Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    CSIRO Research for the Iron Ore Industry

    Australia's iron ore industry is entering a challenging period with the development of new orebodies, the introduction of new products and the push for further downstream processing. In additio

    Jan 1, 1999

  • AUSIMM
    Risk and Alternate Dispute Resolution Options for Mining Companies Operating in South East Asia (Including a Case Study)

    By K Broadley

    Risk and dispute resolution are linked. Dispute resolution techniques are brought to bear on a dispute - which is an outcome of a risk being wholly or partially realised. There has been an increasing

    Jan 1, 1999

  • AUSIMM
    Mine Planning and Risk Management Associated with the Breakthrough of the Telfer Sublevel Cave into the Active Telfer Open Pit

    The Telfer main dome open pit is operated by Newcrest Mining Limited at a current production rate of 50 Mt/a from a pit dimension compromising 2 km strike length, 1 km width and 250 m depth. As part o

    May 1, 2010

  • AUSIMM
    Continuous pH and Pulp Potential Measurements During Complex Sulfide Ore Flotation

    Continuous pH and Pulp Potential Measurements During Complex Sulfide Ore Flotation

    Sep 13, 2010

  • AUSIMM
    State Batteries and The Prospector

    The object of this talk is to bring before members the importance of the prospector and the' State Battery system to the wealth and prosperity of the mining industry in particular and the State o

    Jan 1, 1941

  • AUSIMM
    Mining Methods at Iron Knob, South Australia

    In setting out to describe the methods and machinery employed at Iron Knob the writer does not attempt to give any information as to the situation, topography or geological features of the locality. T

    Jan 1, 1936

  • AUSIMM
    Analysing and Rehabilitating Rock Mass Failure in Critical Mine Infrastructure

    To optimise the haulage of the large tonnages produced from stopes in this high production gold mine, an ore pass and feeder system was introduced. This ore pass was designed and developed in 2006 and

    Nov 25, 2010

  • AUSIMM
    The Selenium Content of Some Australian Sulphide Deposits

    By Carlos G. C

    Geological mapping in various parts of Australia is revealing a number of regional associations of mineralizations with particular persistent stratigraphic horizons. Such associations have been found

    Jan 1, 1954

  • AUSIMM
    Simulation of Correlated Assay Variables - A Case Study from the Yandi Channel Iron Deposit

    By C De-Vitry

    "The large Yandi channel iron deposit (CID) is located in the north-west of Western Australia and is currently mined via open pit methods. Drilling at Yandi is widely spaced and current estimates are

    Aug 12, 2013

  • AUSIMM
    Environmental Assessment of Iron Ore Agglomeration Processes

    By K R. Vining, T E. Norgate

    A study was carried out to compare the environmental impacts of the two major iron ore agglomeration processes, sintering and pelletising, using life cycle assessment (LCA) methodology. The following

    Jan 1, 2006

  • AUSIMM
    The Greymouth Coal Project

    The Greymouth Coal Project is a proposal to mine by the application of proven hydraulic, and room and pillar underground mining methods; and to process the equivalent of an average of 1.7 million tonn

    Jan 1, 1997

  • AUSIMM
    Geology of the Southern Finisterre Range: A case history of Modern Arc-Continent Collision

    By Silver EA

    The Finisterre Range on the north coast of Papua New Guinea is the uplifted forearc riagio.n. of a modern arc-continent collision. The core of the range is composed of the P- nisterre Volcanics, a

    Jan 1, 1991

  • AUSIMM
    Underground bulk sampling, uniform conditioning and conditional simulation – unrealistic expectations?

    By I Clark, S C. Dominy

    Bulk sampling programs are typically applied in coarse gold mineralised systems to verify resource/reserve grades. In recent years, there have been controversies surrounding some results of undergroun

    May 9, 2017

  • AUSIMM
    Planning for Rehabilitation of Lands Disturbed by Alluvial Gold Mining on the West Coast

    By A Tinnelly

    Land disturbed by alluvial gold mining should be restored to a capability or productivity as good as that which existed prior to disturbance.   Effective rehabilitation requires detailed planning

    Jan 1, 1989

  • AUSIMM
    Structural Controls on Mineralisation at the Broken Hills Epithermal Au-Ag Deposit, Coromandel Peninsula, New Zealand

    By J Mauk, J Rowland, S Rabone

    Most epithermal Au-Ag deposits in the Hauraki Goldfield are hosted in late Miocene andesites. Broken Hills is an exception, being one of the few economic deposits hosted in rhyolite. Investigation of

    Jan 1, 2003

  • AUSIMM
    The Mineralogical Researches of Gold Ores and Technological Products at Operating Factory in Olympiada Mine (Russia)

    The Mineralogical Researches of Gold Ores and Technological Products at Operating Factory in Olympiada Mine (Russia)

    Sep 13, 2010

  • AUSIMM
    The Phased Metallurgical Upgrade Strategy at Gold Fields Limited South African Operations

    By A B. Phillips

    This paper details the approach adopted to upgrade the current metallurgical facilities at both the Driefontein and Kloof Gold Mines in the Republic of South Africa. Goldfields Ltd operates eight meta

    Jan 1, 2003

  • AUSIMM
    The Gosowong Goldfield – A World-class Epithermal Gold-silver District in Indonesia

    By A Harris, N Fitzpatrick, F MacCorquodale

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Gosowong epithermal Au-Ag deposits, located on the island of Halmahera, North Maluku Pr

    Mar 18, 2015

  • AUSIMM
    The Monowai Mine û A Mechanised Mini-Mine in a Forest Park

    A summary of a proposal to develop a 20 000 tpa underground gold operation in a Forest Park. The environmental constraints are severe and affected the mine development planning and choice of mining me

    Jan 1, 1986

  • AUSIMM
    In-Pit Crushing and Conveying (IPCC) - An Economic Alternative to Trucks that Delivers on Safety and the Environment

    If the industry keeps doing what it has always done, it will continue to get what it has always got - rising operating costs. Why is this so? Generally grades being chased are becoming lower, strippin

    Jun 1, 2010