Search Documents

  • AUSIMM
    Presentation of the Institute Medal, 1976 to Laurence Charles Brodie-Hall, C.M.G.

    ADDRESS BY THE PRESIDENT OF THE INSTITUTE (MR. J. G. SYMONS) IN PRESENTING THE MEDAL TO LAURENCE CHARLES BRODlE-HALL, C.M.G.The Institute Medal is awarded to a select band of people who have rendered

    Jan 1, 1977

  • CIM
    Calibration of On-Stream X-Ray Analyzers

    By Jim Lauder, Russ Calow, Ken Maley, Michael Ounpuu, Stuart T. Caverly

    "Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Concession Street, Lakefield, Ont

    Jan 1, 1996

  • CIM
    Seismic Response to Mining at the Brunswick No.12 Mine

    By Brad Simser

    The Brunswick No. 12 Mine is a 10 000 tonne per day producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stopin

    May 1, 2003

  • AIME
    The Relation Of Sulphur To The Overpoling Of Copper

    By Stanislaus Skowronski

    OVERPOLED copper, as commonly defined, is copper which has been excessively reduced during the poling period of the refining process. Owing to its porosity, such copper is unfit for commercial purpose

    Jan 3, 1918

  • CIM
    Innovative Partnerships that Improve IT Support for Mine Planning and Management Processes

    By Rick Moignard

    Relationships between Information Technology providers and their clients are often segmented according to job specific tasks. As a consequence, technology providers tend to focus on automating repetit

    May 1, 2006

  • SME
    Construction of the Combined Sewage Overflow Tunnel for the City of Fall River

    By Shemek Oginski

    The 5 km (16,194 lf) of 6.1m (20 ft) diameter TBM driven tunnel built by the J.F.Shea Co. will serve as sewage overflow storage. The TBM tunnel and four connecting tunnels excavated by drill and blast

    Jan 1, 2005

  • NIOSH
    IC 9223 Intrinsically Safe 5-V, 4-A Rechargeable Power Supply

    By John J. Sammarco

    The U.S. Bureau of Mines has developed a regulated, intrinsically safe, rechargeable power supply for portable electronic equipment for underground use. The regulated output is ideal for microprocesso

    Jan 1, 1989

  • SAIMM
    A Trade-Off Study Between Down-Dip And Breast Mining On The Merensky Reef At Khomanani 2 ? Synopsis

    By S. J. S. Ferreira

    Anglo American Platinum's Khomanani 2 shaft changed over from down-dip mining to breast mining in 2004. The changeover was made to ensure that production targets were met, as it was said that pre

    Jan 1, 2012

  • SME
    Reduction Of Gold Inventory In Cyanide Heap Leaching

    By Thom Seal, S. J. Jung

    This paper will combine three SME annual meeting presentations on reducing gold inventory in cyanide heap leaching. Information on Part I – Side slope leaching (SME 2003), Part II – Determining the d

    Jan 1, 2005

  • NIOSH
    Development And Application Of The Coal Mine Roof Rating (CMRR)

    By Gregory M. Molinda

    The Coal Mine Roof Rating (CMRR) was developed 10 years ago to fill the gap between geologic characterization and engineering design. It combines many years of geologic studies in underground coal min

    Jan 5, 2007

  • SME
    NATM/SEM Analyses for San Francisco?s Transbay Extension Tunnel

    By Steve Klein

    The Transbay Downtown Extension (DTX) in San Francisco involves the construction of a large-span tunnel with a width ranging from 43 to over 60 feet. The tunnel will be excavated using the New Austria

    Jan 1, 2008

  • SME
    Super Cycle: The Future

    By Douglas B. Silver

    Super Cycle future The final topic is mining?s future. The most important questions are ?How much longer is the Super Cycle going to last? What should we expect to see going forward? How will the Sup

    Jan 1, 2008

  • SME
    The Construction of the Manhattan Water Tunnel, New York City ? Introduction

    By Edward (Ted) Dowey

    City Water Tunnel No. 3 is being built in order to provide a redundant system for delivering 4,542,500 m3 (1.2 billion gallons) of water per day throughout the five boroughs of New York City. The pres

    Jan 1, 2008

  • AUSIMM
    The Products of Boiling Hydrothermal Fluids in the Golden Cross Epithermal Deposit

    By M P. Simpson, J L. Mauk

    The Golden Cross, low-sulfidation, epithermal deposit shows a number of features that are directly or indirectly related to boiling hydrothermal fluids. Occurrences of lattice calcite and their quartz

    Jan 1, 2000

  • SME
    Thermodynamic Evaluation On Gold Oxidation And Reduction Mechanisms In Ammonium Thiosulfate Solution

    By H. Arima, T. Fujita, W. Yen

    The copper catalyzed gold oxidation and reduction mechanisms in ammonium thiosulfate solution were investigated by Eh-pH diagram based on the optimum reagent combination for 60 mass% -75 µm silicate o

    Jan 1, 2002

  • SME
    Reflected Light Microscopic Study Of The Mineralogy And Textures Of Experimental Nickel Concentrate Reactions With Slag (87248e93-6ecf-4234-acf7-380e66deeac9)

    By H. Y. Sohn, R. D. Hagni, M. K. Kojo

    Reflected light microscopy was used to study the mineralogy and textures of experimental reactions of a nickel concentrate with a slag. Such an interaction is an important step in the bath smelting o

    Jan 1, 2001

  • AUSIMM
    Far Southeast-Lepanto Porphyry-Epithermal Cu-Au Deposits, Philippines: Coupled Hydrothermal Processes Between the Porphyry and High-Sulphidation Environments

    The spatial and temporal evolution from the porphyry to high-sulphidation epithermal environment can be assessed by integrating new results on such deposits (Arribas et al, 1995; Hedenquist et al, 199

    Jan 1, 1999

  • SME
    Stability Of HDPE Pipes Under High Heap Loads

    By J. F. Lupo

    Heap and valley leach operations rely on solution collection piping placed within the heap to enhance both solution recovery and to assist overall solution management. The most common piping used in l

    Jan 1, 2001

  • AUSIMM
    The Golden Cross Project, Mill Closure, Mine Rehabilitation and Drainage Contract

    The Golden Cross project was a joint venture between Coeur NZ Ltd (80 per cent) and Viking Mining Company (20 per cent). The site is located in the Waitekauri Valley, 8 km north-west of Waihi, on the

    Jan 1, 2002

  • AUSIMM
    Optical image analysis of iron ore pellets and lumps using CSIRO software Mineral/Recognition

    By S Hapugoda, A Poliakov, E Donskoi, L Lu

    A significant amount of metallic iron in the world is produced in blast furnaces from iron ore pellets. To control the quality of pellets and to optimise pellet production, characterisation of both gr

    Jul 24, 2017