Search Documents

  • AUSIMM
    Performance of the Coal Mine Openings and Pillars in Anisotropic Stress Field

    The stability of parallel underground coal mine galleries and pillars have been investigated using two- and three-dimensional (3D) numerical stress analysis. Anisotropic horizontal in situ stresses an

    Dec 6, 2010

  • AUSIMM
    Technical Note on Recovery of Manganese from Low Manganese Content Ferromanganese Slag

    By Rao P. K, Sahoo P. K

    The main constituents of ferromanganese slags are silicates of Mn, Ca and AI. Factors affecting the recovery of manganese from a low manganese content ferromanganese slag (about 16 per cent MnO) durin

    Jan 1, 1979

  • NIOSH
    Bulletin 3 The Coke Industry Of The United States As Related To The Foundry

    By Joseph A. Holmes

    The investigations carried on at the fuel-testing plant of the United States Geological Survey at St. Louis in 1904-1907 included tests of the steaming and gas-producing qualities of many coals and of

    Jan 1, 1910

  • SME
    Social, Economic, And Planning Impacts Of Rapid Excavation And Tunneling Technology

    By W. L. Garrison

    Improvements continue to be made in rapid excavation and tunneling technology. There are several ways to examine the impacts of such improvements. The most common procedure is to monitor current devel

    Jan 1, 1974

  • AUSIMM
    Computer Usage for Grade Control and Short Term Planning

    Computer applications are ideally suited to the day to day operations of grade control and short term planning on a mine site. By refining this part of the operation there is scope to increase prof

    Jan 1, 1989

  • AUSIMM
    Electrolytic Parting of Gold and Silver, At the Works of the Broken Hill Associated Smelters Pty. Ltd., Port Pirie.,

    By Met B. E

    During the operation of the Parkes process of desilverising, and in the earlier days of the continuous process, gold and silver were removed separately from softened lead bullion. Gold was removed in

    Jan 1, 1937

  • SAIMM
    Determining Settlement Rates and Surface Stability Using In Situ Density of Backfill as a Proxy for Displacement

    By D. Fenn, A. du Kanda, D. Dukhan

    "SynopsisGibb Consulting Services was contracted by Eskom Line Engineering Services to conduct an investigation to determine the absolute displacement to date and infer the current rate of displacemen

    Jan 1, 2015

  • CIM
    Geostatistical simulation of optimum mining elevations for nickel laterite deposits (b9d9907f-58af-4f31-a4f0-796631528f37)

    By J. A. McLennan, J. M. Ortiz

    Nickel laterite deposits are typically formed from tropically weathered mafic-to-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular doz

    Jan 1, 2006

  • SME
    Geotechnical Considerations No. 7 Subway Line Extension Project in New York City

    By P. K. Das, S. K. Singh, C. C. Chang, E. C. Wang, R. B. Roberts

    As part of the New York City’s redevelopment of the far west side of mid-town Manhattan, this project will add 1.5 miles of twin bored tunnel to No. 7 Subway Line. The proposed alignment extending fro

    Jan 1, 2005

  • NIOSH
  • NIOSH
    OFR-16-74 Proceedings Of Thru-The-Earth Electromagnetics Workshop - Objectives And Constraints Of Through-The-Earth Electromagnetic Communication Systems

    By Howard E. Parkinson

    In 1969, new coal mine health and safety legislation was enacted in the United States. As a result of this legislation, the Department of Interior, Bureau of Mines has carried out communications resea

    Jan 1, 1973

  • SAIMM
    Cyanidation Of Reef And Surface Gold Ores ? Synopsis

    By L. Rademan

    The kinetic leaching behaviour of a low-grade surface gold ore and a high-grade reef ore were evaluated to determine the achievable gold recovery from these ores and particularly mixtures of these ore

    Jan 1, 2012

  • SME
    Novel Passive Technology For Entrained Air Measurement In Pipes And Gas Holdup Measurements In Column Cells

    By C. Keefe, O&apos

    Measurements of the quantity of entrained air within processes have challenged instrumentation developers for years. This is particularly true in the unique and demanding operating environment and ap

    Jan 1, 2008

  • ISEE
    It Felt like an Earthquake

    By David Ziegler, John Babcock, Gregory Poole

    On December 9, 2003 at 3:59 PM EST an earthquake with a 4.5 magnitude occurred in central Virginia. According to a survey on the US Geological Survey website, this quake was felt as far away as Bridge

    Jan 1, 2005

  • SME-ICGCM
    Coal Pillar Design Formulae Review and Analysis

    By Xinzhi Du

    Coal strength is essential to analyze the stability of excavation in coal. It is well known that the strength of coal tested in the laboratory is size-dependent, and different size specimens will prod

    Jan 1, 2008

  • IIMP
    Gestión de riesgos

    By Juan Antonio Huamán Fernández

    De acuerdo al estudio que realizó la Dirección General de Minería del Ministerio de Energía y Minas en el Perú, las estadísticas de accidentes fatales reportadas a escala nacional en el 2002 indican q

    Jul 31, 2003

  • DFI
    Structural Seismic Design Of Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California - 1 Assessment Of The Existing Bridge

    By Roy M. Schnabel

    The Fashion Island Boulevard Bridge over the Marina Lagoon in San Mateo, California is an eight span precast, prestressed concrete girder bridge. It is approximately 495 feet in length and 61 feet in

    Jan 1, 1993

  • CIM
    Real-Time Data Reconciliation for Process Control

    By Éric Poulin, Simon Gariépy, Mario Paredes Malca

    "While the design of a control strategy depends on the available process knowledge, its implementation depends on the available process information. On-line chemical analyzers are today widely spread

    Jan 1, 2006

  • SME
    Lyon–Turin Long and Deep Railway Tunnel Project

    By P. Fauvel, V. Nasri

    In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over

    Jan 1, 2005

  • NIOSH
    IC 7909 Mining Methods And Cost. Iowa Gypsum Deposits ? Summary

    By L. G. Marshall

    Gypsum mining and processing has been one of the principal industries in Iowa for more than 75 years. For most of that period, Iowa has ranked among the five leading States in the production of crude

    Jan 1, 1959