Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Experimental and Numerical Modelling of Thermal Stimulation in Geothermal Core Studies

    By M. C. Villeneuve, P. A. Siratovich

    We present an integrated analysis of laboratory-based thermally induced fracturing and results of numerical models to give insight to the role of thermal shock fracture on geothermal reservoir rocks.

    Jan 1, 2015

  • CIM
    A method of extending wire rope service life

    By S. Wood

    "Plastic Filled Valley (PFV) wire rope represents a significant development over the design of conventional wire rope. A sealing thermoplastic is impregnated under controlled conditions of temperature

    Jan 1, 1982

  • CIM
    The Gap Nickel Mine, Lancaster County, Pennsylvania and the American Nickel Works, Camden, New Jersey -- 1860 - 1890

    By D. Chadwick, J. W. Matousek

    Between 1860 and 1890 -- from the time of the American Civil War to the last decade of the 19th Century -- nickel production in North America was dominated (even monopolized) by the output of the indu

    Jan 1, 2005

  • CIM
    Pioneers in Hydrometallurgy

    By F. Habashi

    "Extractive metallurgy was divided into the three sectors pyro-, hydro-, and electrometallurgy in 1959 when Professor Joseph Newton at the Idaho School of Mines in Moscow mentioned this in his book Ex

    Jan 1, 2016

  • CIM
    The S02 abatement project

    By P. Garritsen, J .. A. Blanco, M. C. Bell

    "By 1994, Inco Limited will lower sulphur dioxide emissions from the Copper Cliffsmelter by 60% to 265 000 tonnes/year, primarily through implementing two key process changes. First, new milling techn

    Jan 1, 1990

  • CIM
    Pyrometallurgical processing of Stillwater concentrates

    By J. G. Whellock, R. J. Phillips, J. W. Matousek, P. J. Marcantonio

    "Stillwater Mining Company (SMC), a partnership of Chevron Resources and Manville Corporation, produces a copper-nickel, platinum-palladium flotation concentrate at its Nye, Montana mine. The concentr

    Jan 1, 1989

  • CIM
    Coal liquefaction via Sasol Fischer-Tropsch synthesis

    By M. M. Papic

    "This paper describes the Sasol coal liquefaction process, as used in South Africa. It covers coal supply, coal gasification, gas purification, Fischer-Tropsch synthesis, the major utility systems inv

    Jan 1, 1981

  • CIM
    Undergronnd ore handling and hoisting system at the Williams Mine

    By Henry Smith, Stu Brown

    "The Williams Mine is Canada's largest gold producer, with annual production of some 500 000 ounces of gold from two million tonnes of ore. Highly mechanized and automated underground mining prac

    Jan 1, 1991

  • CIM
    Some operating concerns in carbonate leaching

    The paper will cover the basic reasons for alkaline leaching, a brief description of the circuit and the reasons for the flowsheet used. Changes made to the flowsheet, including the use of mechanical

    Jan 1, 1979

  • CIM
    Continuous casting of steel

    By F. Weinberg

    "The recent development of the continuous casting process for steel has required basic understanding in a number of areas in the metallurgcal sciences. In some areas, information is still lacking. The

    Jan 1, 1981

  • CIM
    Diffusion Bonding Superalloys Using Liquid Gallium

    By A. A. Shirzadi, E. R. Wallach

    "Liquid gallium has been used successfully to modify/remove the surface oxides prior to diffusion bonding similar and dissimilar nickel-base superalloys. Using this approach, bonds in nickel-base supe

    Jan 1, 2006

  • CIM
    Formation of Nanocrystalline and Ultrafine-Grained Structures in Disk-Shaped Samples of Fe-0.15c and Interstitial-Free (If) Steels Produced by Ball Milling

    By A. Dolatmoradi

    Nanocrystalline structure formations produced by severe plastic deformation in Fe-0.15C with initial ferritic-pearlitic and IF steel with ferritic microstructures have been studied through microstruct

    Jan 1, 2010

  • CIM
    Continuous Casting of Az31 Magnesium Plate via Horizontal Continuous Casting Process

    By Bong Sun You

    AZ31 magnesium plate of 300mm in width and 40mm in thickness was produced by horizontal continuous casting machine, and its microstructures were analyzed on the surface and in the plate interior. The

    Jan 1, 2006

  • CIM
    Recycling 'Scrap' Alumina at Alcan Arvida Works - Canada

    By H. Vermette, J. Demers, R. Leclerc, P. Bergeron, P. Hudon, A. Lessard

    The Arvida Smelter marked its 80th anniversary in 2006. Arvida currently operates 6 potrooms equipped with prebaked side-feeding pots producing 160 000t of aluminum per year, requiring the supply of 3

    Jan 1, 2006

  • CIM
    Design Guidelines for Permanent Tunnel Plugs

    By Brennan Lang

    Why Seal Tunnels? ?Restore groundwater levels to pre-mining conditions. ?Saturate rock mass to reduce acid rock drainage. ?Reduce discharge flow to the environment. ?Reduce or regulate flows to a

    May 1, 2002

  • CIM
    Reducing Risk in the Resource Estimation Process: The Role of Structural Geology

    By Blair Hrabi

    Introduction; ?Risks Associated with the Resource Estimation Process; ?Limitations of Available Data; ?Geological and Structural Control of Mineralization Trends; ?Recognizing Multiple Mineral

    May 1, 2013

  • CIM
    Equilibrium Analysis for Solvent Extraction of Neodymium and Dysprosium with 2-Ethylhexylphosphonic Acid Mono-2-Ethylhexyl Ester

    By M. Tanaka, Y. Sato, H. Narita, S. Alam, T. Ogata

    To ensure a stable supply of rare earth elements (REEs), it is highly necessary to establish the corresponding recycling technologies for RE magnets and phosphors in inplant wastes and endoflife produ

    Jan 1, 2014

  • CIM
    Arntfield Mine

    By E. A. Hart, J. E. Gill

    "The property of Arntfield Mining Corporation, formerly Arntfield Gold Mines, Limited, covers an area of 2,110 acres and lies in Beauchastel township, western Quebec. The Francoeur mine lies to the we

    Jan 1, 1954

  • CIM
    Impact of superheat on the microstructural evolution of 356 alloy in SEED Slurry-on-Demand process

    By O. Lashkari

    Swirled Enthalpy Equilibration Device (SEED) is a new patented Slurry-on-Demand, SoD, processing route. The semi-solid slug preparation is carried out by off-center swirling of aluminum melt in a meta

    Jan 1, 2004

  • CIM
    Reducing Ferric Ions in Acidic Electrolytes by Copper Powder Generated During Reactive Electro-Dialysis

    By J. Ipinza, J. P. Ibáñez, Casas J., S. Cortés

    Copper powder generated during the treatment of electro-metallurgical bleeds by reactive electro- dialysis (RED) had totally reduced the content of ferric ions in acidic synthetic electrolytes (Cu (II

    Jan 1, 2019