Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Bronzes': A Study of the Changes in the Solid Alloys from 0-38.5 per cent Sn

    By O. A. Carson

    Introduction Although the equilibrium conditions of the copper-tin alloys have been the subject of a ?great amount of research, the equilibrium diagram is still in doubt. The first systematic in

    Jan 1, 1929

  • CIM
    An experimental investigation into the trapping model core pillars with reinforced fly ash composites

    By M. K. Mishra, U. M. R. Karanam

    Relative to slender pillars, larger size pillars exhibit improved strata control. Fly ash, though traditionally treated as a waste product, is emerging as an alternate engineering material. This paper

    Jan 1, 2008

  • CIM
    The Design of Long Horizontal Belt Conveyors

    By Zoltan F. Oszter

    The design of belt conveyors is a well-known procedure and related formulae can be found in any handbook dealing with materials handling. Belting and conveying equipment manufacturer's catalogues and

    Jan 1, 1962

  • CIM
    Geology and Mine Development of the Red Dog Zinc Lead Deposit, Brooks Range, Alaska

    By Brigitte J. Dejou

    The Red Dog sediment-hosted zinc-lead deposit is located in the Brooks Range thrust belt in northwest Alaska, approximately 1000 km northwest of Anchorage. The mine constitutes the primary deposit in

    May 1, 2006

  • CIM
    Urban mining — Recycling gypsum waste in Vancouver

    By J. A. McCamley

    Gypsum scrap generated from wallboard manufacturing, construction and deconstruction activities in North America, Europe and Japan is a recognized environmental problem. Landfill disposal of this gyps

    Jan 1, 2004

  • CIM
    Eldorado's Solvent Extraction Plant at Port Radium, N.W.T.

    By P. Bramwell, R. Tremblay

    "The Port Radium leaching plant of Eldorado Mining and Refining, Limited, produces 450 t./d. of sulphuric acid leach liquor containing l. 73 g. /I. U 308. After solvent extraction, the waste solution

    Jan 1, 1959

  • CIM
    Computer Control of Flotation at Mattagami Lake Mines

    By D. W. Hendriks, C. Daoust, K. V. Konigsmann

    "The concentrator of Mattagami Lake Mines Limited commenced operation in 1963. It had been designed with instrumentation proven at that time. New control techniques were added in subsequent years.An o

    Jan 1, 1976

  • CIM
    The Effect of Different Surface Treatments on the Fatigue Strength of Drill Steel

    By T. W. Wlodek

    In this paper the relative merits of shot peening, induction surface hardening, spiral-rolling, and the combination of these surface treatments, are evaluated on the basis of their capacity to increas

    Jan 1, 1958

  • CIM
    Start Up, Commissioning and Optimization of the Gravity Circuit at Atlantic Gold’s Moose River Project in Eastern Canada

    By C. Hudson, D. Tremblay, A. Frey

    "A discussion of the design, challenges and successes associated with the commissioning of the gravity recovery circuit at Canada’s newest open pit gold mine - Atlantic Gold’s Moose River Consolidated

    Jan 1, 2019

  • CIM
    The Mesozoic Clay Deposits of the Mattagami and Missinaibi Rivers, Northern Ontario

    By W. S. Dyer

    Considerable attention has been paid in recent years to the fire-clay and silica-sand deposits of the Mattagami and Missinaibi rivers and ? to the lignite occurring in them. The fireclay especially de

    Jan 1, 1928

  • CIM
    Results and Significance of Drilling Operations in the Athabaska Bituminous Sands

    By G. S. Hume

    Introduction Core drilling of the bituminous sands of northern Alberta has been carried on by the Mines and Geology Branch, Department of Mines and Resources, under the supervision of the Director,

    Jan 1, 1947

  • CIM
    Emergency Plan Methodology for Mine Fire Simulations in Chuquicamata Underground Mine

    By J. E. Carrasco, J. D. Stinnette, R. A. Alvarez

    "Chuquicamata Underground Mine is one of the main projects for the Chilean government copper company (CODELCO). Underground mine project has been under construction since 2013 and presents a solution

    Jan 1, 2019

  • CIM
    New Assessment Technique for LHD Vehicle Visibility

    Over the last three decades, the mining industry has been moving towards more underground mechanized mining methods and the number of LHD vehicles utilised has increased. The growth of mechanization a

    May 1, 2004

  • CIM
    Plant Scale Trial of Isobutyl Xanthate at Raglan Concentrator Using Reference Distributions

    By Norman O. Lotter, Dominic Fragomeni, Lori J. Kormos, Guy Comeau, Antonio Di Feo

    "A performance opportunity was identified for the Raglan concentrator operation by changing the selection of xanthate from Potassium Amyl Xanthate (PAX) to Potassium Isobutyl Xanthate (PIBX). This opp

    Jan 1, 2009

  • CIM
    Integrating Geometallurgical Parameters into Mining Grade Control at Operating Mines

    By William Shaw

    Conditional simulation is now an accepted tool for managing ore block design at a number of operating mines. It provides a way to consider the quality of data, local continuity and economic risk in de

    Oct 1, 2009

  • CIM
    Comparisons of the Geology and Proposed Underground Mining Methods of the Panda and Koala Kimberlites at the EKATI Diamond Mine

    By Peter A. Oshust

    The EKATI Diamond Mine has successfully completed the development and commissioning of the Panda Underground Project to extract the ore below the Panda open pit. The dominant kimberlite domain of the

    May 1, 2006

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Recovery of Uranium and the Lanthanides from Phosphate Rock

    By Fathi Habashi

    "A process is proposed for the treatment of phosphate rock for the recovery of uranium and the lanthanides. The process assures the production of phosphatic fertilizers without polluting the environme

    Jan 1, 1997

  • CIM
    Design and Development of an LHD for Narrow-Reef Mining

    By Patrick F. R. Murphy

    The mechanization of platinum group metal (PGM) underground reef mining in South Africa has posed a challenge to mining engineers for several decades. This is primarily due to the shallow dip angles a

    May 1, 2003

  • CIM
    The Benefits of Collaborative, Leveraged Industry-University Research Case Study of a McGill-CAMIRO Project

    By J. E. Nesset, L. S. Urbanoski, J. R. Goode

    "The benefits and advantages of pre-competitive, collaborative industry/university research are not always well appreciated. This paper presents the case study of a current collaborative project betwe

    Jan 1, 2001