Problems With Dredging In Offshore AlaskaBy Richard H. T. Garnett
In 1900, placer gold was discovered on the beach of Nome, AK on the southern coastline of Alaska's Seward Peninsula (Garnett, 1991). The site is about 800 km (500 miles) from Anchorage. Nome is c
Jan 1, 1997
-
Pressure Oxidation at FirstMiss Gold’s Getchell MineBy Dale C. Matthews
Pressure oxidation of refractory gold ores is becoming more popular in what has become an environmentally sensitive society. This article discusses some specific process problems and solutions inv
Jan 1, 1991
-
Development Of A Hydrometallurgical Flowsheet For Precious Metal Recovery From A Sulphidic, Carbonaceous Gold Ore Containing Unusually High Silver ValuesBy C. A. Fleming, R. G. Williamson
Process development for Eskay Creek began in early 1990 at Lakefield Research, and was initially focused on producing a high-grade/high-recovery concentrate for sale. Owing to the significant base met
Jan 1, 1995
-
Flowing And Raveling ClaysBy Roy J. Leonard
Two small diameter sewer tunnel projects being hand dug under major highways in the Greater Kansas City area encountered problems which were unforeseen from the geotechnical engineering information su
Jan 1, 1987
-
Neural Network Coupled Acoustic Emission Sensors for Rock Grinding and DrillingBy S. L. Jung, T. L. Nichols, K. Prisbrey
The problem was to evaluate the on-line detection of rock properties through acoustic emission sensors. Acoustic emission sensors, when attached to crushers, grinders, and roof bolters, are robust, ec
Jan 1, 1993
-
Design And Construction Of Tunnel Built By Shield Of Rectangular Cross SectionBy Hidehiko Nakazaki, Sakuro Murayama, Mitsuo Miura, Masaaki Endo, Yoshiaki Hurukawa
This is a detailed report of construction experience of a tunnel built by a shield of rectangular cross section with reinforced concrete segments. In case of tunneling by a rectangular shield, there w
Jan 1, 1979
-
Geotechnical Factors Affecting Rock Slope Stability in Eastern TennesseeBy William F. Kane, Eric C. Drumm
Rock slope failures in the Great Smoky Mountains of Tennessee are a continuing problem. A study of the geotechnical factors affecting such slopes was conducted in this geologically complex region.
Jan 1, 1986
-
Use Of Recharge Wells To Maintain Groundwater Levels During Excavation Of The Milwaukee Deep TunnelsBy Steven W. Hunt, J. Patrick Powers, Roger C. Ilsley
Artificial groundwater recharge has been used successfully to mitigate water level drawdown in upper alluvial deposits during construction of the Milwaukee deep rock tunnels. Recharge wells in rock as
Jan 1, 1991
-
Use of Multimedia in Decision Support in the Environmental Disposal of Solid/Liquid WastesBy J. A. Rose, A. S. Atkins
Environmental awareness has become a paramount consideration in the issue of planning and licensing arrangements for the disposal of wastes associated with mining operations. In this con- text the dis
Jan 1, 1996
-
Offshore Prospecting And Mining Laws Of The United StatesBy J. L. Goodier
The paper points up the hesitance of private capital to pursue development of offshore mineral mining endeavors due to the deterrent effect of the clouded legal status of such endeavors. Some states
Jan 1, 1968
-
Mining Areas Ecological Rehabilitation Under The Economical RestructuringBy I. Dumitrescu
Since 1990, the entire Romanian mining industry has suffered a major restructuring, i.e. technical and economic. The large majority of the remaining active mines are these with a chance for economic c
Jan 1, 2008
-
Contaminants of the Underground AtmosphereBy William H. Mount
INTRODUCTION Effective mine ventilation is required to maintain a healthy underground environment for humans. Without effective ventilation, the environment can become unhealthy or hazardous as a r
Jan 1, 1982
-
Multiple-Seam Longwall Gate Road Pillar Design Using Modeling TechniquesBy Jeffrey M. Listak, Gregory J. Chekan
The U.S. Bureau of Mines, in an effort to improve coal conservation and utilization is currently investigating longwall panel layouts to maximize coal recovery and minimize interactive problems in mul
Jan 1, 1992
-
Use Of An Analytical Solution For Preliminary Estimates Of Ground Water Inflow To A PitBy L. C. Atkinson, E. A. Azrag, T. M. Hanna
The results of using a simple analytical solution and a relatively complex numerical model to estimate ground water inflow to an open pit mine are compared. The analytical solution assumes lateral, ra
Jan 1, 1995
-
Computer Imaging in the Mineral Industry Beyond mere aestheticsBy André G. Journel
As opposed to graphics applications in medical sciences and mechanical engineering, computer imaging of the subsurface faces a severe problem of data shortage. Most graphics softwares include an inter
Jan 1, 1992
-
Update on "The good, the bad, and the ugly," Silica revisitedBy E. A. Metz
It has been approximately four years since the International Agency for Research on Cancer (IARC) reclassified crystalline silica as a "group one" substance. Since then, crystalline silica has been co
Jan 1, 2000
-
Colemanite As An Important Source Of BoratesBy William T. Griswold
Few metals or industrial minerals can boast a better growth record over the past fifteen years than the borates. This period of growth occurred before the influence of any large-scale use in plastics
Jan 1, 1959
-
Genetic Algorithms For Controller Training: Effects Of Population Size On Training Accuracy And EfficiencyBy W. F. Hahnert, P. A. S. Ralston
In off-line training of a rule-based controller, the significant measure of successful training is the quality of control provided by the generated rule set. In an adaptive or on-line control environm
Jan 1, 1993
-
Refining Practices At Hecla's Escalante Silver MineBy S. Hartman
The Escalante Silver Mine in Southwest Utah produces an average of 71.000 kg (2.3 million troy ounces) of silver dore annually. Precipitates from a cyanide leach circuit are treated by either acid lea
Jan 1, 1989
-
Profit-based grinding controlsBy O. A. Bascur
The problem of setting the proper control objectives and/or having several objectives to be met in the implementation of grinding control strategies can be resolved. The design and implementation of a