Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evaluation of Groundwater Leakage into a Dam Foundation Drainage Tunnel

    By J. M. Hong, H. K. Zheng, R. Hu, C. B. Zhou

    The Jinping-I double curvature arch dam, located in the middle reach of the Yalong River and with a maximum height of 305 m, is the world highest dam of the same type that has been completed. Since th

    Jan 1, 2015

  • CIM
    Planning and Scheduling of Maintenance Work at the Milliken Mine

    By K B. Bowley

    This paper covers the application of a systematic maintenance plan by the Plant Engineering Department of Rio Algom Mines Limited, Milliken Division. The plan established the function of work study, d

    Jan 1, 1963

  • CIM
    Testing and Implementation of a Fatigue Monitor System for Haul Truck Operators

    By Mark W. Bartlett

    Program Objectives ??Identify and implement a tool for haul truck drivers that: -Reduces or eliminates fatigue-related injuries and fatalities -Reduces accidents and equipment damage ??Following

    May 1, 2011

  • CIM
    From Open Cast to Block Cave and the Effects on the Autogenous Milling Circuit at Palabora Mining Copper (4c86e50a-2cf3-4106-bb4f-6a8b452c0d68)

    By J. Makgatho, P. Condori, J. Winnett, Fischerm D.

    "Palabora Mining Copper (PMC) has two autogenous mills that have been in operation since 1976. The mills were originally designed to treat 30 000 t/d of open cast copper ore in a closed circuit with c

    Jan 1, 2012

  • CIM
    Experimental Study on Mechanical and Damage Evolution Properties of Sandstone under Triaxial Compression

    By L. J. Han, Y. J. Zong, S. Y. Wen, J. J. Wei

    "Stress strain curves characteristics, deformation and strength properties, and failure process and characteristics of sandstone samples under different stress states were analyzed through triaxial co

    Jan 1, 2015

  • CIM
    The Determination of Selection Elements and Lumped Parameters for Grinding Mills

    By A. L. Mular

    This paper provides a worthwhile contribution to the knowledge needed for calculating and using mathematical models of grinding circuits. The computer search algorithm proposed should remove much of t

    Jan 1, 1970

  • CIM
    Mechanical Properties of Degradable Magnesium Implants in Dependence of the Implantation Duration

    By Chr. Krause

    Within the scope the collaborative research centre 599 (Medical University of Hanover, University of Veterinary Medicine Hanover, University of Hanover) the behaviour of the degradation of magnesium m

    Jan 1, 2006

  • CIM
    Agnico Eagle LaRonde plant: Metallurgical challenges present and future

    By J. Cayouette, C. Bolduc, P. Blatter

    "The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext

    Jan 1, 2017

  • CIM
    Lamaque Mine

    By H. S. Wilson

    "The property owned by the Lamaque Mining Company comprises a group of forty-four claims and fractions occupying an area of about 2,458 acres, in west-central Bourlamaque township, Abitibi county, Que

    Jan 1, 1954

  • CIM
    Development (Optimezation) of the Detour Lake Concentrator Flowsheet: Integration of the Results of Comminution and the Metallurgical Testwork Program

    By A. Allaire, J. Torrealba-Vargas, R. Welyhorsky

    Early testwork was carried out to select the plant process design criteria and flowsheet selection. Additional testwork was carried out during the feasibility study to support the optimization of the

    Jan 1, 2011

  • CIM
    Materials for Design and Construction of Hydrometallurgical Equipment

    By K. Lambrych

    Hydrometallurgical equipment used to extract and refine copper and other metals is exposed to extremely corrosive chemical environments. These systems must be fabricated from materials that are durabl

    Jan 1, 2019

  • CIM
    Geochemical Performance of Mine Rock beneath an Elemental Sulfur Stockpile and Implications for Water Quality Management Following Removal of the Stockpile

    By S. Litke

    Elemental sulfur was stockpiled at the Mount Polley Mine for use as a source of sulfuric acid as part of research into leaching copper from oxide ores, but the project did not proceed beyond an initia

    Jan 1, 2019

  • CIM
    Toward the Optimization of Flotation Column Operation (9284e55e-ecc3-4510-af19-44c99925dde0)

    By J. Bouchard, A. Desbiens, M. Maldonado, R. del Villar

    ABSTRACT: Despite many years of practical applications in mineral processing plants, the potential of column flotation has still not been fully exploited. The challenge in measuring some key variables

    Jan 1, 2011

  • CIM
    New Development in Liner Design for Large Autogenous Mills (e956eb23-d616-474d-9dc9-d4512f8d61a8)

    By L. Furtenbach, T. Möller

    "Grinding mills are the heart of the mineral processing plant, and are production-critical machines which are required to achieve high availability. Liner wear life and a liner design that promotes ea

    Jan 1, 2012

  • CIM
    CFD-DEM Modelling of Matte Droplet Behaviour in a Flash Smelting Settler

    By J. P. Jylhä, A. Jokilaakso

    The Outotec Flash Smelting process is widely used in primary copper production. A layer of slag on top of matte (copper–iron sulphide melt) creates a barrier through which matte droplets descend. Drop

    Jan 1, 2019

  • CIM
    Grain Refining Aluminium Alloys by the Same-Alloy Rod

    By D. G. Eskin

    "It is well known that it takes some time for the solid phase to completely dissolve upon melting, especially inside the defects of insoluble particles, e.g. oxides. Until then the oxides remain activ

    Jan 1, 2018

  • CIM
    Evidence for a Feeder Pipe and Associated Alteration at the Brunswick No. 12 Massive-Sulfide Deposit

    By Wayne D. Goodfellow, William M. Luff, Steven J. Juras

    Abstract-Brunswick No. 12 is a vent-proximal massive sulfide deposit that formed above a feeder pipe with associated hydrothermal alteration. Because of the replacement of bedded sulfides deposited ab

    Jan 1, 1992

  • CIM
    Autogenous and Semiautogenous Mills 2010 Update (c8ce50b9-7ed1-4029-b5bf-b13ac92a9d7b)

    By Jr. Jones

    This paper is derived from a document that compiles autogenous and semi-autogenous mill installations worldwide, through the end of 2010. Updates have been solicited from all major mill manufacturers

    Jan 1, 2012

  • CIM
    Factors influencing the selection of mine hoist electrical drives

    By B. C. Legg, G. L. Tiley

    "Many of the ore bodies presently being developed are in remote locations and are, or will be, served by electrical power supply systems of limited capacity.The largest single components of the electr

    Jan 1, 1993

  • CIM
    Bituminous Sands of Northern Alberta

    By S. C. Ellis

    THE bituminous sand of northern Alberta has already an extensive literature, and most of the reports dealing with the subject are still available (see Selected Bibliography at end of paper). A phenome

    Jan 1, 1937