Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Capital Optimisation in the Coal Industry

    The optimisation of capital in the total planning context has broadly two components: ò maximising the efficient utilisation of capital against competing capital demands; and ò maximising the effici

    Jan 1, 1991

  • AUSIMM
    Review of the Mobile Miner at Isa Mine

    The search for an efficient and economic machine to excavate hard rock continues. Development of the Robbins Mobile Miner commenced in 1983 with the formation of a joint venture between Mount Isa

    Jan 1, 1988

  • AUSIMM
    Foresight Project - Minerals and Mining Sector Strategy: Vision for 2010

    By R G. Barker, A B. Christie

    Minerals are necessary for providing almost everything we take for granted in our daily lives including food, shelter, and supplies of energy and water. Minerals are therefore essential for the mainte

    Jan 1, 1998

  • AUSIMM
    Some Aspects of Interaction Between the Coal Industry and the Community

    The history of black coal as a fuel dates back in Europe more than 2,300 years, and possibly longer in China. Originally the mining of coal was done by underprivileged people, but with the industrial

    Jan 1, 1975

  • AUSIMM
    Geology and Ore Deposits of Masara Mine, Davao del Norte, Philippines

    By Estoque J, Lodrigueza L, Rebillon F

    Ore mineralization in Masara consists mainly of gold-silver veins, porphyry copper and pyrometasomatic deposits related to left-lateral movements along the Philip- pine fault system and a later sta

    Jan 1, 1987

  • AUSIMM
    Groundwater Management in Coal Bed Methane Projects ù Turning a Waste into a Resource

    By C M. Hill

    This paper aims to provide a brief overview of the Australian Coal Bed Methane (CBM) industry and more importantly the challenges to sustainable management of the industryÆs by-product, groundwater. I

    Jan 1, 2003

  • AUSIMM
    The Los Pelambres Overland Conveyor Braking System

    By N R. Johnson

    The overland conveyor at the Los Pelambres mine in Chile is designed to move 8700 t/h of material over 12 km at a speed of 6 m/s while descending 1400 m. The conveyor, which is divided into three segm

    Jan 1, 2005

  • AUSIMM
    Resource Modelling in an Evolving Mine - CSA Mine, Cobar, New South Wales

    By E Haren, A Winchester

    The CSA Mine has a long and varied history from initial discovery in 1871 through to the present. Lead-zinc mineralisation was mined historically near the surface. Today copper and silver are extracte

    Jan 1, 2006

  • AUSIMM
    The Application of Powered Supports, Continuous Miners, and Continuous Transport to Full Extraction

    The three systems of mining in use in the Southern Coalfield of New South Wales are bord and pillar with or without subsequent extrac- tion, longwall and shortwall. Bord and pillar with extraction i

    Jan 1, 1976

  • AUSIMM
    Optimising the Yield and Distribution of Effective Explosion Energy in Fans and Rings of Blastholes

    The cost-effectiveness of blasts involving radiating blastholes is cur- rently restricted in the following ways. (a) Significant percentages of potential explosion energy are not being liberated; the

    Jan 1, 1988

  • AUSIMM
    The Commissioning and Operation of the Carbon-in-Pulp Plant at Australis Mining N.L., Norseman, Western Australia

    Australis Mining N.L. operates a continuous mode carbon-in-pulp (CIP) gold plant, processing sand and slime tailings from previous gold mining operations in the Norseman area. Plant design is that o

    Jan 1, 1982

  • AUSIMM
    Optimising Leach Pad Construction Methods for Site Specific Applications

    By Thompson P, Sharma Y

    The paper describes the methodology and results from a study carried out by Telfer Gold Mine to optimise the materials and costs involved in construction of the pad for their dump leach operations.

    Jan 1, 1994

  • AUSIMM
    Recent Drilling and Blasting Developments Groote Eylandt Mining Company Pty. Limited

    By Fitter JF

    Drilling and blasting practices at Groote Eylandt are undergoing a period of rapid change. Practices over the last ten years are reviewed and some specific blasting problems currently being faced

    Jan 1, 1982

  • AUSIMM
    Notes on Tungsten, with Particular Reference to King Island Scheelite Treatment and Assays of Low-Grade Material

    TUNGSTEN occupies an outstanding position amongst metals to-day, for by its use modern manufacturing methods have received a wonderful impetus. The important part played by tungsten in the recent war

    Jan 1, 1921

  • AUSIMM
    Design Selection and Application of a Pressure Filtration System to the Dewatering of Copper and Lead Sulphide Slurries

    By Hawes GW

    Until 1980 copper, lead and zinc sulphide slurries have been success- fully dewatered for rail and sea transport for many years at the Rose- bery site of North Broken Hill Holdings Ltd. utilizing conv

    Jan 1, 1988

  • AUSIMM
    Possible Metallogenic Significance of Epizonal, Polymetallic Vein Mineralisation at San Bartolome in the Ecuadorian Andes: A Working Hypothesis.

    The epizonal Ag-Pb-Zn vein deposit at San Bartolome is characterised by a base-metal sulphide assemblage containing the spectacular development of interpenetrating, bladed networks of pyrrhotite whic

    Jan 1, 1995

  • AUSIMM
    A Systems Approach to the Planning of Coal Resource Investigation and Mining Development

    By White B

    A novel approach is suggested for the solution of planning and development problems in the coal, mining industry. The formation of coal measures depends to a significant extent on sequential geolog

    Jan 1, 1987

  • AUSIMM
    Gravity Leaching ù The ACACIA Reactor

    By G Steward

    Gravity Leaching of high-grade gravity gold concentrates, such as Knelson Concentrates, with the ACACIA Reactor represents a new generation of concentrate treatment methods. The ACACIA Reactor is a co

    Jan 1, 2002

  • AUSIMM
    Collection and Application of Geological Data for Design of Underground Openings at Mount Isa

    By Blair JR

    The tunnel alignments investigated for the Gosford Regional Sewerage Scheme are located in the Terrigal Formation and are covered for most of their length by a thick blanket of soil and weathered

    Jan 1, 1976

  • AUSIMM
    Refurbishment and Modernization - the Proven Alternative to Replacement of Large Materials Handling Equipment

    The process of refurbishment is not a precisely defined one. It is under- stood to mean an upgrading of a plant which is normally performed only once. The application of refurbishment in the field of

    Jan 1, 1989