Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Ramp Up of the Pasminco Century Concentrator to 500 000 tpa Zinc Metal Production in ConcentrateBy M Spagnolo, M Ashley, D, L Reemeyer
PasmincoÆs Century Concentrator in North West Queensland commenced operations in November 1999. The nameplate production capacity of 500 000 tpa of zinc metal production in concentrate was achieved in
Jan 1, 2003
-
Bulk Solids SamplingBy J E. Powalisz
Obtaining a representative sample of bulk materials in process industries is critical to providing valid data for process control and custody transfer (valuation). The accuracy of a sample, that is to
Jul 29, 2014
-
Alternatives to Conditional Simulation for the Estimation of Iron Grade Distributions ù A Case Study From BHP BillitonÆs Mt Whaleback OperationsConditional simulation can be used to determine the probabilities of block iron-grades being above selected cut-offs. However, there are much faster alternatives that can produce acceptable results. I
Jan 1, 2005
-
The Wedge Theory of Borehole Charge Design for Bench Blasting and Its Numerical SimulationBy Q Yu, G Ren, Z-Y Chen, J Yang
The wedge shape theory of the rock fragmentation range in bench blasting is presented according to the dynamic characteristics of rock fragmentation by blasting in open pit under the condition of hole
Aug 24, 2015
-
A New Tool for Extensometer Data Analysis and Improved Understanding of Geotechnical Risk FactorsBy M Szwec, P Corbett, P Sheffield
Centennial Coal operates the Springvale and Angus Place longwall mining operations that extract coal beneath the Newnes Plateau in the Western Coalfields of New South Wales. Springvale and Angus Place
Nov 5, 2014
-
Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper OperationsBy G Chitumbura
Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu
Mar 21, 2011
-
Slope radar monitoring – a partnership and infrastructure case study of scalability, reliability and availabilityBy E Shilov, R Dixon, L Tovey
BHP Western Australian Iron Ore (WAIO) operations use a suite of slope monitoring systems which are deployed to operational areas based on the ground control risk. Slope Radars are one system used wit
Nov 29, 2022
-
Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process ControlBy J Hartog, V Beehan, D Beeson
Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing
Sep 1, 2014
-
A case study: how being ‘aware of now’ is making work safer at Telfer undergroundBy S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle
Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper
Mar 15, 2021
-
Optimisation of the Prominent Hill Flotation CircuitBy P Woodward, T Ly, N Muhamad
OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial
Jul 15, 2013
-
Modelling of Near-Source Dust Dispersal From Surface Mine Blasting in Weak Wind and Tropical ConditionsBy S Bhandari
This paper is a step in the direction of developing a computer model of the near source dispersal of suspended particulate matter (SPM) in planetary boundary layer (PBL). Since Surface Mine blasting i
Jan 1, 2001
-
New risk assessment method for coal mine excavated slopesBy I Canbulat, J Oh, A Mcquillan, D Payne
This paper presents a new risk assessment tool for coal mine excavated slopes. This new empirical-statistical Slope Stability Assessment Methodology (SSAM) is intended for use by geotechnical engineer
Nov 30, 2018
-
Blast Monitoring and Blast Translation – Case Study of a Grade Improvement Project at the Fimiston Pit, Kalgoorlie, Western AustraliaBy M Fitzgerald
Fimiston Open Pit is operated by Kalgoorlie Consolidated Gold Mines (KCGM) as a joint venture between Barrick Gold and Newmont Mining. Over 110 years of underground mining resulted in the development
Aug 22, 2011
-
Outside Auger Hollow Claw Tipped Mechanical Sampler for CoalBy Z-Y Pi, B Zhang, S Wen
"The paper introduces the structure and work processes of outside auger hollow claw tipped mechanical sampler for coal. Twenty sets of claw tipped sampler performance tests show that: The design of i
Aug 21, 2012
-
Dredger drop impact on slope stability – Hazelwood MineBy J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4
ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du
Jun 21, 2022
-
Understanding What Constitutes the Mining Industry's 'Social Licence to Operate' in AustraliaSocietal expectations about how the industry operates and treats its people will be a key driver in the development of the Australian mining industry over the next 20 - 30 years (Moffat, Mason and Lit
Jun 1, 2010
-
Geotechnical assessment for the waste rock backfilling of the decommissioned Rum Jungle Open Cut PitBy J Hartnett, B Tarrant, A Rayner, D O’Toole, P Davies
Since 2009, the Northern Territory and Australian governments have been working under a national partnership arrangement to inform a rehabilitation plan for the former Rum Jungle uranium mine. Part of
Jul 1, 2021
-
Conversion of a Pelletising Induration Furnace from a Haematite to Magnetite FeedBy R Jones
OneSteel Whyalla’s grate-kiln-cooler pelletising plant was commissioned in 1968 processing haematite feed from the local South Middleback Ranges mining area. The existence of a magnetite resource bene
Jul 11, 2011
-
Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper OperationsBy D Kent, J Bullock, M Wilkinson
Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su
Oct 16, 2017
-
Experience with FloCEP® Slurry Flow Conditioning at Evolution Mining’s Edna May OperationBy S H. Algie, D P. Taplin, S G. Doig
"Suboptimal performance of clusters of hydrocyclones (cyclones), relative to the performance of the individual cyclones that comprise the cluster, is a common phenomenon. The primary cause is well kno
Oct 10, 2016