Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble DepositsBy Marco Fellin, Van E. Komurka
Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.
Jan 1, 2019
-
The World's Longest Directional Impact Driven PileBy Robert F. Stevens, Robin Givet, Kenneth Viking
"Summary This paper describes a case of a directional pile installation conducted from an existing oil platform in the Caspian Sea, offshore Baku. Results are presented for 660 mm outer diameter (660
Jan 1, 2014
-
Evaluation of Existing T-Z Models for Caliche Based on Numerical Analysis of Bi-Directional Load Tests Using NVShaftBy Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan, Joseph Toth
The difficulty in material characterization and the erratic response of cemented soil layers, such as caliche in the Las Vegas valley, creates challenges for practicing engineers to reliably predict t
Sep 8, 2021
-
Large Diameter Shafts - Youghiogheny Reservoir Bridge (bd308ba5-80e5-464e-8005-1856048b892f)By Paul J. Lewis
Estimation of the axial side shear resistance of drilled shaft rock sockets is directly related to the unconfined compressive strength of the bedrock. Commonly, the mean unconfined compressive strengt
Jan 1, 2013
-
Back Analysis of Field Instrumentation Results during Reclamation & Ground Improvement Works- A Case StudyBy Prasanta Paul, Aminul Islam
"Nhava Sheva (India) Gateway Terminal Private Limited proposed to construct a container terminal yard, comprising a back-up area at Jawaharlal Nehru Port Terminal (JNPT), Uran, Maharashtra. The propos
Jan 1, 2015
-
Extra Deep Cut-Off at 250 m Depth - A Case StudyBy Federico Pagliacci
"Many existing dams are subject to underwater seepage due to subsoil conditions, like deep alluvial deposits or pervious rocks or karst. Remedial works are necessary in order to install new cut-off wa
Jan 1, 2017
-
Broadway Viaduct Design Phase Load Test Program For Post Grouted ShaftsBy Mike Muchard
A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc
Jan 1, 2009
-
Introducing VCE's: Support Of Excavation Without Tie-BacksBy Rick Deschamps
A reoccurring problem with support of excavations in urban areas involves the placement of external support components like anchors or nails in right-a-ways, subway and utility setbacks, in areas occu
Jan 1, 2008
-
Standard Testing Method for Deflection Characteristics of Pile Driving Cushion MaterialBy David M. Rempe
The purpose of this standard is to provide a method for testing of cushion materials that leads to uniform results when employed by various organizations and laboratories. The load-deflection charact
Dec 1, 1984
-
Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging ProjectBy José Carlos do Amaral, Marcelo Groszownik, Jorge Beim
"Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the
Jan 1, 2015
-
King?s Cross Station Re-Development Passive And Active Mitigation Of Tunnelling - Induced SettlementBy Clif Kettle
The paper will detail the design and execution of passive and active settlement control measures, the means adopted to overcome the various physical and operational constraints, and to meet specified
Jan 1, 2008
-
Case Studies Of Driven Tubular Steel Piles In Soils And Basalt On Woolgoolga To Ballina Pacific Highway UpgradeBy Henry Zhang
This paper presents two case studies of large diameter driven tubular steel piles for the ongoing Woolgoolga to Ballina Pacific Highway upgrade (W2B). This project forms part of Australia’s largest re
Nov 1, 2022
-
Foundation Stabilization of the Morris Island Lighthouse"The Morris Island Lighthouse (MIL) is located between the jetties leading to the Charleston Harbor and Folly Beach, S.C. The present structure is the third lighthouse to occupy this location. The fir
Jan 1, 2017
-
The Progress Of Jet Grouting In The Last 10 Years In Japanese MarketBy H. Yoshida
Jet grouting was first introduced in Japan in the second half of the 1960s, approaching 50 years ago. By the end of the first 40 years, jet grouting from single to triple fluid systems had become a g
Jan 1, 2010
-
Mooring Bridge Caissons During Construction Using Jetted-In Driven Plate AnchorsBy Osama A. Safaqah
Driven plate anchors can be used to hold in place large bridge caissons during floating construction. Their small size and simple method of installation make them a very cost effective alternative to
Jan 1, 2013
-
Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in LondonBy Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow
"Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of
Jan 1, 2005
-
Excessive Pile Breakage, Gaylord National Resort And Conference Center, A Look Back 15 Years LaterBy Karl A. Higgins
In August 2004, the long-awaited National Harbor project in the DC metro area sprang to life with the design of Gaylord National Resort and Convention Center. When the project was in its final stages
-
Caisson Foundations For Mississippi River Bridges In The New Orleans Area (2e66a216-6dc8-4479-804e-25f5836f407e)By William B. Conway
This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du
May 11, 2007
-
Hybrid Shoring System for a Deep Temporary ExcavationBy Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid Deep Mixing (DM) shoring system was recently constructed for a high-rise development in downtown Vancouver, British Columbia, Canada for the temporary support of a five-level basement excava
Jan 1, 2017
-
Case Histories of Arch Action Low Improvement Ratio Cement Column Method (ALiCC Method)By Jun Ohbayashi, Yoshiyuki Yagiura, Hiroaki Miyatake, Masuo Kondoh, Naotoshi Shinkawa
"Reducing the improvement ratio of ground improvement is an extremely efficient way to reduce the construction cost and construction period of mitigation measures for soft ground. The Arch Action Low
Jan 1, 2015