Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Bond Legacy - SME Annual Meeting 2024By R. E. McIvor, Brian Cornish, J. A. Finch, Yue Tan, Claude Gagnon
Fred C. Bond is recognized throughout the mineral processing world as the father of comminution equipment applied science and engineering. The Bond Work Index became a universal standard, and is the m
Feb 1, 2024
-
Mining And Community Development: From Rethoric To PracticeBy E. Sirolli
In recent times, with rare exceptions, most economically viable ore discoveries have been large, low-grade and located in remote parts of the world. Mining companies have often shown to be incapable o
Jan 1, 2012
-
TARP Tunnel Boring Machine Performance ChicagoBy William A. Macaitis, Frank E. Dalton, Leo R. DiVita
The Metropolitan Water Reclamation District of Greater Chicago's Tunnel and Reservoir Plan (TARP) is a multi-purpose urban public works project with a total cost of $3.7 billion. Currently 51 mil
Jan 1, 1993
-
Possibilities And Limitations Of Waterjet-Assisted Tunnel Boring In German Coal MinesBy Wilhelm Knickmeyer, Johannes Henneke
PREFACE For about 1 year Bergbau-Forschung GmbH, central research institute of the German Coal Mining Industry, undertakes full size tests for waterjet assisted tunnel¬boring in German coal mines (
Jan 1, 1979
-
Increased Prodcution Planned at Anshan Iron and SteelThe Anshan Iron and Steel Co. (AISC) broke its steelmaking design capacity in 1978, bringing its total production of steel products to 6.86 Mt. Located south of the industrial city of Shenyang, Liaon
Jan 3, 1980
-
Developing And Implementing An Occupational Health And Safety Management System: Finding The Right Approach To OHSAS 18001:2007 ? IntroductionBy A. S. Haugh
OHSAS 18001 is a series of international standards for occupational health and safety management. It is comprised of two parts, 18001 and 180029. OHSAS 18001 was formulated by international certify
Jan 1, 2012
-
China’s Mineral Priorities and Current ProjectsBy Sabina Brady
Investment in the ferrous sector between 1981 and 1985 will total about $9 billion, or 7.6% of the state budget for capital assets. The money will primarily go to complete the first stage of the Baosh
Jan 8, 1983
-
Abstract Page - Site-Specific Prediction of Ground Vibrations Inducedby BlastingBy S. A. Shoop, J. J. K. Daemen
Site-specific blast vibration prediction can be more accurate than using a universal prediction equation. Vibrations from 37 blasts were monitored using three seismographs. Data analysis showed that s
Jan 3, 1985
-
Technical Note - Borealis Project: A Fast-Track Approach to Mine DevelopmentBy W. E. Coughlin, R. L. Faverty, F. H. Lightner
Introduction The intent of this paper is to present the general strategy and method of implementation to achieve a "fast-track" mine development. The major objectives of a "fast-track" or rapid devel
Jan 11, 1983
-
Oversize Reduction Project At The Iron Ore Company Of Canada (ME)The Iron Ore Company of Canada (IOC) is the largest manufacturer of iron ore pellets in Canada and its customer base covers North American, European and Asian steel producers. The company operates a m
Jan 1, 2011
-
Bold and Visionary Planning of Tunnels and Underground Space ? IntroductionBy Harvey W. Parker
Our industry has developed to the skilled, experienced and productive industry that we now enjoy as a result of the visions of great engineers throughout history, but, in particular for their visions
Jan 1, 2008
-
Discovery and Geology of the Turquoise Ridge Gold DepositBy E. J. Berentsen
The Turquoise Ridge gold deposit is located near the Getchell Mine, 72 km (42 miles)northeast of Winnemucca, NV (Fig. 1). The deposit is owned by Getchell Gold Corp. The host rocks consist of Ordovic
Jan 1, 1996
-
Discussion – Classification effects in wet ball milling circuits – by R. E. McIvor Technical Papers, MINING ENGINEERING, Vol. 40, No. 8 August 1988, pp. 815-820By K. Holmberg, D. Herriot
This paper by Mr Mclvor is yet another contribution to the eternal controversy surrounding the benefits, or otherwise, of high circulating loads in closed circuit grinding. Throughout the paper it is
Jan 1, 1989
-
Geotechnical Design of Devil’s Slide TunnelBy Y. Nien Wang, Moe Amini, Heiner Sander, Max John
INTRODUCTION As the population increased along the coast route (California Route 1), and the people’s need to have guaranteed access increased, the landslides and related road closures began to ha
Jan 1, 2005
-
Liberation Limited Dolomite Rejection from Pebble Phosphate in Gravity Concentration Mining, Metallurgy and ExplorationBy Chen-Luh Lin, Jan D. Miller, Sindhoora Puvvada
The depletion of good-quality phosphate resources, coupled by a need to supply acceptable products at a rapid rate, while meeting the specifications of fertilizer chemical plants, is of significant co
-
Non Contacting Sensor Technology For Measuring Level And DensityBy T. Hart
Nuclear gauging is used world-wide in almost every industry. From mining and ore-grading to finished product, the metallurgical industry is one of the biggest users of nuclear sensors for inventory,
Jan 1, 2011
-
Newmont Gold Company Post Mill Grinding CircuitBy David L. Hill
Newmont Gold Company's Mill No. 4 is located along the Carlin trend, about 25 miles North of Carlin, Nevada. The plant consists of a primary grinding circuit using a 7.2 m (22 ft) diameter by 2.6
Jan 1, 1993
-
Continuous Surface Mining Equipment: How to Achieve SuccessBy Edward DeLilla
For the past 30 years, surface mines have moved toward more highly mechanized, automatic systems that continuously mine overburden and ore to increase productivity, lower operating costs and minimize
Jan 1, 1994
-
Ice-Cemented Backfill For Underground Support In Arctic MinesBy V. Izaxon
Current practice in mining frozen, underground placers is to support the mine openings by leaving remnant pillars, which are kept frozen to maintain their stability. These pillars may be partially ext
Jan 1, 2004
-
Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021By David Mast, Irwan Halim, Seung Han Kim
Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,
Jun 13, 2021