Search Documents

  • CIM
    Advancing Sudbury Exploration with 3D Modelling

    By D. Richardson

    Presentation Objectives ?Demonstrate the utility of 3D modelling for visualizing exploration data ?Demonstrate the target generation ability of 3D model query methods Exploration Criteria -Example

    May 1, 2006

  • SME
    Evaluating Ventilation Parameters For Extended-Cut Mining – Preprint 97-148

    By J. P. Rider

    The number of extended cut mining systems has increased significantly in coal mines over the last decade, and there is a constant push to extend the face ventilation systems to even greater setback di

    Feb 24, 1997

  • CIM
    Factors Influencing the Expert System Profitability

    By Andy Fortin, André Vien, Christophe Bouché, Jeff McKay

    "The technology and equipment design of the Twenty-first Century permit us to exploit low-grade ore bodies with milled tonnages reaching 300,000 tpd. Because of their substantial operational costs (en

    Jan 1, 2003

  • CIM
    Haile Gold Mine Metallurgy and Flowsheet Review

    By P. Tittes, M. Deal, M. Spicher, S. McDaniel, J. Wickens

    "Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through se

    Jan 1, 2013

  • SME
    Safety Framework for Programmable Electronics in Mining (a95116c1-d58d-432f-ad32-8ea419ca1fb8)

    By John J. Sammarco

    Mining has one of the highest annual average fatality rates among major US industries. Health and safety dangers have been inherent to mining since the early days of picks and shovels. Even though mi

    Jan 1, 1999

  • AUSIMM
    Column Flotation of Iron Ore - Status and Advances

    By H Thanasekaran, L Christodoulou, J Kohmuench

    "Column flotation has been successfully applied to iron ore concentration since the 1980s with the goal of reducing silica content and allowing for the efficient production of pellet feed. Since then,

    Aug 12, 2013

  • SAIMM
    Presidential Address: The Mechanisation Of UG2 Mining In The Bushveld Complex

    By F. M. G. Egerton

    Mechanisation of mining operations is not a new concept in the world of mining. Machinery has been developed, manufactured and used for many decades in massive orebodies and coal mines, both locally a

    Jan 1, 2004

  • ISEE
    The Role of Particle Size and Shape on the Propagation of Reaction in Explosive and Pyrotechnic Formulations

    By James L. Austing, Allen J. Tulis, Ronald Pape, Ronald G. Draftz

    In a certain sense, the explosives industry began in the 13th century with the invention of black powder, which is an intimate mixture of sulfur, carbon black or charcoal, and potassium or sodium nitr

    Jan 1, 1995

  • CIM
    Precious-Metal-Bearing Volcanogenic Massive Sulphide Deposits, Campo Morado, Guerrero, Mexico

    By Robert Cluff

    The Campo Morado precious-metal-bearing, volcanogenic massive sulphide district occurs in a Lower Cretaceous felsic volcanic sequence in a northerly trending belt in the Guerrero Terrane in northeaste

    May 1, 2006

  • AIME
    Extractive Metallurgy Division - High-Purity Tantalum

    By R. F. Rolsten

    VAN Arkel 1 prepared ductile tantalum by the thermal decompoiition of tantalum pentachloride on a resistively heated wire (2000° C) in an evacuated bulb maintained at 100°C. Burgers and Basart2'3

    Jan 1, 1960

  • AUSIMM
    The Occurrence of the Tellurides at Norseman, Western Australia

    Gold recovered on the strikes at the Central Norseman mill, Norseman, Western Australia, has an approximate assay fineness of 850. Bullion recovered from the cyanide plant at the mine is of much lower

    Jan 1, 1944

  • TMS
    Preliminary Research on Preparation Al-Si-Ti Alloy With Aluminum Ash as Electrolysis Materials

    By Qingsheng Liu

    A new method of recycling aluminum dross for preparation Al-Si-Ti alloy was studied in this paper. This was carried out in two processes. first the aluminum doss was pretreated by leaching and calcini

    Jan 1, 2010

  • NIOSH
    OFR-3-83 Off-Highway Haulage Truck Overload Detection

    By J. A. Bartol

    A survey was made of accident data and operating practices related to overloading and uneven load distribution on haulage trucks in noncoal open pit mines. Safety and economic aspects were analyzed. A

    Jan 1, 1982

  • AIME
  • ISEE
    Journal: Blasting in the New Millennium: Blasters Take on the Role of Blast Site Manager

    By Steve Dillingham

    Today, a typical blaster is likely to wear many hats, including, but not limited to, supervisor, risk manager, safety coordinator, explosives engineer, communicator, as well as professional decision m

    Jan 1, 2001

  • CIM
    Computerized cost estimating for underground mines

    By J. B. Scott

    "A computerized cost estimating program developed with the use of the Lotus 1-2-3 spreadsheet program has produced dramatic savings in preparing estimates for operating costs, equipment fleet size and

    Jan 1, 1988

  • AUSIMM
    Tensile strength and shear strength properties of the adhering layer of granules in iron ore sintering

    By H Zhou, T Honeyands, M Zhou

    In iron ore sintering, packing the granules onto the sintering strand to form a porous bed with optimum permeability is a complex dynamic process. The packed bed voidage is the key factor determining

    Jul 24, 2017

  • SAIMM
    Optimization of geological lead-time in a feasibility study drill out—Two Rivers Platinum, Mpumalanga, South Africa

    By Hornsey R., P. van der Merwe

    The Two Rivers Project is a feasibility study to evaluate the UG2 chromitite layer on Dwarsrivier372KT, Mpumalanga Province, South Africa. The project, which commenced in August 2001, is expected to r

    Jan 1, 2003

  • AUSIMM
    The Public Sustainability Reporting Process

    By R Salmon, C Jones

    This paper examines the recent trend towards sustainability reporting and the application of the Global Reporting Initiative (GRI) æSustainability Reporting GuidelinesÆ. It also reviews reporting in t

    Jan 1, 2002

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2002