Optimization For The Determination Of Transportation System In Open-Pit MinesBy Q. X. Yun
This paper presents a new approach to optimize the transportation system in open-pit mines. The new approach employs artificial intelligence, fuzzy sets, dynamic programming and CAD technique to deter
Jan 1, 1992
-
The Installation And Operating Experiences Of The Mundix Mine Monitoring System At The Freeman United Orient No. 4 MineBy Thomas S. Bubanovich
This paper will discuss the installation and operation of the Mundix Monitoring System at the Freeman United Coal Mining Company's Orient No. 4 Mine. Detailed explanations of the objectives set b
Jan 1, 1987
-
Mathematical Modeling of Leaching Kinetics with Diminishing Driving ForcesBy Edgar E. Vidal, Patrick R. Taylor
Standard textbook equations for heterogeneous kinetics typically utilize a constant driving force to solve for rates and times of reactions. In order to more closely model real systems, equations and
Jan 1, 2005
-
Geotechnical Design Of Large Openings At DepthBy Evert Hoek
Two types of failure have to be considered in designing large openings: (a) Structurally controlled failure caused by discontinuity intersections, (b) Stress induced instability which occurs whe
Jan 1, 1981
-
What Can WWW Contribute to Mine Management?By Simon J. D. Cox, Nicholas J. Archibald, Steve Nichols, Peter B. Ketelaar, Donelle C. Davies, William L. Power
In the mining industry, there is a critical need to communicate complex, three dimensional information about the geology, ore reserves and development plans for mining operations. This information has
Jan 1, 1996
-
Automated guidance systems for underground machines: Can they benefit my future project?By W. L. Hollinshead
For more effective and cost-saving production in tunnels, the machinery used on construction sites in the future will be equipped with guidance systems combined with working-procedure management syste
Jan 1, 2000
-
Design-Bid-Build Contracting: Climbing Out of a Paradigm SinkholeBy Randall J. Essex
Public and private owners of infrastructure projects face a number of real and perceived constraints when considering design-bid-build (DBB) procurement for underground projects. Thus, they may not be
Jan 1, 2003
-
Expert Systems in Comminution - Case StudiesBy Lynn B. Hales, Randy A. Ynchausti
Expert supervisory control strategies have been used for many years to improve operating revenues in comminution circuits. Typical improvements in capacity range from four to eight percent. Several ca
Jan 1, 1997
-
Specific Problems of Very Large Tunnelling ShieldsBy Lothar Anheuser
The appearance of very large shielded softground TBM's, of 14 m (46 ft) O.D. and more, as needed for two-lane highway tunnels, calls for a thorough search of overall stability and new solutions f
Jan 1, 1995
-
The Rock Properties Improvement and its Simulation by Numerical MethodsBy E. V. Kuzmin
The rock properties improvement means the exchange of natural properties: increase of stability, strain and compress tension, reduction of gas-liquid filtering property, increase Jung- module, other m
Jan 1, 1996
-
Settling equation for minerals and process applicationsBy V. F. Swanson
A mathematical model for free and hindered settling of minerals was developed. This paper describes how to apply the model in designing systems, such as fluidized bed, elutriation, mixing pumping syst
Jan 1, 2000
-
Reaction Kinetics For Gold Dissolution In Acid Thiourea Solution Using Formamidine Disulfide As OxidantBy J. D. Miller
Reaction kinetics for gold dissolution in acid thiourea solutions were investigated using formamidine disulfide as an oxidant. For the conditions studied it appears that a surface reaction limits the
Jan 1, 1999
-
Development of hydrologic risk-based methodology for evaluation of dam safety in MissouriBy B. J. Swenty, J. L. Hubbard, R. L. Peyton
Based on the results of the National Program of Inspection of Nonfederal Dams conducted by the US Army Corps of Engineers during 1977-1981, Missouri was found to have the highest number of "unsafe" da
Jan 1, 1987
-
Effect Of Application Frequency of Asphaltic Gear Spray Lubricant On PerformanceBy H. Benedict
For many years, asphaltic lubricants have been used on large open gears. The asphaltic's diluent is essential to thin the lubricant enough to be sprayed. Once the lubricant has been sprayed int
Jan 1, 2003
-
The Sizing Of Grinding Ball MillsBy A. R. Zambrano
Equations for Power Draw, Capacity, and Work Input for predicting the performance of industrial grinding mills are derived based on torque measurements obtained in a laboratory instrumented mill. Thes
Jan 1, 2001
-
New Technology For Mineral Flotation Based On Pulp-Air Down-Flow ApparatusBy S. B. Leonov, K. I. Popov, S. B. Polonsky
The offered technological line includes a flotation pulp air conditioner operating on the impact-mechanical effect and two column apparatuses with a descending pulp-air flow mounted in series. The tec
Jan 1, 1995
-
Quantifying The Recovery Of Beneficiated Products From Pneumatic, Triboelectrostatic ProcessingBy J. K. Neathery, T. X. Li, H. Ban, J. L. Schaefer, J. M. Stencel, X. K. Jiang
Pneumatic, triboelectrostatic processing of physical mixtures containing fine (-200 mesh) particulate may have significant application potential in the mining and energy industries. Such dry processin
Jan 1, 1999
-
Advances in Mill-Lining Technology (SME Annual Meeting, Feb. 14-17, 1994)By R. Svensson
Mill linings play an important role in all comminution processes with tumbling mills. The selection of the lining profile and the lining material has a great impact on overall grinding cost and mill t
Jan 1, 1995
-
Phelps Dodge Chino Smelter Effluent Metal RecoveryBy E. H. Partelpoeg, B. G. Belew
In 1990, the Chino Smelter completed the construction of a plant designed to recover metal values and water from smelter scrubber effluent. Equipment was installed to maximize effluent recycling and m
Jan 1, 1992
-
Construction Of Section E-ld Greenbelt Route Tunnels, Washington, DCBy Charles E. Mergentime, J. Marshall Dean
Mergentime/Loram's extension of the Washington, DC Metro Subway System includes construction of dual 1,770-foot tunnels in soft ground, a crossover structure, a fan structure and pumping station,
Jan 1, 1985