Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Introduction to the SMART Benchmarking Program

    By Tom Demorest

    SMART is an association of mining companies that meet regularly to coordinate the technology development needed by the mining industry. Since 1995, the member companies and institutions have directed

    May 1, 2009

  • CIM
    The Simulation and Analysis on Die Casting Process of Copper Rotors

    By Mi, Dong Liang, Jingyuan Bai, Victor Zhou, Xujun

    Squirrel cage induction motors are the mostly used motors at present. Currently, the rotors of the squirrel cage induction motors are produced by aluminum die casting technique with the advantages of

    Jan 1, 2019

  • CIM
    Creep Deformation and Mechanisms of AJ (Mg-Ai-Sr) Alloys

    By M. Kunst

    The creep behavior of three AJ62 alloys was investigated in a wide range of stresses and temperatures. Multi-level tensile creep tests revealed a distinct primary creep stage and a high stress exponen

    Jan 1, 2006

  • CIM
    Applications of GPS-based navigation systems on mobile mining equipment in open-pit mines

    By Jonathan Peck, Carl Hendricks

    "Global Positioning Satellite (GPS) based positioning and navigation systems have been recently developed and implemented by AQUILA Mining Systems Ltd. on blast hole drills and electric cable shovels

    Jan 1, 1997

  • CIM
    Large adjustable-speed AC drives for the mining industry

    By G. Hausen, H. Micka

    "Modern signal and power electronics made adjustable-speed AC drives technically feasible and reliable and economically attractive. Cycloconverters are discussed as a proven technology for mine hoists

    Jan 1, 1988

  • CIM
    Non-Oxidative Acidic Treatment of Copper Sulfide Concentrates in the Flotation Circuit

    By A. Luszczkiewicz

    This paper presents the beneficial effects of non-oxidative leaching of final and intermediate copper sulfide concentrates with sulfuric acid prior to the final cleaning stage of flotation. This uniqu

    Jan 1, 2007

  • CIM
    Numeric Model of a Cemented Rockfill Span Test at the Turquoise Ridge Mine, Golconda, Nevada, USA

    By D. R. Tesarik

    Researchers from the National Institute for Occupational Safety and Health (NIOSH)1 and engineers from Placer Dome, Inc.2, conducted an underground rockfill span test at the Turquoise Ridge Mine near

    May 1, 2007

  • CIM
    In Situ Measurements for Geomechanical Design of Cemented Paste Backfill Systems

    By M. W. Grabinsky

    Better in situ performance data is required in order to advance the rational geomechanical design of cemented paste backfill systems. A few in situ test programs have been conducted, but these have su

    May 1, 2007

  • CIM
    CERM3 and its contribution to providing sustainable research for the mining industry

    By M. Veiga, L. Lavkulich, R. Pakalnis, M. Ghomshei, S. Baldwin, J. A. Meech

    "On July 26, 2000, the Canada Foundation for Innovation announced an award of $1.3 M dollars for The Centre for Environmental Research in Minerals, Metals and Materials, CERM3, at The University of Br

    Jan 1, 2003

  • CIM
    Optimum Equipment Management through Life Cycle Costing (c0e511d8-44ab-43ca-828c-72662e49cf23)

    By Jessica Barber

    Problem ? Mining operations consistently need equipment that is available, and able to perform to its maximum potential ? The most difficult part of a Maintenance Manager?s job is often a lack of kn

    May 1, 2008

  • CIM
    Safety Lessons Learned Building two Diamond Mines

    By D. L. Putnam

    Snap Lake Mine ?? Complex dyke ore body ?? Underground operation ?? 1.1 million tonnes per annum ?? 1.2 carats per tonne ?? On-site diesel power generation ?? Supply by ice road and air ?? Mile

    May 1, 2008

  • CIM
    The Role of the Center for Science in Public Participation in Mining Environmental Issues, with Perspective for Regulators and Industry

    By James R. Kuipers

    Center for Science in Public Participation CSP2 ? Organized in 1997 to provide technical assistance to public interest groups on mining and water quality issues ? 80%of effort devoted to direct su

    May 1, 2002

  • CIM
    Development Methods and Equipment at Lake Shore Mines, Limited

    By G. J. Birnie

    Introduction The preparation of the following paper has been undertaken in the belief that a description of the development methods and equipment used at Lake Shore, at the present time, will prove

    Jan 1, 1950

  • CIM
    Sample bias and conditional probability ore reserve estimation at Valley

    By G. F. Raymond, W. P. Armstrong

    "At the time of this study, the Valley mine was producing 23 000 tonnes of ore per day from a large, low-grade porphyry copper orebody. Sulphide mineralization, principally bornite and chalcopyrite, o

    Jan 1, 1988

  • CIM
    The Colomac Project

    By V. N. Bryant

    "1.0 SYNOPSISThe Colomac property, located 137 miles by air northwest of Yellowknife in Canada's NWT. will recover gold from 10,000 tons per day of open pit ore.The decision to proceed with the projec

    Jan 1, 1990

  • CIM
    Flooding and loss of the Patience Lake potash mine

    By D. Gendzwill, N. Martin

    "In early 1987, the Patience Lake potash mine near Saskatoon, Saskatchewan, was closed due to uncontrollable floodingWater inflows were first encountered during routine mining in 1975 at the south bou

    Jan 1, 1996

  • CIM
    Properties of Some High Aluminum Zinc Base Die Casting Alloys

    By O. A. Carson

    "IntroductionTHE ZINC-BASE die casting alloys in common usage contain approximately 4 per cent aluminum as the major alloy element. In addition, they contain about 0.05 per cent Mg .and may• have a sm

    Jan 1, 1953

  • CIM
    General Mining Conditions at Eldorado Beaverlodge

    By Norman A. Grant

    "Location and Transportation FacilitiesTHE BEAVERLODGE area of North Saskatchewan is on the north side of lake Athabasca, 500 air miles northeast of Edmonton.The main Eldorado operation and townsite a

    Jan 1, 1953

  • CIM
    Ore Thawer at Pine Point

    By R. J. Johnston

    "INTRODUCTIONPoint Mines is located about 65 miles east of Hay River on the South Shore of the Great Slave Lake. It is connected to the Northern Alberta Railway System by the Great Slave Lake Division

    Jan 1, 1972

  • CIM
    Compositional Block Kriging for Geometallurgical Optimization

    Adaptive processing is often related to the mineral composition of the mining block currently processed. The portions of waste, ore and secondary product minerals considered are always positive and ty

    Aug 1, 2013