Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
REGCHEM Database Developments and Analysis of Stream Sediment Geochemical Data for OtagoBy R L. Brathwaite, R Carver
The REGCHEM (Regional Exploration Geochemistry) database of open file mining company data, managed by GNS Science, has recently been upgraded with the compilation of additional data, especially for th
Jan 1, 2007
-
In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit ClosureBy D J. Robinson, L L. Kuhar
"Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to
Nov 15, 2016
-
Practical Sampling for Online Analysis and Composite Samples of Slurries - The Art of CompromisesIn practice a sampling solution is a compromise of many requirements: the sample should be representative; the sampling system should also be reliable, less than 95 per cent availability rest
Mar 1, 2010
-
Efficiency improvement of Jalal Abad beneficiation plant by concentrate quality enhancement and tailings recoveryBy M Lak, R Amiri, A Haratian, M Asghari, S Haji
In recent years, due to advances in designing of various magnet assemblies, a wide range of magnetic materials with different properties can be concentrated. Jalal Abad iron ore beneficiation plant, w
Nov 8, 2021
-
The Mining of J LensBy Reeves I. And Farquhar J, Pearce S
The irregular shape of the Rosebery orebody, coupled with the inconsistencies in grade over short strike lengths, has meant stoping blocks have had to be small to combat dilution and stability probl
Jan 1, 1993
-
Spatial distribution of geohazards in Western Australia and Imposed risks to tailings storage facility inventoryBy J Penman, N Turner, H Liu
This paper aims to present a snapshot of the risk profile for tailings storage facilities within Western Australia by comparing the spatial distribution of known facilities against common geohazards s
Jul 1, 2021
-
The Interaction Between Pulp Density and Frother Addition in Coal FlotationBy Roberts T, Firth B. A
A series of flotation experiments was carried out to study the interaction between the parameters of pulp density (mass per cent of solids in feed slurry) and frother addition (on the basis of solid m
Jan 1, 1984
-
Kisoro-Kabale iron ore project in south-western Uganda – unlocking a new high-grade iron ore region for exploration and developmentBy B Vietnieks, N Widmer, L White, E Tata, J Natukunda, D C. Ilouga, J P. Tyler
The Republic of Uganda aims to exploit its’ significant, un-developed iron ore resources to supply the required raw material for developing its’ iron and steel industry across all the stages of the su
Sep 18, 2023
-
Transition from owner mining to contract mining – a structured tender process using a holistic approachBy Y G. Anoman
This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most e
Jun 22, 2022
-
On the Influence of Fundamental Detonics on Blasting PracticeBy A Minchinton
With blasting, all far-field phenomena including, but not limited to, stress wave propagation, fracture, vibration and muck pile formation are intrinsically and irrevocably dependent upon near-field p
Aug 24, 2015
-
The CSA ventilation upgrade – geotechnical challenges and learningsBy T M. Brettell, D Sidea
The CSA Mine is located in Cobar, New South Wales and is operated by Glencore. Large scale underground production started from 1965, with zinc, lead, silver and copper extracted in the past. The curre
Oct 16, 2017
-
Telfer Processing Plant Upgrade - The Implementation of Additional Cleaning Capacity and the Regrinding of Copper and Pyrite ConcentratesBy D R. Seaman, B Adamson, F Burns, B A. Seaman, P Manton
The Telfer concentrator, located in the Great Sandy Desert of Western Australia, consists of a dual train gold/copper operation processing ore from one underground and, currently, two open pit mines w
Oct 29, 2012
-
"Optimisation of Mining Policy Under Different Economical Conditions Using a Combination of Non-Linear Programming and Genetic Algorithm"By A Esfahanipour, M Osanloo
Determination of cut-off grade?strategy is one of the most important stages of open pit mine planning and design. It is the parameter directly influencing the financial, technical, economic, legal, en
Sep 26, 2011
-
Lessons Learnt from Mine ExplosionsBy H R. Phillips
During the 1980s and early 1990s, the South African coal industry experienced a series of methane explosions in which well over 200 coal miners lost their lives. In addition, a fire and an explosion i
Aug 31, 2015
-
Embracing Modern Ecological Methods - Monitoring and Modelling for Mine Closure, not ComplianceBy A M. Lechner, S Arnold, M J. Gillespie, P D. Erskine, D R. Mulligan, A T. Fletcher, A Gordon
Mine ecological monitoring schemes are often conducted only to address compliance and in some cases do not have the sufficient statistical power or understanding of ecological systems to assess, quant
Jul 10, 2012
-
The use of Zimbabwean limonite-coal composite pellet as a sustainable feed for pig iron productionBy S Maritsa, E K. Chiw, S M. Masuka, ika, T Chisahwira
The challenges facing the iron and steel industry on a global scale include depletion of resources, excessive energy consumption and CO2 emissions. The demand for iron products in Zimbabwe is increasi
Sep 18, 2023
-
Elastoplastic parameter change at claystone rock mass during sliding failure at Warukin Formation, IndonesiaBy G W. Swana
Elastoplastic parameter is a parameter that describe how much materials behave elastically up to certain stress states and plastically thereafter (Hudson and Harrison, 1997). In the continuum analysis
Nov 29, 2022
-
Discovery and Geology of the McPhee Creek Iron Deposit, Northern Pilbara, Western AustraliaBy J D. Goldsworthy
The McPhee Creek bedded iron deposit is a recent discovery made by Giralia Resources NL (Giralia) in the northern Pilbara of Western Australia. The deposit lies 30 km north of the town of Nullagine al
Jul 11, 2011
-
Design and testing of high capacity surface supportBy T Roberts, S Talu
Steel wire weld mesh is a common industry standard surface support used in underground mining, traditionally installed with mining drills during the bolting cycle. As underground mining depth and stre
Nov 30, 2018
-
Sand Mining Restoration on the Swan Coastal Plain using Topsoil – Learning from Monitoring of Previous Rehabilitation AttemptsBy E J. B van Etten
This paper reports on the results of several years of monitoring rehabilitation at a silica sand mine on the Swan Coastal Plain, south of Perth. Mining here occurs below the regional watertable and le
Oct 5, 2011