Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    How Advances in Pyrometallurgical Treatment of Copper and Nickel Sulphide Have Added Value to the Non Ferrous Metal Industry

    Almost from the beginning of civilisation the inhabitants hadlearned the art of recovering and working copper to produceitems which were of use to society.From the early beginnings of the use of coppe

    Jan 1, 1995

  • AUSIMM
    The Toxicity and Degradation of Cyanide in Mine Tailings

    By Linkson PB

    The presence of residual cyanide in mine tailings and fill sands may, under specific circumstances, lead to acute and/or chronic cyanide poisoning of the environment and individuals. In this paper

    Jan 1, 1987

  • AUSIMM
    The Design, Installation and Commissioning of the Northparkes MinesÆ Lift 2 Ground Handling System

    By I Ross

    The ground handling system needed for the second lift of the underground block caving operation at Northparkes Mines had to link into the existing infrastructure. Production requirements indicated tha

    Jan 1, 2005

  • AUSIMM
    Coobina Chromite Fines Plant û Designed on a Shoestring, Built in a Boom and Commissioned in a Bust

    Chromite ores have a long history of low pricing and for AustraliaÆs only chromite mine this has been a particularly tough challenge, especially as the mine is located nearly 400 km from the nearest p

    Jan 1, 2009

  • AUSIMM
    Optimising Leach Pad Construction Methods for Site Specific Applications

    By Thompson P, Sharma Y

    The paper describes the methodology and results from a study carried out by Telfer Gold Mine to optimise the materials and costs involved in construction of the pad for their dump leach operations.

    Jan 1, 1994

  • AUSIMM
    Hdyrocyclone Research and Development at Bougainville Copper Limited

    The developments in hydrocyclone classification in the milling circuit at Bougainville Copper Limited are discussed. A major change in cyclone size and improve- ments in operating conditions have be

    Jan 1, 1978

  • AUSIMM
    Improved Decopperising of Lead Bullion at Port Pirie

    By Miller M. J, Bauer J. C

    The continuous copper drossing process operated at Port Pine since 1962 has had limited copper removal capacity as determined by a maximum tolerable Cu/S ratio in feed and the level of sulphur in b

    Jan 1, 1989

  • AUSIMM
    Underground Mine Project Development

    This paper reviews factors involved in the feasibility stage of underground mine project development. Emphasis is placed on the need to first select the best method of extraction and make the most

    Jan 1, 1983

  • AUSIMM
    The Weipa Kaolin Project

    Comalco Limited has recently completed construction of a $50 million kaolin plant at the site of its bauxite mining and industrial minerals operation at Weipa. The plant will produce 100,000 tonne

    Jan 1, 1986

  • AUSIMM
    Coal Firing of Sirosmelt Processes

    By Taylor RN

    A simple apparatus for delivering pulverized coal as fuel to a SIROSMELT lance is described, and its performance in smelting tests is evaluated. Using the pulverized coal as fuel, the SIROSMELT fu

    Jan 1, 1987

  • AUSIMM
    Cost Comparison of Blasting and Mechanical Excavation

    By Yokozawa K, Yamamoto T, Kameoka Y

    Japan Construction Method and Machinery Research Institute has been conducting various field surveys of tunnel works and other excavation works, and the cost and efficiency of these two excavation

    Jan 1, 1987

  • AUSIMM
    Bezymianny Volcano: 35-Year Eruptive Cycle of Activity. Characteristic Types of Eruptions and Pyroclastic Deposits

    The paper discusses the characteristics of Be-zymianny activity during the last 2500 years. Three periods of increased activity have been identified which are the eruptive cycles lasting for 100-400 y

    Jan 1, 1990

  • AUSIMM
    Recent Developments in Strata Bolting in National Coal Board Mines in the United Kingdom

    Strata bolting/dowelling reinforcement techniques are being reintroduced into the mines of the National Coal Board. There are strong reasons for the selection of the full hole anchorage principle o

    Jan 1, 1971

  • AUSIMM
    Metallurgical Factors Affecting the Throughput and Efficiency of Mount Isa Heavy Medium Plant

    By Scott IA, Jefferson C, Dipasquale S

    This paper describes the use of modelling and simulation techniques in the analysis of the heavy medium plant at the Lead/Zinc Concentrator of Mount Isa Mines Limited. The objective of the study i

    Jan 1, 1987

  • AUSIMM
    Structure, Evolution and Economic Importance of the Taupo Volcanic Zone, New Zealand

    The Taupo Volcanic Zone (TVZ) is the largest active volcanic belt in New Zealand. It is

    Jan 1, 1987

  • AUSIMM
    High-resolution Characterisation of Gold Mineralisation at Plutonic Gold Mine, Western Australia – Evidence for the Late-stage Deposition of High-grade Gold

    By R M. Hough, G Duclaux, M A. Pearce, M F. Gazley

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Microcharacterisation, such as that described in this paper, provides understanding of a mi

    Mar 18, 2015

  • AUSIMM
    Hydrometallurgical Application of a Reciprocating Plate Extraction Column

    By Houlihan RN, Landau J

    A reciprocating plate column is described in which two sets of perforated plates are mounted alternately on two shafts and are reciprocated with a phase difference of 1800 between them. It is show

    Jan 1, 1975

  • AUSIMM
    Coal Dust Explosibility and the Coward Triangle

    By Jensen B

    The approach of using the Coward Triangle for the analysis of flammable mine gas mixtures has been examined for its application, to the flammability of coal dust/gas/air mixtures. Explosible lean limi

    Jan 1, 1994

  • AUSIMM
    Field Evaluation of Backfill Behavior in Deep Vein Mines

    By McNay L. M

    Two field studies to monitor fill pres sures and vein-wall deformation were conducted in mines of the Coeur d'Alene mining district in Idaho. Both operations employed cut-and-fill mining techn

    Jan 1, 1973

  • AUSIMM
    Winding Rope Practice At The Zinc Corporation, Limited And New Broken Hill Consolidated Limited

    The importance of good winding rope practice is stressed. Details of the ropes used for various duties in the four shafts of The Zinc Corporation, Limited (ZC) and New Broken Hill Consolidated Lim

    Jan 1, 1983