Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Developments in Equipment Used for Overburden Removal and Coal Winning in the Brown Coal Industry Part 2 Utilization of Belt Conveyors

    On the 18th November, 19'58, the first coal was delivered to the Morwell Power Station from the adjacent Open Cut using conveyors for the transport of the coal from the working face to the boiler

    Jan 1, 1960

  • AUSIMM
    Advanced Modelling for Flotation Process Simulation

    By W T. Pate, A V. Potapov, J K. Lichter

    Even though flotation is one of the most important unit operations of mineral processing, accurate modelling of this process for plant performance prediction has remained elusive. In the last four to

    Jan 1, 2005

  • AUSIMM
    The Manufacture of Tungsten Powder and Ferro-Silicon at the Works of the Broken Hill Pty. Company Limited, Newcastle:

    Shortly after the outbreak of war in September, 1939, it became apparent that considerable quantities of certain metals and alloys which at that time were not being produced in Australia would be requ

    Jan 1, 1947

  • AUSIMM
    Seismic Monitoring at the Fimiston Open Pit Kalgoorlie Consolidated Gold Mines (KCGM)

    By J J. Jiang, M Reimnitz

    The Kalgoorlie Consolidated Gold Mines (KCGM) Fimiston Open Pit is mining through a dense network of disused level workings and open stopes of greatly varying sizes. The condition of the stope crowns

    Jan 1, 2003

  • AUSIMM
    Design, Construction and Commissioning of A 4 Tonne/Hour Matte Fuming Pilot Plant

    By Lightfoot BW, Foo KA, Conochie DS

    Aberfoyle Limited operated a matte fuming pilot plant, incorporating a SIROSMELT furnace in 1980/81. This plant was a significant advance in both smelting and tin extraction technology. Important

    Jan 1, 1984

  • AUSIMM
    Interferometric Synthetic Aperture Radar (InSAR) and its Potential to Monitor Subsidence Over Caving Zones Induced by Underground Mining

    By H Zahiri

    Utilisation of the InSAR technique for monitoring of subsidence in mining areas, employing open pit and underground mining methods, has large potential due to sensitivity and safety issues associated

    Jan 1, 2008

  • AUSIMM
    The Proposed Sydney Harbour Tunnel: A Progress Report

    Progress on this project will be verbally reported and a description given of the main features. A detailed feasibility study was completed in December 1986, and the Joint Venture has issued an En

    Jan 1, 1987

  • AUSIMM
    Intensification of the Slag Fuming Process at BHAS, Port Pirie

    By Lane D. P, Malone J. G

    The slag fuming furnaces are the major bottleneck in the BHAS zinc production flowsheet. Intensification of the fuming process could significantly reduce this production restriction. Oxygen enrichm

    Jan 1, 1989

  • AUSIMM
    New Developments in the Zinc Dust Purification of Zinc Plant Electrolyte

    By Chapman RL

    A new process has been developed to remove the impurities copper, cadmium, cobalt and nickel from a zinc plant electrolyte by cementation on zinc dust. The process has been tested in the laborator

    Jan 1, 1984

  • AUSIMM
    Prediction of Cross-Stream Sample Bias Using Discrete Element Modelling

    By G K. Robinson

    The existence of bias in samples taken by cross-stream sample cutters has been investigated using three-dimensional discrete element method (DEM) modelling. Detailed quantitative information on overal

    Jan 1, 2008

  • AUSIMM
    Clay Alteration at the Paddington Gold Mine, Western Australia

    By Booth GW, Robertson IG

    The Paddington Gold Mine ties within the Norseman-Wiluna greenstone belt, in the celebrated Eastern Goldfields province of the Yilgarn Block, Western Australia. Regionally, tropical to subtropical

    Jan 1, 1989

  • AUSIMM
    Process Information Management System at Mount Isa

    The implementation of a process information management system (PIMS) is to provide a single online, real-time information system. This system provides a unique and completely open view for everyone, b

    Jan 1, 2005

  • AUSIMM
    Cemented Rock Fill for Extraction of High-Grade Crown Pillars at Crusader Gold Mine

    By M Dorricott

    This paper describes the design, construction and performance of sill pillars using cemented development mullock at the Crusader Gold Mine. The orebody is some 35 m - 60 m in length, 5 m - 8 m wide, d

    Jan 1, 2002

  • AUSIMM
    Base Metal Skarn Deposits of South Korea

    Base metal skarns have provided most of South KoreaÆs Pb-Zn production since the end of the Korean War, with the bulk of production coming from the Yeonwha group of mines. Currently only the Kumho Zn-

    Jan 1, 1999

  • AUSIMM
    Geothermal Resources and Developments in New Zealand and the South West Pacific (bba7e742-bfb8-4679-8fb3-fcaeb6b9d1e2)

    The Southwest Pacific is a region of active volcanism and geothermal systems. Only in New Zealand have the geothermal systems been exploited for electricity generation and industrial processing. At pr

    Jan 1, 1990

  • AUSIMM
    Blast Performance Assessment using a Dragline Monitor

    By Geoff Baldwin

    The use of monitors to assess equipment performance is carried out on a routine basis in many industries. The benefits gained through process control in knowing exactly how the equipment is working

    Jan 1, 1990

  • AUSIMM
    Rehabilitation At Stawell Joint Venture

    It was once considered sufficient to revegetate old mine sites using grass or trees. At the commencement of the Stawell JV (SJV) operation in 1981, management determined that pre-existing vegetation w

    Jan 1, 1992

  • AUSIMM
    Energy Management

    An efficient energy management programme can often significantly reduce a company's energy costs. The programme consists of a series of steps, namely a statement of support from senior manage

    Jan 1, 1983

  • AUSIMM
    Phase Equilibria and Thermodynamics of Zinc Fuming Slags

    By P Hayes, B Zhao

    A range of materials are treated in zinc fuming processes to recover metal values and produce benign slag waste products. The selection of the optimum process conditions in these various technologies

    Jan 1, 2000

  • AUSIMM
    Shrinking Assets: Recovery Compared to In Situ Estimation

    Mining projects frequently fail to meet their financial objectives. A significant area of poor performance lies in the areas of resource estimation, reserve definitions, selective mining and metal a

    Jan 1, 1998