Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Case Studies on Circuit Design Using Flotation ColumnsBy Glenn S. Dobby, Glenn A. Kosick
"Column flotation circuit engineering has matured to a good level of understanding regarding testing, scale-up and design. Some of the factors important to the process of implementing columns are addr
Jan 1, 1995
-
A Review of Suncor Energy’s Millennium Extraction ProcessBy Michael Godard, Peter Cleyle
"Suncor Energy’s Project Millennium increased oilsands production capacity by an additional 95,000 barrels per day to its present level of 225,000 barrels per day. This massive venture included an exp
Jan 1, 2004
-
Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, ZimbabweBy Peter Makuvise, Alain M. Bantshi
"The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w
Jan 1, 2017
-
Hardness Model and Reconciliation of Throughput Models to Plant Results at MINERA Escondida LTDA., Chile.By Leonardo Flores
"Minera Escondida operates two open pits on a porphyry copper district, southeast of Antofagasta, Chile. During 2005, ore will be delivered exclusively from one pit to two concentrators, while from 20
Jan 1, 2005
-
Intelligence for Grouting BalanceBy J. A. López-Molina, S. García, V. Castellanos-Pedroza
"Grouting aims to reduce the permeability of rock mass below a predetermined value and has been widely used in rock engineering field for a long time. However, the injection procedure needs several em
Jan 1, 2015
-
Rapid Mine Drifting & Tunneling, A Review of the Current Situation at some Selected Mines and Civil Projects from around the WorldBy Gunnar Nord
Introduction ??Atlas Copco has customers both amongst Miners and Contractors ??We believe that the contractor's approach to tunnelling is worthstudying ??For a tunnel contractor the incenti
May 1, 2009
-
Development of Oxidation Resistant Titanium Alloys by Niobium AdditionBy G. J. Ackland, K. Saksl, F. Brunke, M. Kohnke, B. Tegner, C. Siemers
The application of titanium alloys is limited to 550°C due to their poor oxidation resistance. It is known that the addition of niobium decelerates the oxidation of titanium alloys whereas elements li
Jan 1, 2014
-
Turnagain Nickel Project: Playing a Key Role in the Development of Northwestern BCBy Ed Beswick
Resource Update Drilling Program ? Pre-feasibility ? Exploration Metallurgy Program ? Grindability ? Metallurgical Optimization ? Hydrometallurgical Options Preliminary Mine Development Design
May 1, 2008
-
The New Red Lake Mine: Narrow Vein Mining in Deep, Burst-Prone GroundBy Pierre Rocque
The Red Lake Mine is located approximately 600 km northwest of Thunder Bay. This 545 tpd (600 tons/day) underground narrow vein gold operation is set to produce in excess of 14.8 tonnes (475,000 ounce
Oct 1, 2001
-
Circuit Design and Operational Philosophy Related to Custom Gold Ore Processing at PamourBy R. D. Lindsay
Pamour Porcupine Mines, Limited has been actively engaged in the ''Custom Tolling'' of Gold-Bearing materials throughout the past decade. Experience acquired in this area was utilized to design and co
Jan 1, 1987
-
Treatment of Copper-Gold OresBy E. H. Smith
"The El Indio mine treats a complex mixture of copper and gold/silver ores at its plant located in the high Andes in Chile. The plant utilizes conventional crushing, grinding and flotation to produce
Jan 1, 1991
-
Explore the Future of MiningBy Joe Shoemaker
Automated Spot Generation ? No Operators below the Highwall ? No Operator Wear and Tear ? Reduced Swing Time ? Single and Double Sided Loading ? Minimized Bench Width
Aug 1, 2013
-
Determination of Physical Properties of Cable Bolts in Cement Grout Pull Tests Using Instrumented King WiresBy Lewis Martin
Whereas many researchers and mine engineers have conducted tests using different types of grout, grout ratios, and physical modifications of the cable to determine cable bolt load characteristics, few
May 1, 2002
-
Mapping mining-induced subsidence from space in a hard rock mine: Example of SAR interferometry application at Kiruna mineBy E. Henry, C. Mayer, H. Rott
Hangingwall deformation monitoring at Kiruna mine is a major concern for Luossavaara- Kiirunavaara AB (LKAB) since underground production is deepening toward the town of Kiruna. In the quest for more
Jan 1, 2004
-
Cummins Tier 4 TechnologyBy Evelynn Stirling
Agenda ? Emissions legislation ? Cummins Tier 4 Technology ? Cummins Experience with Technology ? Operation and Maintenance Impact The Emissions Challenge ? The 2014/5 emissions regulations pr
Aug 1, 2013
-
Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree MineBy D Reddy Chinnasane
Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations
Oct 1, 2010
-
Separation and Purification of Rare Earth Metals Using Molecular Recognition TechnologyBy R. L. Bruening, N. E. Izatt, S. R. Izatt
"Rare earth elements (REE) are essential and unique components of many high-technology products without which functioning of modern society would be greatly impaired. Commercial deposits of REE are li
Jan 1, 2012
-
Applied Mineralogy in Industrial and Metallic Mineral Deposits: Examples from Wollastonite, V-magnetite and MuscoviteBy Panagiota Tsolis-Katagas, Basilios Tsikouras, Tassos A. Grammatikopoulos, C. Katagas
"Mineralogical techniques including microscopic methods, reflected and transmitted light microscopy, Cathodoluminescence (CL) and Scanning Electron Microscopy equipped with an Energy Dispersive Spectr
Jan 1, 2003
-
Environmental and Financial Savings for Belt Conveyors by Using Paramid as Reinforcing Material.By Heidi Beers
Teijin Limited ? Global technology-driven group operating in six main fields Advanced fibers and composites business group Healthcare business group Trading and retail business group IT business
Aug 1, 2013
-
Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank MineBy Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby
"Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe
Jan 1, 2017