Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Flotation Process Control Optimisation at Prominent Hill

    By J Lombardi

    OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an

    Aug 8, 2011

  • AUSIMM
    Ramp-up and long-term performance of the Albion Process™ plant at GeoProMining Gold Armenia

    By D Walker, A Tsvetkov, P Voigt, O Kloiber-Deane

    The GPM Gold Operation has been employing an Albion Process™ plant at its Sotk (Zod) gold mine in Armenia since 2014. Long term data from the operation is now being published for the first time. The

    Aug 29, 2018

  • AUSIMM
    Development of an Integrated Platform for the Analysis, Modelling and Design in Panel Caving Mines

    By G Pizarro, O Miranda, D Rosales

    In panel/block caving mines, large amounts of information are collected at the operations. This information includes grades and extracted tonnage, fragmentation, lithology, design of stopes and main i

    May 9, 2016

  • AUSIMM
    A Sustainable Future in Management of Dust Emission during Transport of Coal and Iron Ore

    By J Planner

    As Australia’s coal and iron ore export volumes increase to meet international market growth, port terminals, mining operations and rail transport systems can be the source of increased dust emission.

    Nov 22, 2011

  • AUSIMM
    From paper to bytes – digital mapping implementation

    By A Whaanga

    The use of photogrammetry has greatly increased the accuracy of 3D mapping underground. However, this has not reduced the need or desire for geologists to produce plans and sections showing an interpr

    Mar 22, 2022

  • AUSIMM
    Life-of-Mine Ventilation System Upgrade at Springvale Colliery - A Case Study

    By B Smith, R Gelson

    Springvale Colliery is an underground longwall mine situated approximately 10 km north-west of Lithgow in the western coalfields of New South Wales. Following a full-scale review of the mineÆs ventila

    Jul 1, 2013

  • AUSIMM
    Hy3 (Hy-cube) project – Hyundai Steel’s carbon neutral strategy

    By H Kim, M J. Sun

    In order to reduce carbon emissions from the steelmaking process and achieve carbon neutrality, global steel companies are establishing their own medium to long-term strategies and implementation plan

    Jun 19, 2024

  • AUSIMM
    Combining physical experimentation and mathematical modelling techniques in the simulation of induration and direct reduction processes

    By Wright JK, Turner RE, Batterham RJ, Morrison AL

    Simulation can play an important role in the design, optimization and control of complete industrial processes, the most appropriate method depending on the particular application. Most commonly,

    Jan 1, 1986

  • AUSIMM
    In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case study

    By K Grohs, A Satriawan, S R. Pearce

    Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi

    Aug 2, 2023

  • AUSIMM
    Explosive dust management system for underground coalmines, digitally integrating stone dust application, sampling plans, and results to help mitigate explosion risk

    By B Waldon, M Valastro

    A coal dust explosion is one of the most significant risks in the harsh and complex environment of an Underground Coal Mine (UCM). Reviewing literature, regulations and existing systems surrounding ex

    Apr 16, 2024

  • AUSIMM
    Investigating the Effect of Different Block Dimensions on the Economic Life of Open Pit Mines

    By P Moarefvand, M Osanloo

    The anticipated economic life of the mine, which defines the rate of mine production, is dictated initially by the design capacity of the mill/concentrator and the production capacity of the mine rela

    Sep 26, 2011

  • AUSIMM
    DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First Principles

    By P Vass, C Butler, J Condon, B Hooper

    DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing

    Sep 29, 2013

  • AUSIMM
    Elevating geotechnical considerations in the Australian underground coal industry and mine planning process

    By T Stambolie

    Mine planning processes are continuously evolving, increasing in complexity, and are required to be developed in shorter timeframes, often missing important steps in the process. Underground coal mine

    Nov 30, 2018

  • AUSIMM
    A Collaborative Model for Developing Future Continuing Education and Training in Mining

    By S W. Houlding

    The Certificate in Mining Studies program at the University of British Columbia, Vancouver, Canada is a collaborative initiative between mining schools and industry to provide accessible, cost-effecti

    Nov 22, 2011

  • AUSIMM
    The Shrinking Coal Market in the US – Sample More or Sample Less?

    By S A. Campbell

    There has been a reduction of coal production in the United States due to environmental pressure and the increased use of natural gas. This reduction will require coal producers and consumers to make

    Jul 29, 2014

  • AUSIMM
    Analysis of Stability and Design of Face Support for Cross Passages – Waterview Connection Tunnels, Auckland, New?Zealand

    By M G. Wansbone, R Bhargava

    The inferred ground conditions for the proposed mined cross passages at the northern end of the Waterview Connection tunnels consist of an overburden of alluvial and residual soils, with mixed face ge

    Sep 17, 2014

  • AUSIMM
    The Path to Best Practice at Geita Gold Mine

    By M Monaghan, B S. Gregory

    The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I

    Sep 18, 2012

  • AUSIMM
    Optical and SEM-Based Microscopy Integration for Optimisation of Geometallurgical Modelling and Ore Deposit Characterisation

    By R Hartner

    Digital optical microscopy (DOM) and automated SEM-based (ASEM) mineralogy systems (MLA, QEMSCAN) have experienced significant developments within the last decade. However these developments have been

    Sep 5, 2011

  • AUSIMM
    Measurement of Residual Shear Strength Using a Modified Direct Shear Apparatus

    By L Tatnell, R Mackay, A Tolooiyan

    The multi-reversal direct shear test (MRDS) method is commonly used to measure the residual shear strength of soils. However, when the standard direct shear (DS) apparatus is used, the MRDS method is

    Nov 5, 2014

  • AUSIMM
    Dredging fine tailings

    By S H. Burgmans, B Anderson

    This paper aims to define the specific challenges relating to dredging fine tailings from an above ground storage facility for transferral to a mined-out pit. In addition, it compares dredging and min

    Jul 1, 2021