Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Quantifying Uncertainty in a Narrow Vein Deposit – An Example from the Augusta Au-Sb Mine in Central Victoria, Australia

    By A Fowler

    The unpredictability of the location, grade and width of narrow-vein deposits presents difficulties for mine geologists and engineers attempting to estimate, schedule, forecast and mine their deposit

    Aug 22, 2011

  • AUSIMM
    Setting Best Practice: FIFO at the Mount Keith Concentrator

    By S O. Hille

    Modern remote mining operations in Australia are more commonly trending towards fly-in/fly-out (FIFO) sites. This trend is driven by numerous factors including increased business centralisation, reduc

    Jan 1, 2002

  • AUSIMM
    Identifying and Dealing with Outliers in Resource Estimation

    By C De-Vitry

    In skewed distributions seen in many geochemical data sets, samples at the extreme ends of the distribution are often termed ‘outliers’. Samples considered as outliers can often make exploratory data

    Aug 18, 2014

  • AUSIMM
    Pit Backfilling - Managing Chemically Reactive Mine Wastes and Achieving Rehabilitation Objectives

    By A A. Puhalovich

    The placement of chemically reactive mine wastes in mined out pits (æpit backfillingÆ) is increasingly seen by industry as best practice to manage long-term environmental risks. This is primarily beca

    Jul 10, 2012

  • AUSIMM
    The development of DRI pellets for green steelmaking

    By C R. Ure

    To substantially reduce, if not eliminate, carbon dioxide (CO₂) emissions from ironmaking it is necessary to convert from blast furnace (BF) ironmaking using coking coal as the reductant to direct r

    Sep 18, 2023

  • AUSIMM
    Selection of Mine Water Management Options Considering both Water and Energy Impacts

    By M T. Nguyen, S Vink, M Ziemski

    On any given mine site the water system is contingent upon its initial design. Through time the initial design is adjusted by a myriad of water management options in order to improve water system perf

    Nov 26, 2013

  • AUSIMM
    Planning for Commercial Operation of the Honeymoon ISL Uranium Project

    A recoverable uranium resource, shown to be suitable for in situ leaching, was discovered at Honeymoon in South Australia in 1971. Exploration of the deposit was carried out during the period from 197

    Jan 1, 2002

  • AUSIMM
    An economic approach to optimising mill reline frequency – a case study of SAG mill relines at Rasp mine

    By C M. Standen

    The SAG mill at Rasp Mine has undergone a number of liner design modifications since commissioning in 2012, making liner wear and failure difficult to predict from historical data. During 2017, severa

    Aug 29, 2018

  • AUSIMM
    Gold Room Procedure at Lake View and Star, Ltd.

    Recovery of gold by smelting zinc dust concentrate has been carried on at Lake View and Star, Ltd., since July, 1930, when the Merrill-Crowe precipitation plant was first put into operation.Part I des

    Jan 1, 1948

  • AUSIMM
    Reducing Bench Turnover Time and Improving Shovel Digability

    By D Kavanagh, C Michaud

    "A continuous improvement initiative was identified at Kalgoorlie Consolidated Gold Mine’s (KCGM) Fimiston open pit with the goal of reducing bench turnover time and increasing shovel digability by im

    Nov 15, 2016

  • AUSIMM
    Integrating Community-Level Indicators of Well-Being into Future Collaborative Mine Planning

    By J Shandro

    This paper stems from recent multidisciplinary research between mining engineering and health researchers at the University of British Columbia and the University of Victoria, Canada. It considers the

    Nov 22, 2011

  • AUSIMM
    The Importance of Data Collection to the Blasting Process

    By J Hutchings

    An essential component to the management of any process is the measurement of key parameters, used to monitor, control, and provide the feedback necessary for improvement. This paper discusses how dat

    Nov 8, 2011

  • AUSIMM
    Application of RISKGATE to Coal Mine Tailings Dams

    By M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe

    RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan

    Jul 16, 2014

  • AUSIMM
    Distribution of impurity elements in oxygen-enriched top-blowing nickel smelting with Fe extraction-oriented slag adjustment

    By Y Cui, G Cao, H Zong, J Zheng, J Wang, S Yue, J Zhao, B Li

    The iron (Fe) concentration in nickel slag is high, making its recovery and utilisation a hot and challenging topic. In the nickel smelting process, using CaO instead of SiO2 to adjust slag’s composit

    Jun 19, 2024

  • AUSIMM
    Comparative Life Cycle Impacts of Deep Ocean Minerals and Land-based Counterparts

    By B C. McLellan

    The decline of ore grades on land, increasing demand and high prices for various minerals have led to an increased interest in mining the deep ocean sea floor. The potential deep ocean reserves are va

    Nov 4, 2015

  • AUSIMM
    Implementing and Improving the Mine Plan at the Mt Wright Project

    By D MacKay

    The Mt Wright Project is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Underground Development of

    Mar 21, 2011

  • AUSIMM
    Brisbane Airport Link Project – Design and Construction of the 26 m Span Kedron Caverns: Comparing Monitoring Data with the Design

    By I Coombes, M Trim, Y Sun, M McRae, A Spiegl, H Lagger, A Amon, P Barraclough, M Villeneuve

    The Brisbane Airport Link Project (AirportlinkM7) includes the design and construction of more than 12.5 km of tunnels, with the Kedron interchange including four ramp tunnels that intersect with main

    Sep 17, 2014

  • AUSIMM
    The Kwademen Gold Deposit: A Polymorphic Mineralization within a Precambrian (Birrimian) Greenstone Belt in Burkina Daso, West Africa: A Case History

    The Kwademen Au deposit was discovered in 1977- 1978 following a regional geochemical survey carried out as part of a UNDP (United Nations Development Programme) and BUMIGEB (Bureau des Mines et de

    Jan 1, 1988

  • AUSIMM
    Life-of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine

    By R G. Moreby, S Bluhm, FávonáGlehn, C Pascoe

    Resolution Copper Mine in Arizona, USA, is planned to be a 2000 m deep panel cave mine with virgin rock temperatures exceeding 80¦C in rock with high crystalline silica content, resulting in a very ch

    Jul 1, 2013

  • AUSIMM
    Flotation as an Operation of Macromolecular Mass Transfer

    By M R. Drumond

    The present work presents a new theoretical interpretation of the flotation process, which can also be applied to other mineral processing physical unit operations. This interpretation is part of the

    Jan 1, 2005