Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Explosion Parameters of Selected N.S.W. Coals

    A laboratory investigation was carried out to obtain data on the explosive character- istics of selected coals mined in New South Wales. Seven coal seams were sampled and the volatile matter conten

    Jan 1, 1981

  • AUSIMM
    Kalgoorlie Nickel Smelter: Integration of Flash Smelting and Slag Cleaning within one Process Unit

    By Hohnen CA, Limerick JM, Hall DRT

    An uniquely-designed flash furnace for smelting of nickel concentrate and for the recovering of metal values from the slag generated has been in successful use for nearly six years. Within the las

    Jan 1, 1984

  • AUSIMM
    The Archaen of the Pilbara Block

    The geology and mineral deposits of the West Pilbara Goldfield are described and comparison is made with the Pilbara Goldfield,, In the West Pilbai'a Goldfield two adjacent environments are re

    Jan 1, 1964

  • AUSIMM
    Challenges in the Development of the Iranian Galandrud Coal Field

    By H Rouhullahi, E B. Veshki an, R Kottnauer

    The Galandrud coalfield is located approximately 20 km south from the coast of the Caspian Sea, Ruyan town, on the north slopes of the Alborz mountain range, in the elevation between 500 m (the Galand

    Jan 1, 2003

  • AUSIMM
    The Influence of Hydrogeological Condition of Tunnel Construction

    An extensive railway construction prog- ram in the People's Republic of China has required the excavation of many tunnels in difficult ground, particularly in mountainous regions. Conclusions

    Jan 1, 1987

  • AUSIMM
    Blast Design System

    ICI Australia has been developing PC-based software to assist the blast engineer to design and monitor open pit blasts. The scope of this software differs significantly from commercially available min

    Jan 1, 1992

  • AUSIMM
    The Relevance Of Borehole And Bore Core Evaluation To The Design Of Underground Coal Mines

    The relevance of borehole and bore core evaluation to the design of underground coal mines is illustrated by considering the technical parameters of colliery design and the information from which t

    Jan 1, 1977

  • AUSIMM
    Alternative Fuels for Pyrometallurgical Operations

    The impact on metallurgical operations of the hydrocarbon energy price hike can be greatly alleviated by recourse to alternative fuels. Information is provided on fuels such as coal, coke, coal-oi

    Jan 1, 1981

  • AUSIMM
    The Reduction of PbO-Silicate Melts Using CO

    By Hayes P. C

    The kinetics of reduction of PbO-silicate melts in CO-N gas mixtures at 900¦C have been studied. Rea~tion rates were measured by moni- toring the CO2 content of the product gas. A wide range of gas

    Jan 1, 1987

  • AUSIMM
    Bendigo Mine Grade Control

    Bendigo is AustraliaÆs second-most productive goldfield, having produced some 22 million ounces of gold between 1851 and 1954. Bendigo Mining Limited (BML), the sole lease-holder of the Bendigo Goldfi

    Jan 1, 2006

  • AUSIMM
    Installation of a Reichert Cone Concentrator at Renison Limited

    Gravity concentration of tin at Renison Limited uses tables and spirals to treat the various coarser fractions produced from sulphide flotation tailing. An acceptable final tailing cannot be made f

    Jan 1, 1978

  • AUSIMM
    Stockpiles and Their Role in International Resource Management

    Proposals designed to use stockpiles and buffer stocks to achieve price stabilization and better resource use have a long history. They are super- ficially simple to understand. The benefits seem c

    Jan 1, 1978

  • AUSIMM
    Online Light Element Slurry Analysis

    By M Kongas, K Saloheimo

    Concentrating lower and more variable grade ore resources to meet acceptable concentrate quality criteria requires removal of significant amount of gangue minerals. Monitoring plant feed mineralogy an

    Jul 15, 2013

  • AUSIMM
    Thermal Degradation of Lump Ore in the Top Shaft of Blast Furnaces

    By M Kilburn, A Edenton, M Adam, A Dehghan-Manshadi, R Smyth, L Lu

    The blast furnace is a counter current reactor. The counter current principle of the furnace makes it very efficient in transferring the heat and mass required to drive the reduction reactions inside

    Aug 12, 2013

  • AUSIMM
    Vertical Crater Retreat Mining in the Sudbury Basin

    Faced with rising costs and lower metal prices, several Ontario base metal sulphide mines have changed their method of mining to vertical crater retreat mining. This is a bulk mining method that utili

    Jan 1, 1989

  • AUSIMM
    The Design, Construction, Instrumentation and Performance of a Full-Scale Overburden Stockpile Trial for Mitigation of Acid Rock Drainage, Grasberg Mine, Papua Province, Indonesia

    By S Miller, A Neale

    As part of a long-term acid rock drainage (ARD) mitigation study, PT Freeport Indonesia has completed the construction of a highly instrumented, full-scale, experimental, overburden stockpile to furth

    Jan 1, 2003

  • AUSIMM
    Ore Control to Deliver Metal Production at Ridgeway Gold Mine

    By A Tomsett, J Rutter

    Ore control systems at Ridgeway have been designed to deliver gold and copper metal production through focussing on the ore characteristics that impact on mine and mill performance and ultimately meta

    Jan 1, 2002

  • AUSIMM
    Geological Domaining and Resource Estimation - A Discussion

    Interpreted geologic domains provide the geologic architecture of many current models used to estimate the potential economic resources in mineral deposits. The spatial extent of each domain is usuall

    Sep 26, 2011

  • AUSIMM
    Use of Shotcrete Arch as Tunnel Support - A Case Study

    By B Shen

    The Wambo Rail Spur located near Singleton, New South Wales, Australia, runs for approximately 14 km linking the Mt Thorley rail loop and the Wambo Coal Mine. The project involves a 260 m long tunnel

    Jan 1, 2008

  • AUSIMM
    The Treatment Of Bore Cores To Provide Reliable Date For Coal Preparation Plant Design

    This paper describes the technique developed by the Australian Coal Industry Research Laboratories (ACIRL) for the treatment of bore core samples to obtain data for coal preparation studies of the

    Jan 1, 1977