Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Barrick?s Global Approach to Ground Control ManagementBy J. Ran
Ground instability is among the major causes of serious incidents and production disruptions in the mining industry and has a significant impact on safety. Mining companies may have operations in a nu
May 1, 2006
-
The Lonmin Floatability Characterization Test Rig (FCTR) experienceBy E. V. Manlapig, K. R. Rahal, J-P Franzidis
"The Floatability Characterisation Test Rig or FCTR is a highly instrumented, mobile flotation pilot plant built by Baker Process (now EIMCO) for the AMIRA P9 Project for use in flotation plant modell
Jan 1, 2002
-
Open Pit Mine Dewatering= Knob LakeThe purpose of this paper is to present the methods used in ground water control and the considerations that affected the development of these techniques. Production at Knob Lake is currently proceedi
Jan 1, 1965
-
Open Pit Mind Dewatering- Knob LakeThe purpose of this paper is to present the methods used in ground water control and the considerations that affected the development of these techniques. Production at Knob Lake is currently proceedi
Jan 1, 1965
-
The Onça Puma Nickel ProjectBy Ruy L. Rodrigues
Vale is in the early stages of commissioning its Onça Puma nickel operations. The project is meant for the production of 58,000 tpa of nickel contained in ferro-nickel, substantially contributing to t
May 1, 2010
-
Autoguided Vehicles in a Production EnvironmentBy Fabien Miller
Automation technologies are increasingly envisaged to improve underground mining productivity. However, the technologies need to be used and adopted gradually in order to get the best benefits. This p
May 1, 2002
-
The New Red Lake Mine: Narrow Vein Mining in Deep, Burst-Prone GroundBy Pierre Rocque
The Red Lake Mine is located approximately 600 km northwest of Thunder Bay. This 545 tpd (600 tons/day) underground narrow vein gold operation is set to produce in excess of 14.8 tonnes (475,000 ounce
Oct 1, 2001
-
Embedding Sustainability into Environmental and Social Impact AssessmentsBy Louise Pearce
?Environmental and social impact assessments (ESIAs) are: ??process-driven and scientific processes ??The process entails a number of steps and procedures which result in obtaining a licenceto ope
May 1, 2011
-
Global Approach to Managing Deep Mining HazardsA series of fault slip seismic events have occurred at Garson mine. The events have occurred during development advancement exposing faults, after the extraction of single stopes due to mining induced
May 1, 2009
-
Experimental and Commercial Magnetic RoastingBy R. I. Cavanagh, A J. Last
THE USE of higher grade charges in blast furnaces in the form of sintered or pelletized concentrates has been increasing rapidly. The question of beneficiation of iron ores for this purpose is therefo
Jan 1, 1961
-
A Novel Method for Dewatering of Iron Ore Tailings Based on Separation of Fine and Coarse FractionsBy M. Saghaeian, R. Hejazi, Fakoor Sanat Tehran Company, H. Abedini, M. Zare
"Dewatering of final tailings is one the biggest issues in iron ore processing plants. Because of the fine and hydrophilic particles in the iron ore tailings, dewatering of such material is difficult
Jan 1, 2016
-
Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank MineBy Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby
"Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe
Jan 1, 2017
-
The Measurement of Rock Pressures Induced by Mineral ExtractionBy A. N. May
"This paper describes the present approach of the Mines Branch to the problem of measuring the stress condition in the interior of rocks surrounding underground openings. An instrument, which will be
Jan 1, 1960
-
Restauration Du Site Minier Poirier (Joutel) - Expériences Acquises Et Suivi Des TravauxBy Richard Maurice
RÉSUMÉ La restauration du site minier Poirier, à Joutel s?est déroulée entre 1998 et 2001. Le principal élément des travaux a été la restauration du parc à résidus et des zones d?épanchement qui tot
Nov 1, 2002
-
Fine tuning tax reformBy Robert B. Parsons
"The tax reform process marches on. The December 16, 1987 measures tabled by Finance Minister Michael Wilson represent one more step toward the objective of total reform of Canada's income and sa
Jan 1, 1988
-
Developments in Fine Gravity Concentration Using the Bartles-Mozley TableBy R. O. Burt, D. J. Ottley
"SYNOPSISRecent developments in the use of the Bartles-Mozley table and the Bartles CTS screen are described for the gravity preconcentration of fine heavy mineral and metal particles present in low g
Jan 1, 1973
-
The Brewery Creek Heap Leach Project.By Brad Thrall
"Viceroy Resource Corporation of Vancouver, B.C. has recently developed the Brewery Creek Mine, an open pit heap leach gold mine 55km East of Dawson City in Yukon, Canada. Mineable reserves are 17.1 m
Jan 1, 1997
-
VXP2500 Stirred Mill Optimization at Casmyn Mining Turk MineBy D. Rahal, I. Shah, B. Hines, S. Reddick
"The development of stirred milling technology has proven to be an enabling technology in fine grained metallic deposits. The increased grinding efficiency allows for the economic size reduction requi
Jan 1, 2014
-
Architecture of Gold Mineralization at Anomaly A of the Clarence Stream Deposits, Southern New BrunswickBy A. J. Hynes, Lutes. G. G., Ravenelle. J. -F.
"The Anomaly A area of the Clarence Stream gold deposits in southwestern New Brunswick contains mineralized structures that bear geometrical relationships to regional folding events. The four minerali
Jan 1, 2008
-
Installation of Flash Flotation Units at the Louvicourt ConcentratorBy Bernard Dallaire, Jean Cayouette, Sylvain Duchesne
"Louvicourt Mine's concentrator, located near Val d'Or, Quebec, treats an average of 4,300 tonnes of ore per day composed mainly of copper, zinc, gold and silver. An analysis of concentrator revenues
Jan 1, 2001