Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The benefits of automated metallurgical accounting for plant samplingBy D W. Wall, J P. Vagenas
Questions of sampling precision and accuracy affect every process plant in differing ways and to differing extents. To address these perceived issues, chemists, metallurgists and engineers are often a
May 9, 2017
-
In-pit Tailings Disposal at Langer Heinrich – Tailings Storage Facilities in a Unique Hydrogeological SettingBy D Luppnow, C Hore
In-pit tailings storage can provide many advantages when compared to typical above-ground tailings storage facilities (TSFs). As regulations become more restrictive and existing mines expand into new
Jul 27, 2015
-
Driving Mine Performance through CommunicationBy S Jeffrey, S Mundell, F Arboleda
In the current cycle of low commodity prices and rising costs, mine managers continue to focus on optimising mine performance and productivity. A critical component of strengthening performance and pr
Jun 22, 2016
-
Localised Uniform Conditioning in the Multivariate Case - An Application to a Porphyry Copper Gold DepositBy W Assibey-Bonsu
The paper provides a brief review of the multivariate uniform conditioning and the localised multivariate uniform conditioning techniques and presents a case study based on a porphyry copper gold depo
Sep 26, 2011
-
Developments in Tube Bundle Gas MonitoringBy M Watkinson
Tube bundle monitoring systems have come a long way from their first introduction to coal mining in the late 1960s/1970s. Early developments in the United Kingdom (UK) commenced with single gas analys
Aug 31, 2015
-
The risk management and cost benefits of using a total monitoring approach to managing slope instability hazards in open pit minesBy C Jacobsen, N Harries
Assessing and managing instability hazards is an essential activity when working with unstable natural slopes and excavated open pit mining slopes. Slope monitoring has become the standard technique f
Nov 29, 2022
-
Risk-Based Ore Selection from Conditionally Simulated Block ModelsBy J E. Everett, F Grobler
This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo
Aug 12, 2013
-
Harnessing data complexity – how machine learning applies all project data for accurate resource modellingBy S Sullivan
A recent review of resource reports lodged to statutory bodies found geological models with oversmoothed or unrealistic lithological boundaries, many of which do not represent geological appearance in
Mar 22, 2022
-
The ground motions induced by blasting in open pit lignite mines and its environmental effectsBy O Aydan, R Ulusay
Blasting is the most commonly used excavation technique in mining and civil engineering applications. Blasting induces strong ground motions and fracturing of rock mass in rock excavations. Particular
Nov 30, 2018
-
Higher Energy Bulk Explosives – Matching Products to Rock Types Using an Energy Map ConceptBy S Thomson, G Rigby, J Norgard, D Wilkinson
Bulk explosives provide the energy to move a rock mass and reduce it to an optimal size (fragmentation). The intensity of energy needed depends on several factors including a customer’s geology and en
Aug 24, 2015
-
Reconciliation of Orebody Model Predictions – System and PeopleBy T Burns, P Savory
In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data
Aug 18, 2014
-
Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)By D Horacek, I K. Sheppard
Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in
Jan 1, 2007
-
Hydrogeological characteristics of co‐disposed tailings and coarse rejects from coal processingBy S Fityus, K Koosmen, J Simmons
The purpose of this paper is to therefore investigate the hydrogeological characteristics of tailings, coarse and mixed rejects from coal processing to enable better understanding of the potential for
Jul 1, 2021
-
Challenging the Norm – Alternative Excavation Method in MiningBy R Burke, G Ramage, C Donnelly
Over the decades, Redpath has undertaken a multitude of tunnelling and underground excavation projects for civil and mining clients both domestically and internationally. These projects have been unde
Mar 24, 2014
-
Life of Asset Planning, Uncertainty and Value Optimisation of the Iron Ore Business – From Exploration, to Market, to ClosureBy J McCluskey, N Barros
"Long-term strategic planning at BHP Billiton’s Western Australia Iron Ore business aims for sustainable value maximisation of its large, long-life, low-cost, expandable mineral inventory and supply c
Nov 24, 2014
-
The influence of roadway configurations on VCD and bulkhead designBy M Salu
Ventilation control devices (VCD’s) and bulkheads are critical controls used for managing risk in underground coalmines. Following the Moura No. 2 mine explosion in 1994, the Queensland Mines Departme
Oct 12, 2022
-
Mining 4.0 initiatives – a pathway to a smarter mining fleetBy K Rau
The overall success of a mining operation is directly impacted by the reliability and availability of mining equipment. Heavy-duty vehicles such as excavators and haul trucks are used for conveying of
Sep 1, 2024
-
The Ore-Deposits of Captain's Flat, New South WalesThe revival of the mining industry at Captain's Flat after a long period of years of inactivity has attracted attention to the importance of the ore-deposits of that field as potential sources of
Jan 1, 1941
-
The Benefits of Using SmartEar™at Pueblo ViejoBy D Shuen, R Sales, D La Rosa
Semi-autogenous grinding (SAG) mill control is complex and depends on many dynamic process variables. Good control strategies ensure that a mill is operating as close to optimal as possible, resulting
Sep 1, 2014
-
Mt Owen Mine Spotted-tailed Quoll StudyBy P York
The study commenced in October 2012, to understand the basic ecology of the spotted-tailed quoll (Dasyurus maculatus) and to confirm whether the species utilise previously mined land on the Mt Owen mi
Jul 16, 2014