Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Investigation of Mixing and Rolling Drum Performance at Port Kembla’s Sinter Machine Through Full-Scale Sampling and Laboratory Scale ExperimentsBy D Maldonado
BlueScope Steel’s Port Kembla sinter machine underwent a major upgrade during mid-2009. The mixing and rolling drum (MRD) was thoroughly cleaned during the upgrade. Space factor measurements taken in
Jul 11, 2011
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mineBy M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017
-
Applying the Metrics Navigator to Establish Strategic Indicators for MiningBy D Tanzil, H Jones
Every mine will close! Charting a profitable course through mine operations to acceptable mine completion requires that risk and opportunity management planning of the mine life begin as early as poss
Jan 1, 2009
-
Defying Gravity – Brownfield Continuous ImprovementBy J Robinson, L D’Uva
"The Gold Fields group and Gekko Systems have successfully worked together on multiple projects, including at the St Ives, Agnew and Granny Smith operations in Western Australia, and the Damang operat
Oct 10, 2016
-
Open Pit Transition Depth Determination through Global Analysis of Open Pit and Underground Mine Production SchedulingBy K Dagdelen, I Traore
This paper presents an iterative net present value (NPV) maximisation method to determine the optimum surface to underground transition depth for an orebody to be mined by multiple open pits and an un
Nov 24, 2014
-
Setting for Success – Private Equity Exploration and Mining Project Buy-in to Listing and DivestmentBy A Keogh, P Allen, P Stoker
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Private equity (PE) firms are comparatively free of mandatory requirements for the level an
Mar 18, 2015
-
Continuing Education for the Australian Mining Industry WorkforceBy T O Aspinall
The Australian mineral industry involves a diverse range of expertise and skills. Within that, the mining industry, representing mine planning, mine management and equipment operation, has capital i
Jan 1, 1994
-
An innovative application of LJC Automatic Magnetic Flotation Separator in magnetite processingBy L Ding, B Xu, C Wang
In this paper, we introduce the term ‘LJC’ to refer to the LJC Automatic Magnetic Flotation Separator, which is an advanced technology developed by Longi Magnet, integrating various techniques such as
Sep 18, 2023
-
Conservation of South Australia Mining HeritageMany persons hold the opinion that the metal indus- ries are fortuitous and that the occupation is one of sordid toil, and altogether a kind of business requir- ing not so much skill as labour. But a
Jan 1, 1987
-
Leveraging Accuracy and Precision ù Multi-Phase Mass Balancing and Reconciliation as a Tool for Quality Data ManagementBy M Dunglison, P M. Cameron
Simultaneous mass-balancing of a mineral processing flow sheet results in adjustments to each data point that reflects the accuracy and precision across the full set of data. In this way, all the good
Jan 1, 2005
-
New risk assessment method for coal mine excavated slopesBy I Canbulat, J Oh, A Mcquillan, D Payne
This paper presents a new risk assessment tool for coal mine excavated slopes. This new empirical-statistical Slope Stability Assessment Methodology (SSAM) is intended for use by geotechnical engineer
Nov 30, 2018
-
An explosion of variety in the DeGrussa structural vineyardBy P J. Willems, B J. Junor
Blackwater Mine is in the central-southern Bowen Basin, immediately south of the township of Blackwater on the Capricorn Highway. The current open cut operation extracts coal from three main seams, de
Mar 22, 2022
-
The Interaction of Ethyl Xanthate and Cyanide in the Lead Roughing of a Mount Isa OreBy Johnson N. W, Quast K. B
Over the years there have been occasional references in the literature to the activating effect of cyanide in galena flotation with xanthates. These have usually been associated with the processing of
Jan 1, 1990
-
Planning for the Future – Development of Beneficial End Use from a Quarry Pit Lake, Victoria, AustraliaBy C D. McCullough, M Gerner
Rarely do opportunities arise allowing closure of a mine site to be planned as a key beneficial land use asset within a new urban growth area; particularly so well prior to cessation of mining.Pit lak
Jul 16, 2014
-
Research on the Shape and Particle Size Distribution of Caved Ore Mass in Sublevel CavingBy G J. Zhang
The shape and particle size distribution of caved ore mass in sublevel caving were investigated in this study. The paper first reviews the main factors affecting the shape and characteristic of caved
Jul 11, 2011
-
Proterozoic Iron Oxide-copper-gold Mineralisation in the Kangdian Region, South-west Yangtze Block, China – A Case Study on the Yinachang Fe-Cu-Au-Rare Earth Element DepositBy J Ding, H J Peng, S B. Zhu, L Hou, J R. Zhang, S Y. Wu
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Numerous Fe-Cu-Au-rare earth element (REE) deposits have been identified within the Palaeop
Mar 18, 2015
-
Use of Metallurgical Test Data in Resource Evaluation for Magnetite DepositsBy J N. Farrell
Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge
Jul 11, 2011
-
The Constructions of Sewage Tunnel by Tunnel Boring Machine with Slurry Transport SystemBy Matsuo T, Uga Y
The tunnelling work to construct a sewage trunk line designed by the Sewage Bureau of Kobe City along north side slope of Rokko mountain range incorporated an all ground condition type (broad spec
Jan 1, 1987
-
On The Relationship Between Quartz in the Coal Seam and Quartz in the Airborne Respirable Coal DustBy Mutmansky J. M, Organiscak J, Qin J, Bhaskar R
The results of a two-year research study into the relationship between quartz dust levels in host material and in respirable dust in continuous mining sections are presented in this paper. The exp
Jan 1, 1988
-
Uncertainty in Soil Sampling ù A Case StudyBy K Luthbom, A Lagerkvist
According to the Swedish Environmental Protection Agency, the number of potentially contaminated sites in Sweden is approximately 40 000. The funding for remediation from the Swedish Government alone
Jan 1, 2005