Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Stress Environment of Entry Driven Along Gob-Side through Numerical Simulation Incorporating the Angle of Break

    By Pengfei Wang, Guorui Feng

    "The angle of break is the acute angle created by the coal seam bedding plane and caving line formed by roof strata movement after extraction of a longwall panel. It has a significant influence on str

    Jan 1, 2018

  • SME-ICGCM
    Effect of High Horizontal Stress on Coal Mine Entry Intersection Stability

    By K. Hanna

    This manuscript describes an extensive ground control study at the Inland Steel No. 2 Mine near McLeansboro, IL, conducted by the U.S. Department of the Interior's Bureau of Mines (USEM) in coope

    Jan 1, 1986

  • SME-ICGCM
    System Behavior of Roof Bolt Systems with Varying Bearing Plate I Angle Compensating Device Combinations

    By Gregory E. Smith

    "Tensionable headed roof bolt systems are common in the U.S. mining industry. In the last 15 years or so, they have made a comeback as a hybrid system where a mechanical anchor is used in conjunction

    Jan 1, 2016

  • SME-ICGCM
    Multiple–seam mining in the United States: An Analysis of Multiple Seam Stability in Northern Appalachian Coal Mines with Minimal Depth of Cover and Interburden

    By Michael J. Castner

    "INTRODUCTIONMultiple-seam mining is an ever growing concern for engineers and mine management in every portion of the mining industry and is especially true for coal mining operations. The goal of th

    Jan 1, 2015

  • SME-ICGCM
    An Alternative for More Productive Rib Bolting in Underground Mining Applications

    By Joe E. Bryan, John P. McDonnell

    "Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib

    Jan 1, 2015

  • SME-ICGCM
    Study on the Modified Model of Probability Integra Method

    By Zhang Hongzhen

    The fast convergence of boundary is a major problem of probability integral method, especially for the prediction of mining under thick alluvium, abandoned mine goaf, etc. To solve this problem and im

    Jan 1, 2014

  • SME-ICGCM
    Geotechnical Challenges and Experiences of Working a Deep and Wide Longwall Face: A Case Study of Adriyala Longwall Project, SCCL

    By Gautam Benerjee, Veera Reddy Boothukuri, Bhattacharjee Ram Madhav, Panigrahi Durga Charan

    "India’s tryst with mechanized longwall coal mining started with the introduction of the first self-advancing powered support longwall (PSLW) face at Moonidih Colliery of Jharia Coalfield in 1978 and

    Jan 1, 2017

  • SME-ICGCM
    Study of the Behavior for Backfilling Material in Room-and-Pillar Coal Mining

    By Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes

    "Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results

    Jan 1, 2010

  • SME-ICGCM
    Coal Pillar Design in Tabas Central Mine of Iran

    By Mostafa Sharifzadeh, Ebrahim Ghasemi, Kourosh Shahriar

    "The Tabas Central Mine (TCM) is one of the underground coal mines located in the Tabas coal region, in the mid-eastern part of Iran. This mine is the first mechanized coal mine in Iran that uses the

    Jan 1, 2010

  • SME-ICGCM
    Field and Laboratory Studies for Mechanised Depillaring Under Easily Caveable Roof Strata

    By Ashok Kumar, Rajendra Singh, Arun Kr. Singh

    "A simple analysis of site conditions and capability of the mechanised depillaring (MD) operation found that this approach is suitable to address the strata control issues in coal pillar extraction un

    Jan 1, 2018

  • SME-ICGCM
    Options to Control Groundwater-Based Georisks along Geological Faults in the Large Scale Area of Influence of an Open Pit Mine

    By Markus Papst, Denise Millier, Daniel Beckers, Axel Preusse

    "At an open-pit lignite extraction mine in Germany, groundwater has to be pumped over a large area, which leads to subsidence at the surface. As long as the geology of the area of influence is homogen

    Jan 1, 2016

  • SME-ICGCM
    Roof Bolter Synthetic Mesh Handling System

    By Jonathan Duncan, Tim Burgess, William Kendall, Jens Lange

    "Steel wire mesh is the accepted standard for roof and rib skin control at most coal mines in the United States. Wire mesh is delivered to the mine in bundles that are heavy and awkward to handle. The

    Jan 1, 2010

  • SME-ICGCM
    Analysis of Ground Control Codes in the International Codes of the International Labour Organisation

    By Kazem Oraee-Mirzamani, Nikzad Oraee-Mirzamani, Arash Goodarzi

    "Unexpected movement of ground can potentially endanger lives, damage equipment or destroy property. Occupational accidents frequently occur with fatal consequences in developing countries with signif

    Jan 1, 2010

  • SME-ICGCM
    Modeling the Effect of Bolts on the Behavior of Rock Pillars and Associated Insights on Rib Reinforcement

    By Gabriel Walton, Sankhaneel Sinha

    "Rib failures are a major hazard in underground mining. When pillars are subjected to loading, extensile cracks are generated parallel to the excavation boundary, which can manifest as rib falls. A co

    Jan 1, 2017

  • SME-ICGCM
    The Introduction of Roof Bolting to U.S. Underground Coal Mines (1948-1960): A Cautionary Tale (fc50b3c4-830d-49aa-a1be-7477dcdf44ae)

    By Chris Mark

    Perhaps the most significant development in coal mine ground control during the last century was the introduction of roof bolting during the late 1940's and 1950's. From an engineering stand

    Jan 1, 2002

  • SME-ICGCM
    An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the Overburden

    By Guy Reed, Russell Frith, Kent Mctyer

    "Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l

    Jan 1, 2016

  • SME-ICGCM
    Development Of Roof Stitching As A Method Of Support In Indian Coal Mines

    By B. Singh

    The use of wire ropes has already been tried in a few countries for roof support In mines. But the use of scrap wire ropes, as a method of support on extensive scale has not been reported from anywher

    Jan 1, 1990

  • SME-ICGCM
    A Method to Determine the Corrosion Potential of Rock Bolts on Coal Mines

    By Kanchan Mondal, Anthony (Sam) Spearing, Gopi Bylapudi, Joseph C. Hirschi

    "The U.S. coal mining industry uses about 100 million rock anchors per year. ASTM F432 specifies the requirements for rock bolts on mines but does not address corrosion. Corrosion has been found to be

    Jan 1, 2010

  • SME-ICGCM
    Investigations into the Corrosive Environments Contributing to Premature Failure of Australian Coal Mine Rock Bolts

    By Elia Elias, Alan Crosky, Paul Hagan, Damon Vandermaat, Serkan Saydam, Peter H. Craig

    "The University of New South Wales (UNSW Australia) had been involved in the study of premature failure of rock bolts in Australian coal mines from the initial identification of the problem in 1999 (C

    Jan 1, 2015

  • SME-ICGCM
    Progress in Managing the Geotechnical Aspects of Longwall Face Recovery

    By David Hill

    "End of panel longwall face recovery is almost certainly the most involved recurring geotechnical problem faced by operators, with major loss potential should problems occur. The paper presents Austra

    Jan 1, 2010