Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Acid and Oxygen Plant Commissioning at the Olympic Dam Copper SmelterBy Collins D. N
The Olympic Dam Copper Smelter Acid Plant is a hybrid plant capable of producing sulphuric acid from either sulphur burning, metallurgical gases or a combination of both. Commissioning of the Acid
Jan 1, 1989
-
The Relationship of Volcanism to Ore GenesisTo discuss this relationship both the problems of the mechanisms of ore accumulation and the origin and cause of volcanism must be faced. Volcanic activity is associated with hydrothermal activity
Jan 1, 1974
-
Sampling Challenges in Highly Dispersed Types of MineralisationBy C F. Prins, C LantuTjoul
Mineralisation in alluvial diamond or vein gold deposits is often hosted in trapping mechanisms. For instance, diamonds are nested in bedrock depressions such as gullies and potholes which were carved
Jan 1, 2005
-
Problems of Sampling and Assaying in Mesothermal Lode-Gold Deposits ù Case Studies From Australia and North AmericaBy M J. Nugus, S C. Dominy
Mesothermal lode-gold deposits often pose problems during sampling because of their complex and erratic gold grade distribution, and the presence of coarse gold. Effective sampling and sample preparat
Jan 1, 2003
-
Gas Properties of Australian CoalBy Hargraves A. J
At 4 MPa gas pres ure and 30°C the sorptive capacity of 10 selected Australian dried coal ranges from 17 to 23 m3/tonne of CH4 and 27 to 36 m3/tonne of CO2. Values for moist coals are about 25 pe
Jan 1, 1985
-
Mining Equipment Maintenance ManagementBy M Kuruppu
Large mining operations require a high percentage of the capital invested in mobile and fixed mining machinery. From an investment point of view this expenditure must be met by an equally high rate of
Jan 1, 2006
-
Research and Application of Total Tailings Backfill at Zhangmatun Iron MineBy Wang Xia, Zhou Aiming, Shi Shengyi
Zhangmatun Iron Mine is situated in the suburbs of Jinan city, Shandong, China. Because of surface environmental constraints, no suitable site can be selected to dispose of mill waste. The full mill t
Jan 1, 1998
-
Sulphides In Underground Mine Filling OperationsThe scope, pace and depth of mining is creating a need for improved ground control strategies to meet mine safety standards. Ground control and associated conservation problems relating to subsiden
Jan 1, 1973
-
Overview of Ore and Coke Screening in the Ore Blending and Materials Handling Sections at Newcastle SteelworksOver the past 12 years screening of materials has undergone a dramatic change in both the types and materials used in screen mats and the quality requirements of the finished product. With the mai
Jan 1, 1984
-
Regulation of Overland Flow in Queensland - Implications for the Mining IndustryBy K Marler
The Water Act 2000 includes provisions to manage the take of overland flow water. Overland flow water is water that runs across the land after rainfall either before it enters a watercourse, after it
Jan 1, 2006
-
Design, Inspection and Rehabilitation of the New Croton Aqueduct, New York CityBy A Fareth
Constructed between 1885 and 1891, the New Croton Aqueduct (NCA) in New York State is a 50 km long (31 mi) brick-lined tunnel conveying water from the Croton watershed north of New York City to distri
Jan 1, 2008
-
Ore Block Modelling and Structural Geology: Their IntergrationBy Hall C. E, Chrisholm J. M
Resource calculations for shear hosted deposits of any type are difficult regardless of which calculation technique is used. One of the main problems is the determination of the geometry of the minera
Jan 1, 1993
-
Rockburst PredictionRockbursts, as they occur in South African deep level gold mines, have a lot in common with natural earthquakes. Both violently release seismic energy and cause damage to underground and surface s
Jan 1, 1986
-
Mechanised Shields for Trenchless Sewer Construction in SingaporeBy Musa MA
Tunnel excavation for sewer construction long remained a labour intensive, hazardous and costly operation. Even with the of mechanical and semi-mechanical shields for tunnel excavation, many problems
Jan 1, 1993
-
The Use of Computer Graphics and Virtual Reality to Model FSV OperationsBy McClarnon D. J
This paper aims to provide the reader with an insight into the field of computer graphics and Virtual Reality (VR), and show how both have been applied to the general area of Free Steered Vehicle (F
Jan 1, 1995
-
Optimisation of Excavator Performance When Mining Complex Polymetallic OresBy U Dzharlkaganov, B Bekmurzayevand M
The principle conception is presented of timely planning of winning operations in complex-structural blocks and faces in week-24-hourly regime. For adequate description of complex interconnections of
Jan 1, 2003
-
Rock Cuttings for Railways-Construction Methods and GeologyRailway cuttings require the highest care in design and construction, as the pro- bability of failure concept does not allow any risks to be taken with hundreds of lives being dependent on continued
Jan 1, 1979
-
Prediction of Groundwater Flow in Fissured Limestone, Blendevale Prospect, Western AustraliaCurrent problems in predicting sub-surface strata movement and fracture development due to longwall mining have highlighted the need for more accurate, dependable methods of physical modelling of r
Jan 1, 1988
-
Inflow Prevention General Report (123a47d1-2352-42e5-bebb-dc22f4119702)The paper deals with the problems of grouting methods for fissured-porous rock. The paper describes design procedure, injection process patterns and hydrodynamic testing techni- que to plan grouting
Jan 1, 1988
-
Dragline Digging Methods in Australian Strip Mines - A SurveyBy Baafi EY
Open cut mining in Australia is facing the greatest challenge in its history in attempting to compete not only with other operations internationally, but also with underground operations domestically.
Jan 1, 1998