One Seam At A Time: Interactive Quality Assurance To Identify Coal Seams During Foundation ConstructionBy Matthew Runion, Christopher Lawler
The Aeolus – Jim Bridger Transmission Line Project is located in southern Wyoming, home to some of the largest coal seams in the world. Coal seams present unique challenges to underground construction
-
Simplified Model for Increased Lateral Resistance of Deep Foundations Using Soil MixingBy Hubert Law, Dan A. Brown, Kyle M. Rollins
"Soil mixing and jet grouting provide a means to significantly increase the lateral resistance of pile group foundations with relatively little investment of time, effort, and expense compared to the
Jan 1, 2015
-
Load and Resistance Factor Design – Past, Present and FutureBy Silas C. Nichols, Jennifer E. Nicks
"Limit states design (LSD), or load and resistance factor design (LRFD), is a method to account for the uncertainty in loads and resistance through a reliability calibration that requires all applicab
Jan 1, 2015
-
A Tall Slender Tower Rises On Secant Piles and Drilled ShaftsBy Renzo D. Verastegui, T. C. Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala
"When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high rise towers in New York City. The 52-story condominium building is located on a 60 by 100 feet
Jan 1, 2016
-
“Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down MethodBy Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi
"The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,
Jan 1, 2016
-
Excavation-Induced Movement of Adjacent FoundationsBy Hugo Meggitt, Damian R. Siebert, Wystan Carswell
Excavation-induced ground movements are a critical component in the design and construction of deep excavations in urban settings due to the potential adverse effects on adjacent structures and infras
Jan 1, 2019
-
Installation of 10 Feet Diameter CIDHs in Soft Clay Using Rotator/Oscillator on TrestleBy Babak Mamaqani, Pirooz Barar
The Moanalua trestle spanned over Moanalua Stream, Honolulu, HI and was designed to accommodate construction of five 10 feet diameter cast in drilled hole (CIDH) piers as a part of Honolulu Authority
Jan 1, 2019
-
DEEP FOUNDATIONS INSTITUTE 45th ANNUAL CONFERENCE ON DEEP FOUNDATIONSBy Sebastian Lobo-Guerrero
Welcome to DFI45! our first on-line annual meeting. We cannot deny the severe impacts that the COVID19 pandemic is having in our industry and our lives. We extend our support to all of our members tha
Oct 27, 2020
-
Risk Management For Dam Rehabilitation ProjectsBy Dave Paul
Dam rehabilitation involves a range of design, construction, and operation risks, some of which are not encountered in new dam construction. These risks can have significant impact on project schedule
-
Comparison of the Pre-Construction and Production QC Test Results for the Sela-22 Elliptical Jet Grouting Project (New Orleans, LA)By Filippo Maria Leoni, Alessandro Bertero, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed by the U.S. Army Corps of Engineers (USACE) to reduce flood damages in the City of New Orleans and surrounding parishes through th
Jan 1, 2016
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation EffortsBy Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille
"Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair
Jan 1, 1900
-
Construction Of A Spillwall In The Columbia RiverBy Francis B. Gularte
The Dalles Dam is located 192 miles upstream from the Columbia River?s mouth. As part of an effort to increase survival rates for young salmon migrating downstream to the Pacific Ocean, a river spillw
Jan 1, 2010
-
Innovation In Spliced Prestressed Piles: Testing And Use Of The Emeca Pile SpliceBy John C. Ryan
The Emeca Pile Splice, an innovative mechanical prestressed concrete pile splice, is the first robotically welded splice to be fabricated in the United States. An analytical and experimental study wa
Jan 1, 2010
-
Incorporating Site Variability into LRFD Design of Pile FoundationsBy Murad Y. Abu-Farsakh, Md Habibur Rahman
The properties of all natural soil deposits are highly variable, and they are rarely homogeneous. Cone penetration tests (CPT) were used to assess the site variability, which was then incorporated in
Sep 8, 2021
-
Construction Of The Drilled Shaft Foundations For The Huey Long Mississippi River Bridge, New OrleansBy Dan A. Brown
The foundations at the Huey P. Long Bridge in New Orleans presented special challenges for construction due to the requirements for very deep drilled shafts in the Mississippi River beneath the existi
Jan 1, 2010
-
Innovative Driven Pile Solution for the Rhode Island Route 6/10 Interchange ProjectBy Seth H. Hamblin, Leo J. Hart, John E. Regan
The Route 6 /10 10 Interchange Design/Build project, located in Providence, Rhode Island, involves the design and construction of five (5) new elevated bridge structures to replace and reconfigure the
Jan 1, 2019
-
Cutter Soil Mixing Solutions at the Leixões Cruise TerminalBy Xavier Pita, Alexandre Pinto, António Cristovão, Rui Tomásio
"The cutter soil mixing technology was been applied in Portugal since the last seven years. The aim of this paper is to present the main design and execution criteria, related with both the cofferdam
Jan 1, 2015
-
Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, DcBy Douglas R. Hardin, Stanley L. Worst, Joanna Mason
A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St
Oct 1, 2022
-
Secant Pile Walls - A Consistent Approach to Risk ManagementBy Vivian M. Troughton, Clifford J. Wren, Tony P. Suckling
"Secant pile walls are used for the construction of deep basement walls and earth retaining structures. Risk associated with secant pile walls is commonly perceived as being the safety of site personn
Jan 1, 2005