-Flores, F. A. Lucay

    Froth flotation processes are carried out in flotation cells that are grouped into banks, and these banks are interconnected, forming a flotation circuit. A literature review shows the existence of pa

  • SME
    Sulfide Biooxidation: Pilot Heap at Gilt Edge

    By John W. Shield

    Oxide gold reserves are being rapidly depleted, especially in regions with long histories of gold mining, such as the Black Hills of South Dakota. However, these districts often have substantial addi

    Jan 1, 1996

  • SME
    Liebherr?s T282 B trucks operating in Brazil

    In September, a fleet of 363-t (400-st) Liebherr trucks became operational in Brazil and have already begun moving iron ore in Para state. Prior to the arrival of the the trucks the Brazilian fleet

    Jan 1, 2010

  • SME
    AECL's Mine-By Experiment - From Concept To Construction

    The Canadian concept for nuclear fuel waste disposal is being assessed by AECL Research in a series of experiments at its Underground Research Laboratory (URL) near Lac du Bonnet. Manitoba, Canada. As

    Jan 1, 1991

  • SME
    Nonfuel Minerals Projections – Why They Were Wrong

    By Ira Sohn

    This article revisits global projections made in 1981of eight metallic and fertilizer minerals for the year 2000. The objectives here are to quantify the differences between the projected and observe

    Jan 1, 2005

  • SME
    Are Long TBM Tunnels Faster by TBM?

    By Nick Barton

    A recent analysis of 145 TBM tunnels of more than 1000km total length has helped to quantify the time dependence of utilization (U). In fact U = Tm, where T is time in hours and m is a negative gradie

    Jan 1, 2001

  • SME
    An Evaluation Of The Strength Of Slender Pillars

    Pillars with width to height ratios of less than 1.0 are frequently created in underground hard rock mines. The strength of slender pillars can be estimated using empirically developed equations. Ho

    Jan 1, 2006

  • SME
    Demonstrating the Financial Impact of Mining Injuries with the Updated Safety Pays in Mining V2.0 Web Application - SME Annual Meeting 2024

    By J. R. Heberger, B. H. Ngo

    The Safety Pays in Mining v2.0 web application, developed by the National Institute for Occupational Safety and Health (NIOSH) Mining Program, helps mines determine the potential costs associated with

    Feb 1, 2024

  • SME
    Accurate monitoring and control of flotation cells

    By Carl Pinches

    Underground or surface mining is only the first stage in the ore mining process. Once the ore is mined, it is transported to the surface for further processing. Generally, this is done to extract the

    Jan 1, 2010

  • SME
    Ressure And Flow Investigation Of An Axial Booster Fan With Variable Blade Settings ? Experimental And Cfd Approach

    By A. Habibi

    A study has been undertaken on two 1.12 m diameter industrial booster fans operating under different blade settings powered by a 1200 rpm motor at the Missouri University of Science and Technology. Th

    Feb 27, 2013

  • SME
    The Modeling And Simulation Of Bucyrus Shovel, Part 1: Spacial Kinematics And Virtual Prototype Modeling - Preprint 09-122

    In this study, a 3D model of the shovel motion based multi-body system dynamics in the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) environment was developed. The kinematics model of the s

    Jan 1, 2009

  • SME
    New Approach Of ASFINAG For Tunnel Construction Monitoring Of The Tauern Tunnel Project In Austria

    By Robert Schnab

    ASFINAG is responsible for the construction and operation of the Austrian highway system. It is approx. 2,400 km of highways and 65 tunnels with a total length of 200 km including the Tauern Tunnel.

  • SME
    Conveyor Pulley Specifications For Aggregates

    By D. Keech

    The Conveyor Equipment Manufacturers Association (CEMA) specification B105.1 “Welded Steel Conveyor Pulleys” adequately defines standard pulleys for most aggregate material handling applications. How

    Jan 1, 2003

  • SME
    Road Condition Monitoring Utilizing UAV Photogrammetry Aligned to Principal Curve of Mine Haul Truck Path - Mining, Metallurgy & Exploration (2024)

    By Martin Langenderfer, Catherine Johnson, Alexander Douglas

    Mine haul roads degrade rapidly due to extreme loads on sub-optimal construction materials. Unmanned aerial vehicles (UAV) are suited to quantify large-area road-network conditions, such as surface ro

    Dec 19, 2023

  • SME
    Influence of Rock Mass Properties on Performance of Hard Rock TBMs

    By Jamal Rostami, Richard Kastner, Ahmad Ramezanzadeh

    Improving the accuracy of the performance prediction models for hard rock Tunnel Boring Machines (TBMs) is important in estimation of the schedule and cost of tunnelling in related projects. The effec

    Jan 1, 2005

  • SME
    Construction Of The North Dorchester BAY Cso Storage Tunnel In Boston

    By J. Davies

    This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long

  • SME
    Effect of micro-bubbling on settling behavior of fine particles for deep-sea mining

    By Rei Arai, Yuta Yamamoto, Tetsuo Yamazaki, Naoki Nakatani

    "Methane hydrate is of interest as an alternative energy resource in Japan and the R&D program has been ongoing for ten years (MH21: http://www.mh21japan.gr.jp/english/). Rare-earth element-rich deep-

    Sep 1, 2014

  • SME
    Performance of Tunnel Segments Reinforced with Synthetic Macro Fibers - RETC2021

    By Todd Clarke, Ralf Winterberg

    For more than a decade the tunneling industry has explored the potential and benefits of macro synthetic fiber (MSF) reinforced concrete solutions for precast tunnel segments. Parallel to industry inv

    Jun 13, 2021