Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case StudyBy Carl-Oscar Nilsson, Åke B. Nilsson
"The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the
Jan 1, 2016
-
Construction of Jacking Pits in Boston’s Central Artery/Tunnel ProjectBy Arturo Ressi di Cervia
"The Construction of the Thrust Pits for Jacking of the I-90 Tunnel for the Central Artery/Tunnel Project (Part of Contract No. C09A4) in Boston MA was nominated for DFI’s 2002 Outstanding Project Awa
Jan 3, 2003
-
Effect of Axial Compression on Lateral Pile Response: Laterally Loaded Test Pile ComparisonBy David S. Graham, Joseph D. Bailey, Paul J. Axtell, Michael K. Muchard
"Two instrumented test piles were simultaneously subjected to a static lateral load test by jacking the piles apart. One of the piles was loaded in axial compression via kentledge during the lateral l
Jan 1, 2017
-
Tomographic Dst Algorithm For Stone Column Site Imaging And CharacterizationBy Gerald Verbeek, Erick Baziw
Stone columns are used in geotechnical site remediation to increase load-bearing capacity and reduce settlement of foundations. Stone columns also improve slope stability and increase the shear streng
-
Bluestone Dam Safety Assurance Program: An OPA Runner UpBy Jeff Hopple
"Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en
Jan 1, 2014
-
4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. IntroductionBy B. De Paoli
At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e
Jan 1, 1994
-
The Little Lake Harris Bridge Settlement Restoration Project: Lessons LearnedBy Amr Sallam, David Thompson, Moataz Hassan
"The Little Lake Harris (LLH) Bridge was constructed in 1951 to replace the eastwest County Road 48 Bridge connecting the towns of Howey-in-the-Hills and Astatula in Lake County, Florida, United State
Jan 1, 2015
-
Design Build & Failure: Perils at a High Risk Shoring and Retaining Wall Project.By Mark Spence, Tom Lardner, Matthew Janes
"IntroductionThe design-build method streamlines project delivery through a single contract between the Contract manager and the design-build team. The design-build method places emphasis on collabora
Jan 1, 2015
-
Long-Term Performance of a Deep Mixed Column-Wall at Arabianranta Area (Helsinki, Finland)By Leena Korkiala-Tanttu, Ilkka Vähäaho, Juha Forsman, Paavo Lahdenperä, Kalle Rantala, Osmo Korhonen
"District of Arabianranta (Helsinki, Finland) has been founded on an old seabed, which was filled with miscellaneous soil materials. The subsoil consists of very low shear strength clays and organic c
Jan 1, 2015
-
Session 19 "Compensation Grouting"By Douglas Heenan
The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time
Feb 10, 2003
-
Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)By Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2008
-
Keynote Lecture 5: Giovanni Lombardi Grouting of Rock MassesBy Giovanni Lombardi
In order to get a clear overview of the grouting works carried out, to avoid misinterpretations of the data and functions shown on the display of the grout monitoring device, it is recommended to keep
Feb 10, 2003
-
Deep Foundations for the Bangkok MRT Chaloem Ratchamongkhon Line Metro ProjectBy Peter A. Thompson, Richard E. Prust
"The Bangkok Mass Rapid Transit (MRT} Chaleom Ratchamongkhon Line project is the first underground subway to be completed in Thailand. It consists of 22 km (14 miles) of twin-bored tunnels and 18 cut
Jan 1, 2005
-
Ultimate Lateral Load of a Pile in Cohesive Soil under Static LoadingBy Dileej M. Dewaikar, Poonam A. Patil
"In this paper, the ultimate lateral resistance of a long, flexible, unrestrained vertical pile in a cohesive soil is computed under static loading condition using py curves. A simple and improved met
Jan 1, 2005
-
Estimation Of Maximum Unit Side Resistance In Drilled Shaft Foundations From Partially Mobilized Load-displacement DataBy Ramin Motamed, Anna Panorska``, Joseph A. W. Toth
In this study, a dataset of 145 bi-directional and static load tests was used to evaluate the load-displacement response with respect to unit side resistance for drilled shafts comprising fully and pa
-
New Wembley National Soccer Stadium, London Piled Foundations: Design, Construction and LogisticsBy Max Gwynn, Tony Suckling
"The new Wembley Stadium is the most spectacular soccer stadium in the world, built to the highest specifications, using the latest technology and offering visitors an unrivalled match-day experience.
Jan 1, 2008
-
Theoretical Ultimate Lateral Resistance near the Soil Surface in Unsaturated Cohesionless SoilsBy Oladayo O. Komolafe and Majid Ghayoomi
p-y curves have been used over the years to determine the lateral resistance of piles. This method is popular among practicing engineers due to its simplicity and its ability to determine the slope,
Sep 8, 2021
-
Geophysical Methods for Site Characterization for Marine Foundations (2dc87bb8-7bfd-4523-92cd-c3dfe612556c)By Richard E. Sylwester
Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is prim
May 11, 2007
-
The Geo-Impuls Programme: Towards Reducing Geotechnical Failure in the NetherlandsBy Paul M. C. B. M. Cools, Martin Th. van Staveren
In 2010, the 5-years joint industry programme Geo-Impuls started in the Netherlands. The ambitious goal of this programme is to reduce geotechnical failures in our civil engineering projects by half i
Jan 1, 2017
-
Development Of Vertical-Horizontal Yield Envelopes Of Pile Group Supported Bridges Subjected To ScourBy Aditi Sharma, Sumanta Haldar
Scouring of soil is the major concern forthe various hydraulic structures built in the flowing rivers since scouring impacts the bearing capacity of foundations. Hence, consideration of scouring in th
Sep 1, 2022