Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    New triangular raise cribbing technique for rockburst prone backfilled stopes

    By J. H. Archibald

    "In mines employing cut-and-fill stoping (sand fill), ore passes are built as mining progresses upward. These ore pass raises are generally made from timber and form a vertical ""chimney"", like a ver

    Jan 1, 1991

  • CIM
    Mine Timber: Its Conservation, Preparation, Storage, and Treatment

    By W. D. Haley

    The report of the Forestry Committee, presented to the recent Imperial Conference at London, is discouraging in its view of the future of timber resources and supplies. From a review of the forestry s

    Jan 1, 1927

  • CIM
    Gainshaling incentive plans and mining: An introduction

    By Dougla McDonald, Richard Poulin

    "Most mine managers in Canada today will agree that one of the keys to mining efficiency and productivity is their human resources. A5 a result, many mines develop some sort of incentive designed to t

    Jan 1, 1995

  • CIM
    Operating Culture Impact on APC Application Design: Approaches and Case Study

    By A. B. Morrow

    Consulting engineers are well aware of large variations in plant operating cultures between countries, companies, and even within sites and operating crews. These operating cultures must be considered

    Jan 1, 2014

  • CIM
    Fluxed pellet production at Minntac: an overview

    By Raymond D. Potts

    "Minntac is a taconite mining, concentrating and pelletizing operation located near the town of Mountain Iron, Minnesota, U.S.A. It is totally owned and operated by USX Corporation and represents its

    Jan 1, 1991

  • CIM
    Stepping Stone Toward Sustainable Development: Improving Environmental Assessment of Mineral Aggregate Resources

    By Heather Budney

    Objectives 1. Evaluate the effectiveness of ON?s EA processes using criteria from the EA and policy sciences literature. 2. Recommend improvements to the EA processes and draw lessons from the ON ca

    May 1, 2008

  • CIM
    Reduction of Silver Loss in Copper Cathode

    By Nitin Bhavsar, Kaushik Vakil, Lakshmikanth Reddy, Sanjay Sarkar, Tathavadkar. Vilas, Bhavin Desai, Raghavendra Adiga

    Gold and platinum group metals (PGM) do not dissolve in sulfate electrolyte from anode during electro-refining of primary copper. The PGM form solid ‘slimes’ which accumulates at bottom of the electro

    Jan 1, 2019

  • CIM
    Real-Time Mass Balance Calculation for a Pilot Grinding Circuit

    By R. Lanthier, A. Broussaud, J. C. Guillaneau, D. Hodouin

    This study presents a method for upgrading the information extracted from the measurements given by the sensors of a pilot grinding circuit. For that purpose raw signals are combined to process models

    Jan 1, 1989

  • CIM
    An Unusally High Thermal Efficiency Power Plant for the Cantung Mine

    By C S. Walker

    This paper analyzes the physical, operational and economic site conditions which were conducive to the design of a diesel-electric power plant wherein the over-all use of the thermal energy of the fue

    Jan 1, 1965

  • CIM
    Considerations for Technology Introduction Under the Explosive Free Rock Breakage Explosive-Consortium

    By Bétournay. M. C.

    Advantages ?Safety ?Health ?Rapid, continuous development, productivity ?Stope dilution reduction Disadvantages ?High cost and long time for equipment development ?Hard rock mining condition l

    May 1, 2009

  • CIM
    The Lonmin Platinum Base Metal Refinery Operations and Continual Improvements 1985 To 2012

    By M. Turner-Jones, N. Steenekamp

    "The Lonmin Base Metal Refinery treats converter matte from the Lonmin Smelter to produce nickel sulphate crystals, copper cathode as well as a concentrate containing the platinum group (PGM) metals.

    Jan 1, 2012

  • CIM
    Slag Reduction and Settling for Improved Metal Recovery

    By R. Dawes, B. R. Davis, T. LeBel, C. Pelow

    Settling of copper, lead, and other metals in slags is an important part of overall recovery of metals, both in primary and secondary operations. The impact of slag reduction on settling is not well k

    Jan 1, 2019

  • CIM
    Mineralogical and Wallrock Alteration at the Jinqingding Gold Deposit in Jiaodong Peninsula, China (6478e8f0-1dcd-46fc-a187-446b60449d56)

    By Jiuhua Xu, Shuiku Jia, Weiren Sun

    "The Jinqingding gold deposit, situated in the east Jiaodong Peninsula of Shandong province, is typical of the pyrite-quartz vein gold deposits in the Muping-Rushan gold belt of China. The gold deposi

    Jan 1, 1994

  • CIM
    Company-Community Agreements, Gender and Development

    By J. C. Keenan

    Company-community agreements are widely considered to be a practical mechanism for recognising the rights, needs and priorities of peoples impacted by mining, for managing impacts and ensuring that mi

    Aug 1, 2013

  • CIM
    Coal screening

    By A. D. Walters

    "IntroductionScreens are used in coal preparation plants for four basic functions, namely:I. Scalping off large size run-of-mine coal for initial size reduction;2. Sizing of coal treatment in differen

    Jan 1, 1989

  • CIM
    Managing change and implementing total quality in the mining industry

    By John Campbell, William Trahant

    "Total Quality Management (TQM) is becoming a reality in the mining industry. Widely adopted in the manufacturing and services industries, TQM has become the operating style of choice in numerous mini

    Jan 1, 1995

  • CIM
    On-Line Gas and Solids Holdup Estimation in Solid-Liquid-Gas Systems

    By S. Banisi, J. A. Finch, A. R. Laplante

    "A technique for on-line simultaneous estimation of gas and solids holdup (volume fraction), based on a combination of conductivity and pressure difference measurements, is proposed and tested in a la

    Jan 1, 1994

  • CIM
    Radium-226 removal by precipitation and sedimentation in settling ponds

    By J. N. Hilton, D. Moffett, E. Barnes

    "A recent pilot-plant program carried out at Rio Algom's Quirke uranium mine at Elliot Lake, Ontario is described. The goal of the research was the production of tailings basin effluents which we

    Jan 1, 1981

  • CIM
    Cape Breton Development Corporation: An overview

    By J. Kochhar, Robert G. Cooper

    "The Cape Breton Development Corporation is a federal Crown corporation which was formed in 1968. Initially, the Corporation had two divisions - the Industrial Development Division, whose purpose was

    Jan 1, 1990

  • CIM
    Deep Air-Flotation at Britannia

    By Norman A. M Macleod

    FOR the past seven years, all flotation at the Britannia mill has been done in Forrester Air-Lift cells. Prior to 1931, the roughing and part of the cleaning operation had been performed in four 21-ce

    Jan 1, 1938