Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Segregating tailings – effects on density and water retention

    By K Seddon

    Segregation of tailings on deposition can occur as a result of a) sub-aqueous deposition, and b) sub-aerial deposition at lower solids concentrations (i.e. when the solids concentration is less than t

    Jul 23, 2018

  • AUSIMM
    The Product Quality System at Cliffs Natural Resources – Koolyanobbing Iron Ore Operations

    By A L. Wills

    Cliffs Natural Resources Pty Ltd (Cliffs) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three separate hubs and trucked to Koolyanobbing. There it is crus

    Jul 11, 2011

  • AUSIMM
    Production Variance Benchmarks and Their Use in Project Evaluation and Due Diligence

    "Cash flow modelling during project evaluation is enhanced when probabilistic methods are applied to the inputs. One of the important inputs is the quarterly production profile. Typically, the steady-

    Mar 8, 2016

  • AUSIMM
    Developing an evaluation method for bulk ore sorting

    By S Dykes, R J. McCarthy, B Klein

    There is growing interest in the mining industry on the application of ore sorting. While many are familiar with particle sorting, including the limitations that technology presents (e.g. throughput),

    Nov 10, 2020

  • AUSIMM
    Defying Gravity – Brownfield Continuous Improvement

    By J Robinson, L D’Uva

    "The Gold Fields group and Gekko Systems have successfully worked together on multiple projects, including at the St Ives, Agnew and Granny Smith operations in Western Australia, and the Damang operat

    Oct 10, 2016

  • AUSIMM
    Tailing Thickener Operability and Control Improvements at ProminentáHill

    By J Lombardi, M Weidenbach

    "OZ MineralsÆ Prominent Hill copper-gold concentrator is located 650 km north-east of Adelaide, 130 km north-east of BHP BillitonÆs Olympic Dam operation and 130 km south-east of the regional township

    Oct 29, 2012

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.

    Jul 1, 2013

  • AUSIMM
    Flotation launder design and the measurement of critical froth transport parameters

    By B Wong, R G. Coleman

    In flotation, the selection of the size, number and type of cell for a particular duty depends on two important factors. Firstly, the required flotation residence time and secondly, the physical const

    Aug 29, 2018

  • AUSIMM
    Effect of SiO2 on the structure and crystallisation of CaF2-CaO-Al2O3 slag used in electroslag remelting

    By S Basu, P M. Midhun

    Electro-Slag Remelting (ESR) is a process capable of producing ingots with much lower centre-line segregation and better internal soundness than conventional ingot casting processes, as well as lower

    Jun 19, 2024

  • AUSIMM
    Development of a remotely operated robotic mechanism for accessing and removal of metal tramp from primary gyratory crushers

    By H Lemos, E Nunes, D Jacobson, R Costa, L Ono, A Alves, H Delboni Jr

    Oversize rock breaking and metal tramp removal are key issues for reducing primary crusher downtime, as well as improving the safety associated with its operation. Remote operation of such tasks would

    Nov 8, 2021

  • AUSIMM
    Quantification of surface sensor representivity of primary crushed ore for bulk ore sorting

    By J Rutter, D Francois-Bongarcon, M Federov, N Odiar, M Scott

    There are two fundamental methods for metalliferous sensing of primary crushed ore available for deployment at operations. These methods can be classed as surface measurement techniques (including XRF

    Nov 10, 2020

  • AUSIMM
    Sustainable Plant Design

    By J Kwak

    Driving sustainability concepts and practices into the heart of the design process is the key to achieving a successful, sustainable plant design. Engineering design practices, tools, systems and meth

    Jan 1, 2004

  • AUSIMM
    Latest fifth generation (Mk V) gyratory crushers with focus on safety and maintenance features

    By W Malone, J Garrett

    FLSmidth (FLS) has spent the last 15 years, working with customers and engineering houses to deliver innovative improvements in crusher safety, coupled with the latest, maintenance friendly, crusher d

    Sep 18, 2023

  • AUSIMM
    Unique Coal Mine Drift Construction Method

    By C Donnelly

    Redpath Australia is using a unique mining method for the Australian underground coal industry at Kestrel Mine Extension in the Bowen Basin, Central Queensland.The project involves completing two sepa

    Mar 21, 2011

  • AUSIMM
    Developing and maintaining mine site ventilation capability and new trends in mine ventilation career paths

    By D J. Brake

    The importance of mine ventilation to health and safety in both coal and metalliferous mines has been long recognised. The primary and secondary ventilation systems in most metalliferous mines incur 5

    Oct 12, 2022

  • AUSIMM
    The Role of Benchmarking and Independent Reviews

    By D Hunter, N Cusworth, J Miller

    "Recent project failures have called into question the use and relevance of benchmarking and independent reviews, forcing a rethink of traditional processes and procedures.With cost estimates and sche

    Mar 8, 2016

  • AUSIMM
    Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass

    By B Chapman, R Nievergelt, J Hill

    A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume

    Sep 17, 2014

  • AUSIMM
    Empirical geostatistics #1 – kriging slope of regression: sensitivities and impacts on estimation, classification and final selection

    By D Kentwell

    IGO Ltd’s (IGO) Nova Operation (Nova) is 160 km east-north-east of the town of Norseman in Western Australia (WA). Discovered by Sirius Resources NL (Sirius) in 2012 and acquired by IGO in 2015, the N

    Mar 22, 2022

  • AUSIMM
    An assessment of battery trolley systems’ performance in surface mines

    By H Bao, M Nehring, M Kizil, P Knights

    The mining sector, a notably energy-intensive industry worldwide, is a major consumer of fossil fuels, leading to significant carbon emissions globally. The move towards electrification, coupled with

    Sep 1, 2024

  • AUSIMM
    Blasthole Cone Sampling Experiments for Iron Ore Flitch Mining

    Blasthole cone samples are used for grade control in most of the iron ore mines of the Pilbara of Western Australia. This method of sampling is straightforward when the target sampling interval matche

    Mar 1, 2010