Search Documents

  • CIM
    Fracture Mechanics Numerical Modeling ? Potential and Examples of Applications in Rock Engineering

    By T. Backers

    In fracture mechanics modeling the rock mass is seen as the combination of rock material and fractures, which are evident on different scales. The activation and propagation of fractures dominates the

    May 1, 2009

  • DFI
    Nonlinear Response of Piles with Rigid Embedment: Lessons Learned from a Reduced- Scale Experiment

    By Camilla Favaretti, Benjamin Turner, Anne Lemnitzer

    Pile foundations are extensively used in the construction of various types of superstructures, including tall buildings, bridges, freeways and offshore structures. A fully constrained tip embedment su

    Jan 1, 2018

  • SME
    Derivation Of Mineral Processing Environmental Sustainability Indicators Using A DEA Weight-Restricted Algorithm

    By I. Tsolas

    This paper presents the use of non-parametric approach (i.e., data envelopment analysis, DEA) for the development of environmental sustainability indicators in mineral processing using environmental,

    Jan 1, 2008

  • AIME
    Mining Technology In 1964 – Underground Mining

    By C. David Mann

    Metal prices continued to improve in 1964, resulting in the opening of new mines and re- activation of old ones. Larger and deeper shafts are being bored. At the AEC's Nevada Test Site, a 72-in

    Jan 2, 1965

  • DFI
    Reliability Of Pile Prediction Methods - Summary

    By M. T. Davisson

    Pile compression load capacity prediction methods are divided into four categories for purposes of discussing their reliability compared to static load test results. The categories considered are: 1)

    Jan 1, 1991

  • CIM
    Investigation of Liner Wear at Chadormalu Semi-autogenous Grinding Mills

    By Mohammad Noaparast, Babak Fotoohi

    "Due to certain advantages in (semi-)Autogenous-Ball mill circuits in most of the high-throughput ore grinding units of mineral processing plants, much attention is paid to optimize the mill performan

    Jan 1, 2005

  • SME
    Project Cash Flows At Risk In Strip Coal Mining

    At present, discounted cash flow analysis is generally accepted as the preferred method of valuation of mine projects in surface coal mining. One of the major reasons for that is its ability to take i

    Jan 1, 2006

  • SME
    Molybdenum Flotation Practice - Cell Type Selection And Design Considerations

    Several of the larger copper projects recently built have included a molybdenum byproduct circuit as part of the overall project due to the favorable molybdenum market conditions and overall economic

    Feb 27, 2013

  • AUSIMM
    Geology, Chronology and Isotope Geochemistry of the Yaojialing Zinc-gold Deposit, Tongling Ore District, Anhui Province, China

    By Z S Chang, T F. Zhou, G X. Zhong

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Yaojialing zinc-gold polymetallic deposit is a newly discovered, large skarn deposit in

    Mar 18, 2015

  • AUSIMM
    CrusherMapperTM - A New Tool for Crusher Condition Monitoring

    CrusherMapperTM - A New Tool for Crusher Condition Monitoring The efficiency of mineral processing plants is entirely dependent on the availability of the plant equipment critical path. This typicall

    Sep 13, 2010

  • SME
    Placement Of Concrete Lining For Water Tunnel No. 3, Manhattan Portion

    By Robert Labbe

    The final tunnel lining for this project involved pumping vast quantities of concrete over large distances under the extremely busy streets of lower Manhattan. Approximately 68,000 cubic meters (89,00

  • IOM3
    Prospecting for natural zeolites: exploration model based on an occurrence in 300 m.y. old rocks near Werris Creek, New South Wales, Australia

    By P. G. Flood

    A simplified conceptual model shows how the arc flank to arc fringe areas adjacent to ignimbritic centres form a prospective zone for natural zeolites. Large alkaline lakes that serve as the repositor

    Jan 1, 1991

  • CIM
    Contaminant Problems in Agrium’s Canadian Phosphate Business

    By Julie Culverhouse, Dennis Grimm, Kieran Harding, Jean-Francois Boulanger

    "Agrium’s Canadian Phosphate Business (CPB) is comprised of Kapuskasing Phosphate Operations (KPO) in Northern Ontario, Canada’s only operating phosphate mine, and Redwater Phosphate Operations (RPO)

    Jan 1, 2011

  • CIM
    The Enviro-Clear Thickener, a New Concept in Clarification

    By P. D. R. Maltby

    "1. INTRODUCTIONMy talk today will discuss a new development in the thickening of slurries and clarification of waste water - the Enviro-Clear thickener. Several industrial installations of the thicke

    Jan 1, 1976

  • ISEE
    Optimization of Blasting Pattern in an Underground Coal Mine for Maximum Production with Minimum Roof Disturbance

    By R. Singh, M. Roy, D. Singh

    Success of a blasting pattern in Blasting-off-the-solid (BOS) in Bord (Room) & Pillar method of coal mining is judged by the percentage of pull achieved vis-à-vis the yield of coal produced in a blast

    Jan 1, 2003

  • NIOSH
    IC 7278 Some Suggestions on Care in the Use and Handling of Explosives in Coal Mines

    By Lloyd G. Fitzgerald

    "The dangerous nature of explosives makes them a potential hazard wherever they are used, but they are likely to exercise their greatest harmfulness under conditions inherent in coal mining. The ease

    Aug 1, 1944

  • SME-ICGCM
    Relationship between Mining Subsidence and Mining Depth in Strip Pillar Mining

    By Wenbing Guo

    Strip pillar mining method is one of the most important techniques for mining subsidence control in China. Mining depth is one of the most important factors that affect subsidence in strip pillar mi

    Jan 1, 2007

  • NIOSH
    RI 7607 An Experiment In Seismic Holography

    By G. L. Fitzpatrick

    Preliminary results of an experiment in seismic holography indicate that the techniques of acoustical holography may be successfully used with seismic waves to determine the size and general shape of

    Jan 1, 1972

  • SME
    Geotechnical Conditions and TBM Selection for the Bay Tunnel

    By Luke Erickson

    San Francisco Public Utilities Commission is planning to replace 5 miles of pipeline under San Francisco Bay. The tunnel will be constructed using an Earth Pressure Balance (EPB) TBM and will be the f

    Jan 1, 2008

  • CIM
    The Red Dog VIP Mill Optimization Project A Study in Fast-Track Project Execution and Alliance Contracting (5aae1f12-06e2-4656-a27b-a608072456ab)

    By George H. Hope, Steve Ciccone

    "The Red Dog Mine is both the largest known zinc reserve and the largest zinc producer in the world. The mine started in 1989, and by 1999 had increased production from approximately 300,000 tonnes pe

    Jan 1, 2003