Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Analysis and Case Study for Minimizing Differential Settlements in Piled Raft FoundationsBy Yu Chuang, Zai Jinmin, Liu Songyu
"The piled raft foundation is a geotechnical composite construction method, consisting of three elements, piles, raft and soils, which is applied for the foundation in an increasing number. Differenti
Jan 1, 2005
-
Seismic Response Of Raft Foundations Supported On Aggregate PiersBy Alper Turan
The use of aggregate pier foundation systems has become widespread as the engineering practice moves towards cost-effective ground improvement solutions that provide accelerated construction schedules
-
Seismic Response of Raft Foundations Supported on Aggregate Piers (f3188351-761b-458f-b00c-1bcc1cb9cf93)By Alper Turan, Hesham El Naggar
"The use of aggregate pier foundation systems has become widespread as the engineering practice moves towards cost-effective ground improvement solutions that provide accelerated construction schedule
Jan 1, 2017
-
Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, ORBy Vince Luongo
"INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project
Jan 1, 2006
-
As-Built Analysis - An Integral Part Of Pile Foundation DesignBy Dan Yang
Pile foundation designs are performed routinely based on geotechnical information available at the time of design, often with due consideration of large uncertainties inherent to soils and site condit
Jan 1, 2010
-
Grid Type Deep Mixing Applications to Liquefaction MitigationBy Masaki Kitazume
"Many earthquakes take place every year in Japan, in which the 1995 Hyogoken-Nambu earthquake and the 2011 Tohoku earthquake induced both a humanitarian crisis and massive economic impacts. As liquefa
Jan 1, 2015
-
Dam Wall Toe Stabilisation Using Mass Soil Mixing TechniquesBy David W. Martel, Tom George
"As part of the regional water authority review and upgrade of local dams a 35m x 5m x 3m wet soil mixed block was required for stabilisation of a dam wall toe in remote Victoria, Australia. Remote ac
Jan 1, 2015
-
Jet Grouting For Deep Excavation Support For Re-Entrant CornersBy Chu E. Ho
This paper reviews the design of jet grouting at re-entrant corners of excavations where the diaphragm wall and secant pile wall installation were interrupted by existing utilities in the streel sidew
May 1, 2022
-
Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity ProfilingBy Garland Likins, Gray Mullins, George Piscsalko
"Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or
Jan 1, 2016
-
Site Development and Foundation Planning for a Wastewater Treatment Plant ExpansionBy Steven R. Ahlfield, Ali Ghandeharioon
A wastewater treatment plant commissioned in 1978 is undergoing a major expansion. Planning various phases of the 8-hectare expansion at this site requires an understanding of the site response during
Jan 1, 2019
-
Design of a Raft Assisted Piled Foundation for a High Rise Prefabricated Hotel Structure in Perth, Wa.By Lucie Spencer, Craig Butterworth
"This paper presents the design of a raft enhanced pile group recently constructed for a hotel development in Perth, WA. At the time of construction in 2016 the hotel was the tallest prefabricated hot
Jan 1, 1900
-
Geophysical Applications For Highway Infrastructure, A RetrospectiveBy William M. Dalrymple, William P. Owen, Benjamin S. Rivers
For the California Department of Transportation (Caltrans), geophysical applications have played an important role as part of a successful multidisciplinary approach to subsurface characterization for
-
Pile Load Testing in New York CityBy Joel Moskowitz, Jan Cermak
"New York City has unique geologic conditions which must be considered when designing pile foundations. Where shallow foundations are not feasible, the City's subsurface conditions require a variety o
Jan 1, 2005
-
Undergraduate Learning CommonsBy William M. Tanner, Daniel C. Brahana
"A drilled pier foundation was originally designed to support the proposed G. Wayne Clough Undergraduate Learning Commons on the campus of Georgia Tech in Atlanta, GA. Reflective of the site geology,
Jan 1, 2015
-
Study Of Ground Settlement And Volume Loss Associated With Tbm Tunnelling By Analytical And Numerical MethodsBy Suresh Chikati, Gangadharan Santhanam
Twin tunnels were constructed to a length of 863m using TBM in one of the underground metro projects. The tunnels pass through complex geological conditions (soil, rock and mixed conditions). This pap
Sep 1, 2022
-
Washington Avenue Tunnel Project: Fortifying Aging Underground InfrastructureBy Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
Controlling Thermal Stresses in Barrier WallsBy Karsten Beckhaus
Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee
Sep 8, 2021
-
Is the use of Residual Strength Justified in Excavation Support Design?By George Aristorenas, Carlos Englert, Jesús Gómez
"Laboratory test data of strain softening soils exhibit the development of a maximum (peak) shear strength followed by a decrease in the strength with continued straining. The rate of strength loss de
Jan 1, 2015
-
Augered Cast-In-Place Piles Quality ControlBy Rudolph P. Frizzi
The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua
Jan 1, 2001
-
Dulles Metrorail/Silver Line (Phase 2) Drilled Shaft Lateral Load Testing ProgramBy William Billiet
"The Dulles Silver Line Phase II is an 11.4 mile extension of the Washington Area Metro Transit Authority’s Silver line in northern Virginia. There are three miles of elevated guideway, which are supp
Jan 1, 2017