Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Methods Of Controlling Thick And Strong Roof In Longwall Mining

    By Deren Zhu

    The principle of roof control in longwall mining is to control main roof fractures so as to reduce roof weighting, plus reasonable and effective design of supports to reduce the convergence and premat

    Jan 1, 1990

  • SME-ICGCM
    Stereological Sampling And Analysis For Characterizing Discontinuous Rock Masses

    By J. K. Owens

    As part of a larger research effort focused on ground control, the U.S. Bureau of Mines is currently evaluating the effectiveness of using stereological analysis for characterizing mine roof strata. I

    Jan 1, 1994

  • SME-ICGCM
    Numerical Modeling of the Pillar Confinement with Backfilling Material in Room?and?Pillar Coal Mining

    By Andre Zingano

    It is known that the backfilling confinement increases the pillar strength and also reduces the rib lateral displacement. With backfilling, it is possible to increase the room-and-pillar mining recove

    Jan 1, 2011

  • SME-ICGCM
    Rockbolted Support of Retreat Longwall Gateroads at 1000m Depth: A Case History

    By Karl Brandt

    Longwall panel 580 has recently been retreated in the Zollverein 1/2 seam at a depth of approximately 1000m at Auguste Victoria mine with rectangular rockbolted roadways used for both the maingate and

    Jan 1, 2002

  • SME-ICGCM
    Stepwise Support Technology For Extremely Soft Rock Roadway And Its Engineering Application

    By Xinchuan Xia

    Based on the stepwise strain features and the strength reduction law of the surrounding rock in extremely softrock roadway, this paper proposes a dynamic supporting principle. A new kind of stepwise r

    Jan 1, 2000

  • SME-ICGCM
    Prediction Of Longwall Support Loading At Southern Colliery, Queensland (a27f315c-1e91-4c85-b61a-2de1eb8e0d0f)

    Roof conditions at Southern Colliery, the second Iongwall mine to be established at German Creek, were found to be much stronger and more massive than at the earlier longwall mine on the lease. Invest

    Jan 1, 1992

  • SME-ICGCM
    Load Transfer Mechanics In Fully-Grouted Roof Bolts

    By Maynard O. Serbousek

    The mechanics of load transfer of fully-grouted roof bolts in coal mines has been investigated in laboratory and analytical studies. The purpose of this research is to increase the understanding and b

    Jan 1, 1984

  • SME-ICGCM
    Investigation of Seismicity Near Appin, NSW, and its Association With Mining, Geology, and Tectonics

    By Vasundhara

    A chance detection of a seismic event of unexplained origin in the mining district of Appin in New South Wales. Australia, led to a detailed investigation of recording and analyzing seismic events occ

    Jan 1, 2001

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    Stability And Stress Evaluation In Mines Using In-Seam Seismic Methods

    By E. M. Williams

    The U.S. Bureau of Mines is investigating the use of in-seam seismic methods to monitor stress-induced changes in coal near the working face of longwall mines. Seismic surveys performed through a long

    Jan 1, 1994

  • SME-ICGCM
    Case Studies Using Mine-Wide Monitoring Systems For Geotechnical Evaluations

    By John P. Dunford

    U.S. Bureau of Mines researchers are investigating the ability of mine-wide monitoring systems already in place at many coal operations to provide a direct link between geotechnical instruments and th

    Jan 1, 1993

  • SME-ICGCM
    Mobile Roof Support For Retreat Mining

    By H. Gene Wilson

    Mobile Roof Supports (MRS) look similar to a longwall shield on crawler tracks. The MRS units offer a safe, productive method of extracting the 40% to 60% product left normally unrecovered in room and

    Jan 1, 1990

  • SME-ICGCM
    Structure, Strength And Relaxation Of Interbuden For Input Into Highwall Mining Design In The Baralaba Coal Measures Of Queensland, Australia

    By Bret E. Leisemann

    The geomechanical environment in which highwall mining must operate represents a hybrid between surface and underground operations. Mine design must take into consideration the complexities associated

    Jan 1, 1993

  • SME-ICGCM
    Extended Cut Out Distances In Continuous Miner Sections In South African Collieries

    By Ismet Canbulat

    The cut out distance in the continuous miner sections in South African collieries is limited to 12 m. However, this distance can be extended to 24 m by the permission of the Department of Mineral and

    Jan 1, 2000

  • SME-ICGCM
    Probabilistic Stability Analysis Of Embankments And Slopes (1006fe25-ccb9-48a0-86b2-57e4779408ba)

    By Rossen A. Halatchev

    This study introduces a new probabilistic approach to seismic stability analysis of embankments and slopes. The approach is based on Sarma's solution, which is modified through presentation of th

    Jan 1, 1992

  • SME-ICGCM
    New developments with the coal mine roof rating (7c278b2d-cc1e-4949-9bd2-643d1af010e5)

    By Chris Mark

    The Coal Mine Root Rating (CMRR) was first presented at this Conference nine years ago. Since Its Introduction, the CMRR has been incorporated into many aspects of mine planning. including longwall pi

    Jan 1, 2002

  • SME-ICGCM
    Assessment of the Dynamic Loads Effect on Underground Mines Supports

    By Kazem Oraee-Mirzamani

    Blasting operations generate seismic effects in underground mines. These effects apply additional dynamic loads on the support system, which should bear both static and dynamic loads. Static loads are

    Jan 1, 2011

  • SME-ICGCM
    Three-Dimensional Analysis Of Mine Dump Point Stability

    By Radoslaw L. Michalowski

    The operation of mobile mining equipment near the crest of stockpiles and wastedumps often results in localized slope failures. The Bureau of Mines has developed a computer code based on a rigorous li

    Jan 1, 1990

  • SME-ICGCM
    A Computer Simulation Of Breakage Of The Main Roof In Longwall Mining

    By Deren Zhu

    Based on the results of field observation and physical model analyses, a computer simulation method, FEAEBP, has been developed for simulating the breakage of the main roof by considering it as a Kirc

    Jan 1, 1988

  • SME-ICGCM
    Prediction of Inter-Strata Movements Above Longwall Faces (bade68bf-520f-401d-9d3a-43ba4395e61a)

    By Neil Styler

    This paper presents an analysis of measurements of inter-burden de- formations above six longwall faces. An attempt is made to demonstrate some correlation between the movements at the various sites,

    Jan 1, 1984