Search Documents

  • AUSIMM
    International Marketing - The Challenges

    INTRODUCTION ò World coal production, Exporters and Importers òNew Zealand Exports, Markets and Products ò Types of Markets and Price Setting ò Bench Mark Prices and Exchange Rate ò Transport ò Intern

    Jan 1, 1996

  • DFI
    Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - Synopsis

    By N. S. Yet

    This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C

    Jan 1, 2000

  • CIM
    Mineral Possibilities of Yukon Territory

    By Aaro E. Aho

    Yukon, one of the most potentially accessible, relatively undeveloped, regions of Canada, has major mineral possibilities. The Klondike placer gold fields and the Mayo silver-lead ?district are the so

    Jan 1, 1958

  • SME
    Seismic Design Evaluation of the Bay Tunnel

    By Yiming Sun

    The 5-mile long Bay Tunnel is a major water supply facility to be constructed under the San Francisco Bay and adjacent marshlands between the San Andreas Fault to the west and the Hayward Fault to the

    Jan 1, 2008

  • NIOSH
    RI 3207 Study of Falls of Roof and Coal, Rock Springs District, Sweetwater County WY

    By H. Tomlinson

    "INTR0DUCTIONThis publication is a third of a series devoted to falls of roof and coal in coal mines of the Western States. It gives the results of examinations of the mines of the Rock Springs coal D

    May 1, 1933

  • DFI
    A Case Study Of Passive Piles Failure In Open Excavation

    By S. T. Kok

    This paper presents a case study in West Malaysia for passive piles failure in very soft marine clay in open excavation. In this particular case, the thickness of the very soft marine clay ranges from

    Jan 1, 2009

  • CIM
    Metal Mine Ventilation (5a66f77a-e32a-4b69-828a-81ebc3b32b9e)

    By D. Harrington

    Ventilation of underground workings consists in establishment of such control of air currents that the underground workers may work in safety, with maximum comfort and efficiency, and without impairme

    Jan 1, 1933

  • AUSIMM
    Effects of High Pressure Grinding Rolls on Platinum-Bearing Ores and the Flotation Response as Compared to the Conventional Ball Mill

    Effects of High Pressure Grinding Rolls on Platinum-Bearing Ores and the Flotation Response as Compared to the Conventional Ball Mill Three major PGM ore types from the Bushveld Complex of South Afri

    Sep 13, 2010

  • DFI
    A Case Study Supporting The Need For A Rational Method For Design And Installation Of Vibratory Driven Piles

    By Franklin M. Grynkewicz

    The subject of bearing pile performance installed by vibratory hammers has been a matter of increasing study and continued controversy. A recent case study from a major bridge replacement project is d

    Jan 1, 1991

  • SME-ICGCM
    Coal Pillar Strength Based On The Ground Reaction Curve - A New Approach

    By Kazem Oraee

    In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i

    Jan 1, 2009

  • SAIMM
    A Review of Work-Integrated Learning in South African Mining Engineering Universities

    By L. A. Maseko

    "As part of the mining engineering curriculum, students are required to be placed in industry for vacation work or work-integrated learning (WIL). In this paper we review work-based placement as done

    Dec 1, 2018

  • CIM
    Speciation of Sorbed Gold

    By Stephen L. Chryssoulis, Stamen Dimov

    "Preg-robbing has been known for many years, where increased losses are suffered because dissolved gold is removed from solution by adsorption onto carbonaceous matter. In direct cyanidation circuits

    Jan 1, 2004

  • AIME
    Instrumentation, Automation, and Process Control (666a6871-2a0b-4569-b186-7269b1528cd0)

    By Kenneth K. Humphreys

    INTRODUCTION What is automation? Why automate? Webster's New Collegiate Dictionary defines automation as "the automatically controlled operation of an apparatus, process, or system by mechani

    Jan 1, 1979

  • AUSIMM
    Development in Modern Refractories Practice and Application

    A general outline of the significant features in the quality and manufacture of the more common refractories is given. Where possible, linkage between quality development and control and service appli

    Jan 1, 1961

  • SME
    Transbay Transit Center - Keeping DTX on Track

    By Derek J. Penrice

    A critical element of the Transbay Transit Center Program, the Caltrain Downtown Extension (DTX) will extend commuter rail service into downtown San Francisco and accommodate future statewide high-spe

    Jan 1, 2008

  • NIOSH
    RI 6636 Stainless Steel Gadolinium Alloys

    By M. Copeland

    Phase relations of gadolinium alloyed, up to 40 weight-percent (wt pct), with AISI 304-type stainless steel were established. Body-and face-centered cubic iron-rich solid solution phases and several i

    Jan 1, 1965

  • NIOSH
    Use Of The Mining Rock Mass Rating (MRMR) Classification: Industry Experience

    By Gabriel S. Esterhuizen, Jarek Jakubec

    In 2000, Laubscher’s Mining Rock Mass Rating (MRMR) classification system was updated and published. The new system brought a few fundamental changes that were in direct response to the challenges and

    Jan 5, 2007

  • AUSIMM
    Occurrences and Morphology of Fes2 at the Golden Cross Mine, Warni, New Zealand

    By J L. Maule, S J. Mathews, K A. Rodgers

    Gold and Silver bearing epithermal veins of the Golden Cross deposit are hosted in Miocene and Pliocene calc-alkaline volcanics occurring 8 km northwest of Waihi at the southern e

    Jan 1, 1994

  • SME
    Coping with Boulders in Soft Ground TBM Tunneling

    By Peter B. Dowden, Robert A. Robinson

    Boulders, frequently found in tunnels excavated through soils, can pose major problems for full face TBMs in terms of slowing or halting the tunnel advance, cutter damage, and abrasive wear. The paper

    Jan 1, 2001

  • SME
    Design and Construction of the Bored, Two-Pass Niagara Water Diversion Tunnel

    By Russel Delmar

    Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope

    Jan 1, 2008