Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Economic Climate for Mining in New Zealand (01b7c1a3-c189-4335-9116-ee02100e1776)

    This paper presents a resume of the likely profitable mining areas in New Zealand. It covers the main "minerals" - gold, coal, oil and gas, ironsands, silica sands, clays, lump silica, perlite, sulphu

    Jan 1, 1990

  • AUSIMM
    A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applications

    By H Yuan, H Tian, Y Zhang, Z Wang, C Wang

    Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili

    Aug 21, 2024

  • AUSIMM
    NO2:NOx Ratios in Australian Road Tunnels

    By P Gehrke, S O’Gorman

    The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire

    Sep 17, 2014

  • AUSIMM
    The Use of the Three Dimensional Boundary Integral Equation Method for Determining Stresses at Tunnel Intersections

    By Hocking G

    For some underground structures, the use of the plane strain assumption in stress analyses may not be justified. The finite element method and photoelasticity have been used to obtain complete 3-D

    Jan 1, 1976

  • AUSIMM
    Impact of Electronic Blasting Detonators on Rock Quarry Environment, Productivity and Energy Savings

    By M Bilodeau, G Caro, R Beaudoin, D Labrie

    In 2005, Dyno Nobel Canada Inc, DynoConsult and CANMET-MMSL used their pool of expertise in blasting, ground control, open pit and underground mining, mineral processing, information technology and ap

    Jan 1, 2007

  • AUSIMM
    Life-of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine

    By R G. Moreby, S Bluhm, FávonáGlehn, C Pascoe

    Resolution Copper Mine in Arizona, USA, is planned to be a 2000 m deep panel cave mine with virgin rock temperatures exceeding 80¦C in rock with high crystalline silica content, resulting in a very ch

    Jul 1, 2013

  • AUSIMM
    Understanding Mineralisation Controls – A Case Study of the Chesney Deposit

    By J Channell, G Phillips

    "The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai

    Aug 18, 2014

  • AUSIMM
    Correlated Valuation Methodology

    By E C. Holloway

    "The financial valuation of mining assets has a number of fundamental differences to the valuation of many other asset groupings. One such difference is that typically, the greater proportion of both

    Mar 8, 2016

  • AUSIMM
    Case Study - Total Life Cycle Planning for a Greenfield Site

    Central to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl

    Jan 1, 2007

  • AUSIMM
    Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil Dump

    By R Van Laeren, G Langerak, S Fityus, K Koosmen

    Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal

    Jul 27, 2015

  • AUSIMM
    Critical Assessment of Machine Learning Algorithms as Estimation Techniques for a Polymetallic Ore Deposit

    By D Misra, R Ganguli, S Bandopadhyay

    The objective of this paper is to assess the accuracy and applicability of recent state-of-art methods such as the machine learning algorithms (MLA) for mineral resource estimation. Conventional metho

    Sep 26, 2011

  • AUSIMM
    ‘We’re Metallurgists, not Magicians!’

    By E McLean

    The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its

    Aug 8, 2011

  • AUSIMM
    Effect of Concentrate and Micropellet Addition on Iron Ore Sinter Bed Permeability

    By A M. Nyembwe, A M. Garbers-Craig, R Cromarty

    With the depletion of high-grade lump iron ore, concentrates have been identified as an alternative material for sinter making. Adding concentrates to the sinter mixture reduces sinter bed porosity an

    Jul 13, 2015

  • AUSIMM
    Machine Mining

    By Littlewood E

    We offer these notes as a practical contribution. All the arguments we advance have been tested by practical experience.In its preparation we realised that our subject was one of such importance and c

    Jan 1, 1944

  • AUSIMM
    The Golden Mile – 125 years of mining and the challenges posed for today’s mine geologist

    By M Watson, A V. Engelbrecht, E Murray-Hayden

    Whereas mine reconciliation is a well-established month-end process for most modern mining operations, the resource sector has yet to endorse uniform reporting factors against which model accuracy and

    Mar 22, 2022

  • AUSIMM
    Carbon Prefloat Improvements at Century Mine

    By D G. Rantucci

    Organic carbon is a major ore contaminant at MMG’s Century mine. This carbonaceous matter is associated with shale hosted sphalerite mineralisation. It occurs as elongated lamellae and as inclusions

    Aug 8, 2011

  • AUSIMM
    Go with the flow – managing hydrogeological staff turnover at Ernest Henry mine

    By C Hawtin, B Miller, D Ashton

    Ernest Henry mine (EHM) is an Iron oxide copper-gold sublevel cave mine located 30 minutes north of Cloncurry in North-West Queensland. The underground mine lies beneath open pit excavations, which we

    Sep 20, 2017

  • AUSIMM
    Mine Shafts – Planning, Optimising and Constructing

    By D J. Kilkenny

    Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq

    Mar 21, 2011

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    Pyrite depression at Boliden Tara using F-250 – a biopolymer

    By Y Peng, C Burns, Y Mu, R A. Lauten

    In both laboratory flotation experiments and from analysing the composition of the lead concentrate at the Boliden Tara lead-zinc mine in Ireland, it has been found that F-250 may replace cyanide as a

    Aug 29, 2018