Search Documents

  • CIM
    Fine Grinding Investigations at Lake Shore Mines

    By The Staff

    THE object of the work was to increase the capacity of the plant and, if possible, to reduce costs of the actual unit grinding while doing so. The accompanying assays of an infra-sizer analysis of the

    Jan 1, 1940

  • NIOSH
    OFR-85-79 A Full-Scale Investigation Of The Fuel-Load Hazard Of Timber Sets In Mines

    By P. A. Croce

    A total of 17 mine gallery fire tests (23 including sub-tests) were completed during this report period (10/1/76 - 11/30/77), directed at identifying a hazardous timber-set fuel-loading in a mine pass

    Jan 1, 1978

  • NIOSH
    Health Perception In Workers Exposed To Hand-Arm Vibration: Prerequisite For Putting In Place An Effective Preventive Program In The Workplace - Introduction

    By Alice Turcot

    Knowledge of risks from exposure to hand-arm vibrations is usually presented by clinicians and researchers from a medical and engineering point of view. There is a strong need to develop innovative h

    Jan 6, 2006

  • SME-ICGCM
    Five Stress Factors Conducive To Bumps In Utah, USA, Coal Mines

    By Joe F. T. Agapito

    High stresses and adverse geology in deep coal mines in the state of Utah, USA, have caused numerous bumps. The larger bumps have been associated with seismic events with Richter magnitudes of 3.6 and

    Jan 1, 2000

  • NIOSH
    IC 8262 Minerals And The New Tariff Schedules Of The United States

    The Bureau of Mines has reviewed those portions of the "Tariff Schedules of the United States Annotated 1963" that are of interest to the minerals industry. This study shows to what extent rates of du

    Jan 1, 1965

  • SME
    Optimization In Large Tunnels

    By H. S. Rathor

    NTPC (National Thermal Power Corporation), a multi-unit organization, is generating 26% of India’s total power. This power is produced from its 14 coal based stations and 7 gas based stations. NTPC is

    Jan 1, 2005

  • SAIMM
    Winning Paper: Optimization Of A Raiseline At Mponeng Mine

    By N. Ragoonanthun

    Paper written on project work carried out in partial fulfilment of B.Sc. (Mining Engineering) degree This report investigates the optimization of a raiseline in order to open up the ore reserve qui

    Jan 1, 2003

  • TMS
    EMF Study Of Nb-Al Intermetallics

    By Pratheesh George

    Solid state galvanic cell with CaF2 as the electrolyte was employed for determining the thermodynamic properties of Nb-Al binary alloys in the temperature range of 973-1073 K. The activities and activ

    Jan 1, 2006

  • DFI
    Earth Pressure Distribution On Diaphragm Wall During Excavation

    By Ting Chinsu

    Diaphragm wall with tie-back cable is widely used for deep excavation, especially in the area with high density of buildings. This paper presents the measured earth pressure distribution on diaphragm

    Jan 1, 1991

  • NIOSH
    The NIOSH Shield Hydraulics Inspection And Evaluation Of Leg Data (Shield) Computer Program

    By Thomas M. Barczak, David P. Conover

    Longwall shields provide essential ground control in longwall mining, yet a high percentage of shields are operating at less than peak capacity and many at well below the rated support capacity due to

  • SAIMM
    Large-Scale Design And Testing Of An Improved Fine Coal Dewatering System ? Synopsis

    By M. Le Roux

    Fine coal (-500 µm) is notoriously difficult to dewater. It is not uncommon for a dewatered product to have a moisture content as high as 30 per cent after vacuum filtration. This poses several handli

    Jan 1, 2012

  • SME
    TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022

    By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell

    As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic

    Dec 1, 2022

  • SME-ICGCM
    Cavability Study Of A Competent Roof - A Case Study

    By T. N. Singh

    An evaluation was made on the cavability of the roof formation of Dishergarh seam including caving sequence, caving span, and load on powered support.

    Jan 1, 1994

  • AIME
    Relevant Factors for Development and Draw Control of Block Caving

    By Peter F. Weiss, H. Riedler, I. M. Moschitz, A. Olsacher, G. B. Fettweis

    CONTENTS : 1. NATURAL FACTORS Geology Petrography and Rock Mechanics Mining System Orientation Rock Bolting System Movability of the Ore Grain Size Distribution Permeability Contam

    Jan 1, 1981

  • CIM
    Environmental and Social Responsibility Practices ? Moving to a Global Level Playing Field

    By Arthur D. FitzGerald

    EDC established an Environmental Review Framework in 1999. Throughout the early fall of 2001, the Corporation held public consultations across Canada to strengthen that framework, leading to a public

    May 1, 2002

  • CIM
    Urban mining — Recycling gypsum waste in Vancouver

    By J. A. McCamley

    Gypsum scrap generated from wallboard manufacturing, construction and deconstruction activities in North America, Europe and Japan is a recognized environmental problem. Landfill disposal of this gyps

    Jan 1, 2004

  • NIOSH
    OFR-35-79 Development Of New Bond Release Criteria For Surface Coal Mines In The Eastern And Interior Coal Provinces Of The United States

    By William M. Knuth

    This study involved a review of bonding and bond release practices in the states of the Eastern and Midwestern Coal Provinces. Data was collected from regulatory authorities and site visits to documen

    Jan 1, 1978

  • AUSIMM
    Rehabilitation at Macraes Gold Mine

    The mining licence for the Macraes gold mine places emphasis on the progressive rehabilitation of the land to a state compatible with the landscape and environment that existed prior to mining activit

    Jan 1, 1992

  • SME
    Using Dynamic Anisotropy To Improve Resource Estimation

    By K. Zabrusky

    Estimation of high grade epithermal vein deposits can present challenges in correctly representing the continuity of grade within an undulating structure. One solution to this problem is to use dynami

    Feb 27, 2013

  • AUSIMM
    Development of the Professional Mining Technician – Henderson’s Underground Mine Continuous Improvement Program

    By C Rizzardi, M Callahan, J Mahon

    Henderson Operation’s underground molybdenum mine has been in production since 1976. Since that historic date, more than one billion pounds of moly has been produced, and over 120 Mt of ore extracted

    May 9, 2016