Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Future Directions in Metallogenic Research

    The outcome of future metallogenic research will be important to everyone because it will. have a profound impact on our ability to find new deposits of non-reservable mineral resources. Failure to re

    Jan 1, 1990

  • AUSIMM
    Leveraging Your Commodity in a Bullish Market ù Making the Most of Challenges and Opportunities

    As part of the response to the increased demand for products such as iron ore, coal and gold many resource companies have identified the need to develop strategies focused on attracting high demand pr

    Jan 1, 2006

  • AUSIMM
    Effect of Cupric on the Separation of Pyrite from Arsenopyrite

    By Shinnosuke U, Zhang HE

    In this paper, it is shown that the higher the pre-activation concentration of copper ions in pulp, the larger the adsorption amounts of copper ions and xanthate on arsenopyrite surface, and the bet

    Jan 1, 1993

  • AUSIMM
    Developments in Determining the Performance of Steel Fibre Reinforced Shotcrete

    By E S. Bernard

    Steel fibre reinforced shotcrete (SFRS) is increasingly being used as ground support in both civil and mining applications. In recent years, methods of assessing the performance of SFRS have been deve

    Jan 1, 1999

  • AUSIMM
    The Mabilo Copper-gold-iron Deposit – A New Skarn Discovery in the Philippines

    By G Maude, R Ayres, R N McLean, N A. Reynolds

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Mabilo copper-gold-magnetite skarn deposit is located in southern Luzon in the Paracale

    Mar 18, 2015

  • AUSIMM
    Declining at Spargoville, W.A.

    Development of a small ore body to 137m below surface was carried out in sixteen months driving 610m of 1:5 decline.

    Jan 1, 1973

  • AUSIMM
    Stability of Hydraulic Backfill Barricades

    Hydraulic backfill is generally retained in stopes using permeable barricades. Mitchell et al (1975), Mitchell (1992) and Grice (1989) have shown that under normal drainage conditions, barricades expe

    Jan 1, 1998

  • AUSIMM
    Morro do Ouro Geological Model with a Metallurgical View

    By Y Akiti, J Moller, E Esper, R Rugolo, A Pains

    "Morro do Ouro Mine is a high tonnage/low-grade mine located in Paracatu, Minas Gerais State, Brazil. The mines move around 55 Mt of ore per year at an average grade of 0.4 g/t. The auriferous mineral

    Sep 29, 2013

  • AUSIMM
    Experimental study on the mechanism of gas-coal dust synergistic control based on compound reagents enhanced water spray technology

    By B Zhao

    Gas and coal dust, as potential harmful elements (PHEs) produced during mining, are considered two serious threats to the safe mining and the health of miners because of its explosive and pathogenic p

    Oct 12, 2022

  • AUSIMM
    Quantitative Clay Mineralogy for a Calcrete-Hosted Uranium Deposit – Innovative Application of Existing Technology on an Unprecedented Scale

    By C Lower

    An unprecedented, quantitative, deposit-scale understanding of major clay mineral distribution throughout the Yeelirrie uranium deposit has been achieved by adapting the existing HyLogger™/HyChips™ an

    Sep 5, 2011

  • AUSIMM
    Construction Management of Hydrogeological Aspects of Melbourne City Link Project

    By I A. Lamb

    The Melbourne City Link Project has two tunnels, the Domain and Burnley Tunnels, which have been constructed by Transfield Obayashi Joint Venture (TOJV) under a design and construct contract. The two

    Jan 1, 1999

  • AUSIMM
    Energy complexities in complex orebodies

    By M Ziemski

    The provision and management of energy in both fuel and electricity forms is an increasingly important consideration for mines. Pressures from communities, governments and markets are increasing towar

    Nov 21, 2018

  • AUSIMM
    Prediction of Rock Fragmentation Using a Gamma-based Blast Fragmentation Distribution Model

    By H Mansouri, M A. Ebrahimi Farsangi, F Faramarzi

    A blast fragmentation model is developed based on the gamma function to describe the run-of-mine fragmentation distribution. The model presented is aimed to benefit from simplicity in application and

    Aug 24, 2015

  • AUSIMM
    An Experiment to Validate Bubble Sizing Techniques Using Bi-Modal Populations of Known Proportions

    A novel approach to validate size distributions obtained from bubble sizing techniques is introduced. The experimental rationale consists in verifying whether the output features the anticipated bi-mo

    Jan 1, 2005

  • AUSIMM
    Tunnel Boring Under Stockholm City

    Boring of a 7.5Km long tunnel under the city of Stockholm commenced in January, 1987. The 3.5m diameter tunnel will pass under the buildings and as no ground settlement is allowed, the regulation f

    Jan 1, 1987

  • AUSIMM
    Direct Electrowinning of Lead from Lead Sulphide Concentrates

    By Siemon J. R

    It is possible to use compacted anodes formed at low pressure for the direct electrowinning of lead from sulphide concentrates. An anode containing 5.5 per cent graphite, formed into a compact at 34 M

    Jan 1, 1976

  • AUSIMM
    Optimisation of Mines and Smelters by the Application of Improves Computing Systems

    By Quayle J. E

    This paper covers period from 1973 through to 1988 and the mines of West Coast Mines, Elur Mine, North Mine and Risdon Zinc Smelter, now all part of the Pasminco Group. During this period, optimisat

    Jan 1, 1991

  • AUSIMM
    Living with Change at South Bulli Colliery

    By Ogilvie M

    South Bulli is the oldest and largest underground coal mine in Australia. Two longwall units are in operation and current production is 2.5 to 3 million tonnes of run of mine product per year with a w

    Jan 1, 1991

  • AUSIMM
    The selection, commissioning, and evaluation of a large diameter, variable speed ball mill at Bougainville Copper Limited

    By Clark G

    The latest addition to the grinding circuit at Bougainville Copper Limited is another 5.5m by 7.3m primary mill (No.13). The mill can operate in a primary or secondary mode. Its distinguishing fea

    Jan 1, 1986

  • AUSIMM
    Goldilocks – value of information for geoscience applied to coal in tactical time horizons

    By D Lucato, B Haase, R Saha, S Limberger-Forte, J Lishman

    Cadia East Mining operations have employed geometallurgical techniques to advance the understanding of the in situ rock hardness variability across existing Panel Caves (PC). Geometallurgy advances th

    Mar 22, 2022