Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
RI 9329 - Flywheel-Powered Shuttle CarBy John R. Bartels
This U.S. Bureau of Mines report describes the development, system by system evaluation, and preliminary surface testing of a flywheel-powered shuttle car (FPSC). The use of a self-contained flywheel-
Jan 1, 1991
-
Large-scale panel destress blast at Brunswick mineBy B. P. Simser, R. K. Brummer, A. Mortazavi, P. P. Andrieux
"A large-scale panel destress blast was fired at Brunswick mine in the fall of 1999 in order to reduce the ground stresses in a critically important neighbouring mining region. This work, sponsored by
Jan 1, 2003
-
Effect of Nano-Graphite Dispersion on the Thermal Solar Selective Absorbance of Black Chromium CoatingBy Nadia H. Rafat, Iman S. El-Mahallawi, Hussein Badr, N. Khattab, Ahmed A. Abdel-Rehim
The basic part of solar water heaters is the collector and the main functional part of the collector is the absorber layer. In this work, a commercial locally available black painting (PACEN code 1038
Mar 1, 2018
-
Location Of Seismic Events At Kusasalethu Mine Using A Layered Velocity ModelBy D. B. Rebuli
Seismic networks in deep gold mines of South Africa are often planar owing to the tabular geometry of the orebody and, therefore, the mining infrastructure. Consequently, seismic event locations are p
Jun 1, 2013
-
Assessing dilution, ore loss and profit differences from various hand-drawn dig limits compared to optimal ore-waste delineations in deposits of variable heterogeneityBy Fouad Faraj
For every blast pattern, zones of unique material types need to be classified before mining. Most material types can be summarized into different kinds of ore and waste. Blocks generated from blasthol
Oct 1, 2024
-
Annual Financial Statements - Report Of The Independent AuditorsTo the members of The South African Institute of Mining and Metallurgy We have audited the annual financial statements set out on pages 269 to 276. These financial statements are the responsibility
Jan 1, 1999
-
Excerpts From Drilled Shafts: Construction Procedures And Design Methods - General ApproachBy L. C. Reese
? Good construction and inspection presumed. ? Capacity-computation factors are independent of construction method. ? To account for variable or uncertain site conditions, anticipated construc
Jan 1, 1988
-
Project financing and the mineral development agreementBy D Macdougall, J Otto
The financing of large mining projects in developing countries is often achieved, at least in part, by limited-recourse financing methods. Financing agreements are affected by the basic accord that is
Aug 1, 1994
-
Measuring and Analysing Percussive Pulses to Extend Depth in Top-hole Percussion DrillingBy Gary Cavanough, Stuart Addinell, Hector Parra
Drilling deep, straight, accurate holes in hard rock to achieve efficient blasting is a challenge for the mining/quarrying industries with short holes normally drilled using “top hole hammer” (THH) an
Jan 1, 2013
-
Backfilling Of Cavities Resulting From Borehole Mining - ObjectiveAs part of the overall development of a borehole mining system -develop backfilling techniques to reduce possible damage to the environment caused by either the cavities or the piles of sand tailings
Jan 1, 1981
-
Impact Of Environmental Regulations On Pile Foundation Design And Construction Using Diesel HammersBy R. D. Short
Environmental regulations for noise and air pollution are directly affecting the type of equipment and construction techniques being utilized for pile driving construction using diesel hammers in Cali
Jan 1, 1989
-
High Throughput of Cathode Copper by New Anode Body Press Machine at Onahama No.1,2 TankhouseBy K. Iwami, K. Abe
"Onahama Smelter and Refinery has been operated-since 1965 arid currently produces 243,000 metric tons per year of cathode copper. The Onahama tankhouse consists of conventional-type No.1 and 2 tankho
Jan 1, 2000
-
Transition and optimization of the Henderson mine ventilation systemBy C. Rutter, N. SHEA, K. KOLOBE
Henderson Mine’s primary production transitioned from the main portion of the 7700 level to the 7210 main panel in 2005. On the 7700 level, the southwest (SW) panel was brought into production in 2014
-
OFR-105-78 Personal Alpha AlarmBy Donald B. Lindsay
A new concept was proposed for a personal warning device for use by miners who may be exposed to health hazards from inhalation of alpha-emitting radionuclides, especially radon-222 and its short-live
Jan 1, 1978
-
RI 7081 Liquidus Temperatures Of Titaniferous Slags (In Three Parts) 1. TiO2-Al2O3-SiO2-CaO-MgOBy Wesley T. Holmes
This report describes the first phase of an investigation aimed at obtaining a wider knowledge of the problems involved in smelting titaniferous magnetites. Liquidus temperature measurements were made
Jan 1, 1968
-
OFR-125-85 Development Of Modular Irrigation Systems For Reclaimed Strip Mined Lands Incorporating Mycorrhiza Inoculations TrialsBy A. Uiga
The U.S. Bureau of Mines funded a project which addressed objectives concerning irrigation of native plants and inoculation of native plants with vesicular-arbuscular mycorrhizal (VAM) fungi. The spec
Jan 1, 1984
-
RI 8817 - An Analysis of 6X19 Classification Wire Hoist RopeBy R. R. Lowery
An analysis of three 1-1/4-diam manufactured wire ropes of 6x19 classification was done to identify and describe reference conditions of new rope. Reference condition is of value when examining tested
Jan 1, 1983
-
Better Gasoline for Postwar EnginesBy George A. Miller
AMERICANS like engines, but more than anything they like powerful engines, and next to that they want them quiet, silent, smooth; perhaps a slight purr might be permitted, but they must not knock. To
Jan 1, 1945
-
Critical Chain Project Management Accelerates Equipment Shutdown Management Improvement Process - Preprint 09-051By C. Asgaard
Asset availability has been a longstanding objective in mining and mineral processing plants around the world. Enormous resources in both dollars and manpower are invested in improvement efforts to ac
Jan 1, 2009
-
OFR-177(2)-83 Electrical-Shock Prevention - Volume II - Ground-Fault Interrupting DevicesBy L. A. Morely
Volume II of the final report concerns the application of sensitive ground-fault interrupters (GFIs) to ac utilization circuits in U.S. mines The main concepts examined are shock prevention and method
Jan 1, 1982