Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    A Study On Performance Of Piles Based On Methods Of Installation

    By Babu K. V., Samyukta P.

    The energy demand in India is expected to show increasing growth in the next few decades. The oil companies in India are revamping the existing oil refineries as well as constructing new refineries ac

    Sep 1, 2022

  • DFI
    Remediation Of Rail Structures Impacted By Landslides Using Sleeved Bored Piles

    By Paul Hewitt, Aaron Rastall

    The New South Wales South Coast rail corridor is key infrastructure for both freight and passenger transport. Geomorphological and geological evidence suggests that land instability has been widesprea

    Nov 1, 2022

  • DFI
    New Findings on the Capacity of Connections between Micropiles and Existing Footings

    By João Veludo, Eduardo Júlio, Helen D. Robinson, Jesús E. Gómez

    "Utilization of micropiles for structural retrofit requires connection of the micropiles to the footings of the existing structure. Almost ten years ago, an experimental research effort was carried ou

    Jan 1, 2015

  • DFI
    Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way Limits

    By Thomas D. Humbert, Christopher J. Ramsey

    Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi

    Jan 1, 2019

  • DFI
    Settlement Evaluation of Large Water Storage Tanks Under Challenging Conditions

    By Ben M. Lewis, Yogesh Prashar

    "The East Bay Municipal Utility District (EBMUD) is a major water utility service providing water to over 1.3 million people in the eastern San Francisco Bay Area. EBMUD manages 28 dams at 5 terminal

    Jan 1, 2016

  • DFI
    Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit Limestone

    By Jim Glider, Noah Miner

    The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio

    Sep 8, 2021

  • DFI
    Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity Profiling

    By Garland Likins, Gray Mullins, George Piscsalko

    "Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or

    Jan 1, 2016

  • DFI
    The Design of Partial Depth Cement Deep Mixing (CDM) Foundation for an Immersed Tunnel

    By J. S. Lee, R. K. Massarsch

    "A 3.2 km long immersed road tunnel forms part of the Busan-Geoje Fixed Link in South Korea, which connects Korea's second largest city Busan, with the island of Geoje. To ensure the water tightness o

    Jan 1, 2015

  • DFI
    Experimental Studies On Behaviour Of Single Pile Under Combined Uplift And Lateral Loads

    By K. Madhusudan Reddy

    Pile response under combined uplift and lateral load is very important and it is imperative to evaluate the effect of combined loading and only few studies were reported on pile behavior under combine

  • DFI
    Outline and Application Example of Deep Mixing Meeting High Quality and High Efficiency-Execution

    By Hidekatsu Takeuchi, Masaru Sakakibara, Shigeo Tanabe, Kenji Harada, Akihiko Suzuki, Shoji Morihana

    "Deep mixing (DM) method, one of the most commonly used solidification methods, is based on the principle of solidifying soft ground. It can be classified into two categories such as Cement Deep Mixin

    Jan 1, 2015

  • DFI
    Errata - Performance Of A Large Diameter Drilled Pier

    By A. J. Partos

    Table 4, Page 311 Table 4 Experimental Parameters from Straight Line Interpretation of Mohr Failure Envelope [ ]

    Jan 1, 1991

  • DFI
    Kosciuszko Bridge Main Pylon Deep Foundation Solution

    By A. Daugiala, D. Coleman

    In 2014 the New York State Department of Transportation (NYSDOT) awarded a Design-Build contract to the joint venture team consisting of Skanska which is the managing partner; Kiewit Corporation and E

    Jan 1, 2016

  • DFI
    Innovative Use of an Active Soil Nail Wall in Lieu of Pit Underpinning for a Historic Building

    By Tai Luu, Maxim C. Schisler, Yaser Taheri

    The Stevens Gateway Project is an expansion of the Stevens Institute campus overlooking the Hudson River in Hoboken, NJ. The plans call for 90,000 ft2 (8360 m2) of new classroom, research, and student

    Jan 1, 2019

  • DFI
    The Use of Rigid Inclusions to Support Large Spans

    By Michael Shedlosky, Sonia Sorabella Swift, Nina Carney, David Tarasovic

    Rigid inclusions were used to support roadway fills and mechanically stabilized earth (MSE) walls for the South Capitol Street Corridor project. The first phase of this two-phase, nearly $1 billion pr

    Jan 1, 2019

  • DFI
    Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme Variability

    By Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp

    "The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th

    Jan 1, 2015

  • DFI
    Author index

    Abouleid,A.F.327 Ajdic, I.451 Albert, L.F. 221,307 Alem, A. 525 Asama, T. 431 Avgherinos, P. J. 373 Baker Jr, C.N. 331 Balossi Restelli, A. 171 Beckwith,G.H.33 Bellini, A. 469 Ber

    Jan 1, 1994

  • DFI
    Drawdown of Ground Water Control System in Deep Excavation Surrounded by Cutoff Walls: Numerical Investigation

    By Dalia. R. Mohamed, Hisham H. Hafez, Marawan M. Shahien

    "Construction activities in major projects that involve deep excavations necessitate the use of vertical walls surrounding the construction site to play an important role as earth retention system. Th

    Jan 1, 2016

  • DFI
    Trench Cutter - The Multi Purpose Solution

    By Alexander Blatt, Franz-Werner Gerressen

    Power Point Presetation at DFI 2022

    Sep 1, 2022

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Selecting the Right Shoring System – San Francisco Experience

    By Heinrich Majewski, Rob Jameson

    "Careful review of site conditions and constraints is essential to select the appropriate shoring system for each project. Key evaluation criteria include the geotechnical profile, groundwater and env

    Jan 1, 2017