Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Geometry of the Heavy Sulfide Zone - A Challenge for Mine Planning and Geotech at Grasberg

    By S C. Sc, J Young, N Belluz, D Nicholas

    The heavy sulfide zone (HSZ) of the Grasberg deposit has the geometry of a funnel and is located at the contact of the mineralised intrusive and the relatively barren sedimentary rock types. The geome

    Jan 1, 2007

  • AUSIMM
    Discussion of the Results of Coal Drilling at Mount Davy

    This paper will be a discussion of the geological exploration and drilling carried out on the Mt Davy Block, Greymouth Coalfield. A brief summary of the geology of the Greymouth Coalfield will be giv

    Jan 1, 1979

  • AUSIMM
    Maintenance Requirements and Procedures for Underground Mobile Equipment, C.S.A. Mine, Cobar

    The maintenance system for underground mobile equipment at Cobar Mines Pty. Ltd. has been modified from that originally planned as a result of experience gained in operating the equipment.Downtime due

    Jan 1, 1969

  • AUSIMM
    The Use of Wireline Logging to Control Blasting

    Opencast blasting is notoriously subject to variable blasting conditions, some of which are related to changes in ground conditions and some to human and equipment factors. As drilling and blasting

    Jan 1, 1988

  • AUSIMM
    Geomechanical Data Acquisition and Numerical Modelling for Coal Mine Design

    By Seedsman RW, Duncan Fama ME

    Mine design procedures will be revolu- tionised by technological developments in computers, software, database construction and management, and numerical modelling programs. Developments in geotech

    Jan 1, 1987

  • AUSIMM
    Coal Geology - Where to From Here?

    By Hanna P

    Coal geologists are under pressure to minimise exploration expenditure, maximise interpretation confidence and produce the results often too soon. This pressure continues to increase as companies are

    Jan 1, 1998

  • AUSIMM
    The Reduction of PbO-Silicate Melts Using CO

    By Hayes P. C

    The kinetics of reduction of PbO-silicate melts in CO-N gas mixtures at 900¦C have been studied. Rea~tion rates were measured by moni- toring the CO2 content of the product gas. A wide range of gas

    Jan 1, 1987

  • AUSIMM
    Transpression Regime in the Southern Alps and Possible Extension Regime in Canterbury, New Zealand

    Detailed mapping in the Permian-Triassic clastic sediments of the Southern Alps delineates a number of strike-slip faults, both dextral and sinistral, associated with the major Alpine Fault to the wes

    Jan 1, 1990

  • AUSIMM
    Guidelines for Horizontal Transportation

    In current mining practices it is desirable to bring about a substantial increase in both rate of face advance and productivity, thus compelling the mine engineer to consider better and more productiv

    Jan 1, 2003

  • AUSIMM
    Copper Skarn Deposits in Eastern China (92f36f50-d094-4edf-add9-cf3f94eac5a1)

    In eastern China, most of the copper skarn deposits occur in folded troughs which are controlled by the EW-trending faulted fold systems (the Pal-Asian geotectonic domain), and the NNE-trending rift

    Jan 1, 1995

  • AUSIMM
    Design and Optimisation of Cadia Hill Open Pit, Cadia Valley Operations, Newcrest Mining Limited

    By F Pothitos, S Hewson

    The geological and geotechnical conditions at the Cadia Hill Open Pit are very complex. This complexity coupled with high mining rates has required significant technical input into the design and opti

    Jan 1, 2003

  • AUSIMM
    The Effect of Mineralogy on the Leaching Characteristics of BHAS Copper-Lead Matte

    By Pollard D. M

    The BHAS copper-lead matte leach process, developed in Port Pirie, South Australia, has been in operation on a commercial scale since 1984. This process is one of many developed in the past decade

    Jan 1, 1989

  • AUSIMM
    The Application of GyÆs Formula and Sampling Best Practice at the Snap Lake Phase I Diamond Bulk Sampling Plant

    The Snap Lake Phase I project initiated a subsampling campaign on the material (kimberlite/metavolcanic/granite) mined and treated for diamonds. The campaign was aimed at determining the optimum subsa

    Jan 1, 2005

  • AUSIMM
    Materials Handling in Open Cit Mines State of the Art and Near Future Developments

    Depressed prices for minerals will force the mining industry to became more efficient. The continuous conveying of pit product is one area in which savings can be made. Conveyors are available, or

    Jan 1, 1986

  • AUSIMM
    A Study on Stress Distribution and Reasonable Size of Coal Pillar in a Coal Face

    By Wang QP, Quan YH

    Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the

    Jan 1, 1992

  • AUSIMM
    The Precipitation of Arsenic from Aqueous Solution in Relation to Disposal from Hydrometallurgical Processes

    By Glastras M. V

    The presence of arsenic in solutions which result from the processing of many sulphide minerals leads to a need to understand its speciation in aqueous systems and the reactions of those various s

    Jan 1, 1987

  • AUSIMM
    Acid and Oxygen Plant Commissioning at the Olympic Dam Copper Smelter

    By Collins D. N

    The Olympic Dam Copper Smelter Acid Plant is a hybrid plant capable of producing sulphuric acid from either sulphur burning, metallurgical gases or a combination of both. Commissioning of the Acid

    Jan 1, 1989

  • AUSIMM
    Mineralisation of the Morobe Goldfield, Morobe Province, Papua New Guinea (888bc9dd-2413-4b17-98cf-f01418ee929d)

    By Mowat BA, Leach TM

    The Morobe Goldfield in Papua New Guinea has produced in excess of 120 tonnes of gold from predominantly alluvial sources. Hardrock gold has been mined historically at Wau (23t) and Edie Creek (40 an

    Jan 1, 1995

  • AUSIMM
    Column Flotation of Gold Bearing Iron Sulphides

    By Schommarz KH, Dunne RC, Goodall CM

    Column cells are widely used today for the recovery of base metals by flotation. Their use for the flotation of iron sulphides has not been as rapid. Australia has pioneered the use of large rougher

    Jan 1, 1993

  • AUSIMM
    The Use of Aurosave Adsorption Process for Gold and Precious Metals

    By Noakes M. J

    Research and development into alternate gold and precious metals adsorbents has resulted in the development of a new technology named the AUROSAVE adsorption process (ARGOSAVE'" for high silver

    Jan 1, 1988