Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    KR process-production of hot metal on the basis of non-coking coal

    By Kepplinger W

    The KR Process is a joint development by VOEST-ALPINE, Austria and its subsidiary company KORF ENGINEERING, Germany. This new technology allows production of hot metal on the basis of non-coking

    Jan 1, 1986

  • AUSIMM
    The Use of Direct Push Methods for Delineating Spatial and Temporal Variability in Groundwater Investigations

    By P J. Clark, A W. Fisher, R G. Ford

    Site characterisation of subsurface contaminant transport is often hampered by a lack of knowledge of site heterogeneity and temporal variations in hydrogeochemistry. The use of a regional-scale data

    Jan 1, 2004

  • AUSIMM
    The Goodyear Nickel Prospect, Carnylia Hill, Western Australia

    By Gole MJ

    The Goodyear nickel prospect is located 45 km southeast of Kalgoorlie (31.04¦S, 121.80¦E) near the eastern boundary of Hampton Area - East Location 45 (Figure 1). Nickel mineralisation was discover

    Jan 1, 1996

  • AUSIMM
    A Preliminary Model of a Water-Only Cyclone and its Application to Product Quality Control

    By Spottiswood DJ, Kelly EG, Bull WR

    An empirical model of a 254mm water-only cyclone treating minus 17001im coal has been developed. The model includes the prediction of by-passing, SG50 corrected, water split and the use of a single eq

    Jan 1, 1985

  • AUSIMM
    Development in Plant Practice for the Recovery of Gold in South Africa

    The introduction of new technology into thegold-mining industry has been encouraged in recent years by increases in the price of gold andthe necessity for costs to be contained.At most new gold mines,

    Jan 1, 1984

  • AUSIMM
    Origin and Controls of Uranium Mineralization in the South Alligator Valley

    Deposition of uranium in the South Alligator river area has been influenced structurally by reverse faulting; and lithologically by carbonaceous shales and sandstones. Mineral assemblages suggest a

    Jan 1, 1968

  • AUSIMM
    Uranium Mining Operations at Ranger Northern Territory, Australia

    By Savory P. J

    Uranium mining operations commenced at Ranger mine site, Jabiru NT Australia in May 1980. The Ranger orebodies, totalling approximately 110 000 tonnes contained U305 had been indicated by airborne rad

    Jan 1, 1993

  • AUSIMM
    Nuclear Techniques for On-Line Determination of the Ash, Moisture, and Energy Content of Coal

    By Watt JS

    The ash content of coal can be determined using radioisotope X-ray techniques. A number of overseas applications of X-ray techniques are described; however these suffer from the disadvantage of eit

    Jan 1, 1978

  • AUSIMM
    Advances in Rotating Magnetic Field Separation Since 1997

    Since the announcement of early experimental work on rotating magnetic field (RMF) separation at the Sixth Mill OperatorsÆ Conference in 1997, the concept of RMF separation has been developed and test

    Jan 1, 2000

  • AUSIMM
    Risk Management of a Gold Heap Leach Project

    One of the biggest drawbacks of deciding upon a heap leach method of treating gold ore is the risk associated with the full-scale production heaps not performing as predicted by the testwork. This p

    Jan 1, 1994

  • AUSIMM
    Some Applications Of Micro Technology To The Mining Industry

    The fast rate of development in the micro technology industry is enabling computer based systems to be used in ways never considered before. Micro technology can be used to great advantage in the

    Jan 1, 1983

  • AUSIMM
    Mineral Investment-Resource Management and Policy Setting

    It is a privilege for me to participate in this vitally important discussion of The Role of Governments in the Management of Resources. The distinction of my fellow participants is evidence that t

    Jan 1, 1978

  • AUSIMM
    Western Deep Levels South - A Technical Challenge

    By Lloyd F, Bayley F. J

    The new South Mine in the Western Deep Levels complex is destined to become an ultra deep project extending to depths of 4 200 m below surface and where rock temperatures are likely to exceed 65 ¦

    Jan 1, 1988

  • AUSIMM
    Oxidative Dissolution of Nickel Sulphide Precipitated from a Nickel Refinery Waste Stream

    By Dyson NF

    Nickel sulphide precipitated from waste liquors at the Yabulu plant of Queensland Nickel Pty Ltd was pressure leached under various conditions. Leaching at 130¦C and 700 kPa of air dissolved 95 pe

    Jan 1, 1984

  • AUSIMM
    Education needs for Research and Industrial Practice in Geological Engineering

    Geological. engineering is a field of engineering practice concerned with design and construction of excavations and structures in soil and rock masses. The role of geological engineering in mining

    Jan 1, 1986

  • AUSIMM
    The Mining Industry and Career Opportunities from a Graduates Perspective

    The mining industry provides employment opportunities for individuals from a wide variety of disciplines. Solid Energy New Zealand Limited (Solid Energy) is New ZealandÆs largest coal mining company a

    Jan 1, 2007

  • AUSIMM
    New Developments to Lead Mechanical Underground Excavation Toward the Year 2000

    Drill and blast excavation in underground mining and. civil engineering projects has grad- ually given ground to mechanical boring of tun- nels, shafts and raises during the past twenty years. The us

    Jan 1, 1981

  • AUSIMM
    Virtual Hailage Trucks: Improving the Safety of Surface Mines

    By Denby B, Hollands R. Schofield D

    Surface mines are in operation worldwide, the vast majority employ large haul trucks for the transfer of material both to the outside world and around the site. The sheer size of these trucks and th

    Jan 1, 1998

  • AUSIMM
    Rise and Pillar Rill Stoping at Golden Crown Mine

    By Rogers M, Sullivan B

    Golden Crown Mine is a narrow vein gold mine producing 75000 tpa. Production has been predominantly by shrink stoping using hand held machine and airleg. Bogging from these stopes is done with Toro 15

    Jan 1, 1993

  • AUSIMM
    Technical Challenges for the Pike River Coal Project in a Remote Mining Environment

    By J McNee

    Pike River Coal Limited (PRCL) is developing the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine is being developed to extract a coking coal deposit of the Brunner S

    Jan 1, 2007