Search Documents

  • SME-ICGCM
    The Effects of Reduced Annulus in Roof Bolting Performance

    By Stephen Tadolini

    The annulus thickness, for bolts anchored with resin, effects the systems final performance. Recent developments in the manufacturing process of these support systems, coupled with improved resin char

    Jan 1, 1998

  • AIME
    Phosphate Rock Industry of Foreign Countries

    By F. C. Noyes

    DAME Nature was in a generous mood when she distributed widely over the face of the globe numerous deposits of phosphate rock from which man can make phosphatic festiIizer to replace the phosphate re-

    Jan 1, 1944

  • CIM
    The Importance of Structural Geological Mapping and Slope Monitoring in Open Pit Slope Stability

    By Nick D. Rose

    The importance of structural geology in open pit slope stability is overlooked in many mining operations due to pressures to cut costs and minimize mine personnel. As a result, mine geology staff are

    May 1, 2002

  • SME
    Development Of An Energy-Balance Model To Predict The Economic Impact Of Installing A Tailings Wash Thickener At The Fort Knox Mine, Fairbanks, Alaska

    By J. T. Hollow

    The Fort Knox Mine is located in Alaska?s interior, where the average ambient air temperatures range from -24°C (-11°F) in January to 16°C (61°F) in July. The mill processes a free-milling gold ore ut

    Jan 1, 2007

  • AIME
    Coal Steps Forward Again

    By Ernest M. Spokes

    For bituminous and lignite coals the economic picture continued to improve as it has each year since the low of 1961, with production at 480 mil- lion tons in 1964 compared with 1963's 459 millio

    Jan 2, 1965

  • IOM3
    Long-team open-pit production scheduling through dynamic phase-bench sequencing

    By Qing Wang

    In this method the state of an open-pit mine is represented by the number of benches that are mined in each predesigned mining phase (or pushback). Consequently, a specific mining schedule can be repr

    Jul 1, 1996

  • SME
    Cobalt Recovery From Copper Solvent Extraction Raffinate Using Ion Exchange Resins

    By M. Rodgers

    Dow Water & Process Solutions (DW&PS) was approached by ASARCO Inc. to attempt to recover cobalt and copper from their copper solvent extraction (SX) raffinate. Cobalt is added to many copper electrow

    Jan 1, 2010

  • ISEE
    Journal: 100 Years / THE ST. MARY’S PARK TUNNEL, N.Y.C. & H.R.R.R.

    By Robert Hopler

    As a part of the depression and rectification work on the Port Morris branch of the Harlem Division of the New York Central & Hudson River Railroad, a short tunnel is being driven under St. Mary’s Par

    Jan 1, 2006

  • SME
    APM Tunnels at Phoenix Sky Harbor International Airport

    By David M. Jurich, Randy J. Essex, Alex de Aboitiz

    An Automated People Mover (APM) transit system is planned for the growing Phoenix Sky Harbor International Airport. The APM will improve passenger movements between the terminals, and provide a link t

    Jan 1, 2005

  • SAIMM
    Pit Slope Design And Risk ? A View Of The Current State Of The Art

    By T D. Sullivan

    Risk lies at the heart of all mining and nowhere more so than in pit slope design. Mining is principally about two areas of risk; safety and economics. This paper addresses the main elements of pit

    Jan 1, 2006

  • NIOSH
    IC 6348 Method And Cost Of Mining Hematite At The Eureka-Asteroid Mine On The Gogebic Range, Gogebic County, Mich. ? Introduction

    By O. M. Schaus

    The following is a description of the methods employed at the Eureka-Asteroid mine, which is situated on the Gogebic range, at Ramsey, Mich. The mime is operated by the Castile Mining Co. under the di

    Jan 1, 1930

  • AIME
    Notes on the History of Porcupine

    By Louis Huntoon

    HISTORY of the Porcupine area has been pub-lished in detail by the Ontario Bureau. of Mines in several issues of its annual reports. An. interesting volume could be written on: this topic; especially

    Jan 8, 1923

  • NIOSH
    NIOSH Mine Fire Research In The United States

    By Michael A. Trevits

    During the time period from 1990-2007, there were 1601 reportable fires that occurred in the U.S. mining industry (an average of 89 fires per year). The leading causes of U.S. mine fires include flam

    Jan 1, 2010

  • CIM
    The Engineer and the Diamond Drill in Northern Ontario

    By C. H. Hopper

    DIAMOND drills have played an important part in the development of mines for many years. Recently. they have also entered the production field arid the use of diamond drills m the primary breaking of

    Jan 1, 1943

  • IOM3
    Three-dimensional modelling of fill drainage in mine stopes

    By L. T. Isaacs, W. H. Traves

    A numerical model for analysing the drainage of fill in mine stopes has been described. The model can be used to analyse the process of fill drainage in existing and proposed mine stopes. The validity

    May 1, 1991

  • SME-ICGCM
    Rock Mechanics Property Data Bank For Coal Measure Strata

    By G. C. Sun

    Rock mechanics properties, i.e. uniaxial and triaxial compressive strength, indirect tensile strength shear strength, Young's modulus, and poisson's ratio were collected for coal and related

    Jan 1, 1993

  • AUSIMM
    Real-Time Integration of Mining and Metallurgical Information for Efficient Use of Energy and Water

    Real-Time Integration of Mining and Metallurgical Information for Efficient Use of Energy and Water

    Sep 13, 2010

  • SAIMM
    Effect Of Residual Tectonic Stresses On Roadway Stability In An Underground Coal Mine

    By B. Unver

    Effective strata control is a prerequisite for maintaining an efficient mining operation. If the strata in the vicinity of an opening are not controlled effectively, it is impossible to perform a safe

    Jan 1, 1999

  • SAIMM
    Teetered Bed Separator And Its Effect On Navigation Plant Fines Qualities

    By R Ratlou

    Increased contamination due to sand in spiral feed has had a negative effect on the efficiency of spiral concentrators at Navigation Plant. The no. 1 seam at Kromdraai opencast, which was previousl

    Jan 1, 2006

  • SME
    Evinos-Mornos Tunnel – Greece Construction of a 30 Km Long Hydraulic Tunnel in Less Than Three Years Under the Most Adverse Geological Conditions

    By Remo Grandori, Manfred Jaeger, Fabrizio Antonini, Luis Vigl

    The EVINOS-MORNOS tunnel project with its 30 km of length is one of the longest hydraulic tunnel in the world realised with TBM method. The adverse geological conditions, the high cover and the sho

    Jan 1, 1995