Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Case Study of the Effect of Stratigraphic Location on Roof Stability in Rock Salt

    By Chris T. Franke

    The Waste Isolation Pilot Plant is a deep underground facility mined in bedded salt interspersed with persistent clay inter- beds. The clay seams delineate beams of salt above and below the excavation

    Jan 1, 1997

  • SME-ICGCM
    Analysis of Monitored Ground Support and Rock Mass Response in a Longwall Tailgate Entry

    By B. Tulu, D. Gearhart

    A comprehensive monitoring program was conducted to measure the rock mass displacements, support response, and stress changes at a longwall tailgate entry in West Virginia. Monitoring was initiated a

    Jan 1, 2017

  • SME-ICGCM
    Support Strategy for Tailgates below Gob Edge Using Split-Level Longwall Panel Layout for Deep Inclined Coal Seams

    By Pengfei Wang, Guorui Feng

    With increase of cover depth, dynamic incidents, such as large gateroad convergences and coal bursts, are frequently encountered when mining deep longwall panels. It would be more adverse due to large

    Jan 1, 2018

  • SME-ICGCM
    The Influence Of Certain Geologic And Geotechnical Factors On Coal Mine Floor Stability - A Case Study - Introduction

    By Robert C. Speck

    Floor heave or deformation of the mine floor into the mine opening is a problem which has plagued coal mines in this country and others. In mining areas where room and pillar mining is practiced, floo

    Jan 1, 1981

  • SME-ICGCM
    The Impact Of Three Longwall Coal Mines On Streamflow In The Appalachian Coalfield

    By Denise Y. Dizon

    The objectives of this study were to document the hydrologic impacts of longwall mining on streams, identify the factors affecting the extent of stream dewatering, and develop empirical trends to pred

    Jan 1, 1990

  • SME-ICGCM
    Numerical Model Calibration for Simulating Coal Ribs (da729951-bd49-415c-b364-03a4e38bfd9c)

    By Michael Murphy, Khaled M. Mohamed, Berk Tulu

    "Failures of coal ribs are major hazards in underground coal mines. For the period of 2010 to 2014, rib falls were the leading cause of groundfall fatalities and accounted for 35% of all groundfall-re

    Jan 1, 2016

  • SME-ICGCM
    Investigation of the Influence of Mining with Caving on Deformation of Roadway Located in Close Proximity of Longwall Panel

    By Andrzej Walentek

    In polish coal mining due to specificity of seams lying the multiple extraction is used. In this kind of mining, it is essential to take into account all geological and mining conditions which have an

    Jan 1, 2013

  • SME-ICGCM
    Barrier Pillar Design for Safe and Productive Longwall Mining

    By Stephen C. Tadolini

    Effective barrier pillar design is an essential component for safe and productive underground coal mining. Barrier pillar design methodologies that incorporate sound engineering judgment have been use

    Jan 1, 2013

  • SME-ICGCM
    How to Mitigate Coal Mine Bumps Through Understanding of the Violent Failure of Coal Specimens

    By Gamal Rashed

    This research is divided into two parts: the first part of this research focuses on understanding coal mine bump mechanisms, and the second part focuses on mitigating the violent failure associated wi

    Jan 1, 2013

  • SME-ICGCM
    Evaluation of Seismic Potential in a Longwall Mine with Massive Sandstone Roof under Deep Overburden

    By Joe Wickline, Mark A. Van Dyke, Wen H. Su

    "Geological factors and mine design contribute to mining-induced seismic activity, and this is especially true in longwall mining. Massive rock units are a key cause of seismic activity due to catastr

    Jan 1, 2017

  • SME-ICGCM
    Influence of Mine Layout, Mining Method, and Geology on Down?Dip Coal Barrier Performance at the Solar No. 7 Mine

    By Anthony T. Iannacchione

    The Solar No. 7 and Solar No. 10 mines were designed to prevent mine waters from directly discharging to the surface. In January of 2004, a discharge occurred as the Solar No. 7 mine was in its final

    Jan 1, 2013

  • SME-ICGCM
    Investigation of Pillar Loading Considerations in Determination of Pillar Stability Factors for Longwall Gateroad Design

    By Heather E. Lawson

    Recent field data providing measured pillar loading from a deep western mine revealed that an increased load transfer distance existed compared to expected values (Larson et al., 2012). Additionally,

    Jan 1, 2013

  • SME-ICGCM
    Ground Control of Longwall Top–Coal Caving Faces within Thick Coal Seams

    By Jinwang Zhang, Zhaohui Wang, Jiachen Wang

    "Thick coal seams (seam height larger than 3.5 m) account for a large portion of the proven coal reserves of China, and underground thick coal seam mining provides about 50% of the Chinese annual coal

    Jan 1, 2017

  • SME-ICGCM
    The Role Of Engineering And Geology In Analyzing Ground Control Conditions

    By David A. Newman

    Severe roof control problems have plagued a West Virginia underground mine since its initial development in the late 1970's. Adverse roof conditions in the Eastern portion of the reserve result f

    Jan 1, 1999

  • SME-ICGCM
    Roklok Polyurethane Binder: A Chemical Injection System For The Consolidation Of Severe In-Mine Ground Conditions

    By Kirk W. McCabe

    RokLok binder is a two-component polyurethane system consisting of a polymeric isocyanate (Component A) and a polyol resin (Component B). The two chemicals are mixed and injected into the mine rock un

    Jan 1, 1981

  • SME-ICGCM
    Evolution Characteristics of Pressure-Arch in Disturbed Overburden During Shallow Horizontal Coal Mining

    By Shuren Wang, Wenbing Guo, Paul C. Hagan, Yanhai Zhao

    "The overlying strata is often destroyed in large scale during shallow coal seam mining, and the sliding instability of the caved roof seriously threatens the safety of the mining field. The typical s

    Jan 1, 2018

  • SME-ICGCM
    How To Cope With Cutter Roof Problem (e6639bdb-2d11-4a70-a3df-8a3a479f7b3e)

    By A. Wahab Khair

    This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the advance

    Jan 1, 1992

  • SME-ICGCM
    3-D Discontinuum Numerical Modeling of Rock Mass Stability Investigations Due to Ore Extraction and Backfilling, and Subsidence Estimation for an Underground Mine

    By Srisharan Shreedharan, Gang Huang, Hongqing Song, Sijing Cai, Pinnaduwa H. S. W. Kulatilake

    "Subsidence prediction due to ore extraction and backfilling during open stoping operations for an underground iron mine in China is reported in this paper. Geologic complexities including faults and

    Jan 1, 2016

  • SME-ICGCM
    A Roof Model and Its Application in Solid Backfilling Mining

    By Meng Xiao, Peng Huang, Lizin Lan, Feng Ju, Shuai Guo

    "Through changing the axial load on backfilling material compaction test to reflect different overlying strata pressure on backfilling material, the stress-strain relations in the compaction process o

    Jan 1, 2016

  • SME-ICGCM
    Design Trade-Off For Angle Roof Drilling

    By James H. Fletcher

    Much data and experience has been accumulated, especially in the last 5 or 6 years, to show that modern roof trusses, both of the Birmingham type and the bolt-and-channel type, perform well to support

    Jan 1, 1982